Skip to main content
PermitBase

Pleasant Grove building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Pleasant Grove, Utah.

Last verified 2026-07-03 · Source · Embed this page’s badge · Version history

Building department

Address
70 S 100 East, Pleasant Grove, UT 84062
Phone
801-785-5045
Email
Office hours
Mon–Thu 7:30 AM – 5:30 PM; Fri 8:00 AM – 12:00 PM, per pgcityutah.gov/departments/community_development/building.php. Fax: 801-785-8925 (published on the same page as a fax number, not an email address — no department email address is published on the Building Division page).

Inspection guide

See how inspections work in Pleasant Grove — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Pleasant Grove's own Building Division page (pgcityutah.gov/departments/community_development/building.php) still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the 2026-07-04 fetch. State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.
  • 2024 International Building Code (IBC), including Appendices C and J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Building Code (IBC)' (live re-check 2026-07-16).
  • 2021 International Residential Code (IRC) with Utah State Amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Pleasant Grove's own page, which lists '2021 International Residential Code w/ Utah State Amendments (IRC)' (live re-check 2026-07-16).
  • 2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Mechanical Code (IMC)' (live re-check 2026-07-16).
  • 2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Plumbing Code (IPC)' (live re-check 2026-07-16).
  • 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip and has been state law since before this project's original 2026-07-04 review. Pleasant Grove's own Building Division page still lists '2020 National Electrical Code (NEC)' (live re-check 2026-07-16) — a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip, of the same kind separately documented for American Fork's Solar checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.
  • 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Energy Conservation Code w/ Utah State Amendments (IECC)' (live re-check 2026-07-16).
  • 2024 International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).
  • 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Existing Building Code (IEBC)' (live re-check 2026-07-16).
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Pleasant Grove's Building Division page lists '2021 International Swimming Pool and Spa Code (ISPSC)' without qualifying it to residential provisions (live re-check 2026-07-16).
  • Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned anywhere on Pleasant Grove's Building Division page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.
  • No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Pleasant Grove's Building Division page does not list an IFC edition either, so there is no mis-citation to correct here.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Pleasant Grove's Building Division offices are open Monday–Thursday 7:30 AM – 5:30 PM and Friday 8:00 AM – 12:00 PM only, per pgcityutah.gov/departments/community_development/building.php.
  • The submittal fee (Plan Check Fee) is NOT collected at initial online application — the permit technician reviews the application first and then calls the applicant to collect it. Fee tiers: $250 (new single-family residential), $500 (new commercial shell), $250 (commercial remodel/tenant improvement), $75 (solar, basements, additions, pools, plan revisions). All submittal fees are applied toward the total cost of the building permit.
  • Pleasant Grove's own Building Division page states initial plan reviews for single-family residential development are completed within 14 business days under Utah Code § 10-6-160 — this is the only permit type with a published review-timeline figure; commercial and other permit types carry no published turnaround time as of 2026-07-04.
  • Pleasant Grove's Building Division page still lists the 2020 NEC as its adopted electrical code, even though Utah Code § 15A-2-103 mandates the 2023 NEC statewide — a PRE-EXISTING discrepancy (predates the 7/1/2026 code-cycle flip) of the same kind documented in American Fork's and Provo's own published materials. Contractors should confirm current NEC-edition enforcement directly with the Building Division (801-785-5045) before relying on the published page alone.
  • As of Utah Code § 15A-2-103's 7/1/2026 code-cycle flip (Ch. 47, 2026 General Session), the state-mandated editions are 2024 IBC/IPC/IMC/IFGC/IECC/IEBC, residential provisions of the 2024 ISPSC, and MBI 1200/1205, while the 2021 IRC (with Appendix AQ) and 2023 NEC did not change. Pleasant Grove's Building Division page still displays the pre-flip 2021 edition list for IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC (live re-check 2026-07-16, unchanged since 2026-07-04) and does not mention MBI at all — state law governs regardless.
  • Pleasant Grove City Code Title 9, Chapter 2 (Building Code) is a short, two-section chapter — 9-2-1 'Building Code Adopted By Reference' and 9-2-2 'Board Of Appeals' — consistent with adopting the state building code by reference rather than maintaining an extensive locally-amended building code; the full text of 9-2-1 could not be extracted because codelibrary.amlegal.com serves Pleasant Grove's code as a JavaScript SPA with no server-rendered content accessible to direct fetch, browser-header curl, or the site's own API endpoint (all attempts documented in localAmendments).
  • No department email address is published on the Building Division page — only a phone number (801-785-5045) and fax (801-785-8925).

Comparable nearby cities

Vineyard
Both in Utah County6 shared permit types~5 mi away
Compare fees →
Springville
Both in Utah County6 shared permit types~16 mi away
Compare fees →
Spanish Fork
Both in Utah County6 shared permit types~19 mi away
Compare fees →