Residential Building Permit (New Single Family) in Pleasant Grove, Utah
Required for new single-family residential construction in Pleasant Grove, regulated by the state-adopted 2021 IRC (with Utah State Amendments). A submittal fee is charged at application and applied toward the total building permit cost.
Verified 2026-07-20 · Source
When you need this permit
- New single-family residential construction
- Electronic copy of plans and engineering
- Site plan to scale
- Structural engineering plan review
- Gas line layout with pipe sizes called out
- Heat loss analysis
- SWPPP (Storm Water Pollution Prevention Plan)
- Contractor license number or Owner-Builder Certification Form Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 7 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IRC inspection sequence enforced by Pleasant Grove Building Division.
- 2
Framing
After framing, sheathing, and roof installed; includes MEP rough-in.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final
All work complete before occupancy.
See the full Pleasant Grove inspection guide — scheduling & re-inspection fees →
Tips
- The submittal fee ($250 for new single family) is a Plan Check Fee collected only after the permit technician reviews the application and calls the applicant — it is not paid at initial online submission.
- Initial plan review for single-family residential is a published 14-business-day statutory timeline under Utah Code § 10-6-160, confirmed on Pleasant Grove's own Building Division page.
- Owner-Builder Certification Form is available directly through Utah DOPL at dopl.utah.gov/contracting/additional-forms/. Owner-builder
- EV charger/EVSE installation is electrical work covered under this Residential Building Permit — Pleasant Grove's Fee Schedule page (pgcityutah.gov/departments/community_development/fee_schedule.php, checked 2026-07-20) lists only flat Building Permit Submittal Fees (New Single Family $250, All Others including Solar/Signs/Basements $75) with no EV-charger-specific or electric-vehicle line item anywhere on the page.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Pleasant Grove
Residential Building Permit (New Single Family) in other cities
Compare residential building permit (new single family) fees across Utah →