Sign Permit in Pleasant Grove, Utah

Pleasant Grove regulates signs under City Code Title 10, Chapter 19 (Signs And Outdoor Advertising). The city's official Fee Schedule publishes a $100.00 Commercial Signage Review fee and a $20.00 Commercial Temporary Use Sign fee under its Land Use Fee Schedule, separate from the $75.00 'All Others (Solar, Signs, Basements)' Building Permit Submittal Fee that applies to non-commercial sign work bundled with solar and basement permits.

Verified 2026-07-20 · Source

When you need this permit

  • Commercial signage is reviewed and permitted separately from residential/other sign work, per the Land Use Fee Schedule's Commercial Signage Review line item
  • Temporary commercial-use signs are a distinct, lower-cost category from permanent commercial signage

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Signage ReviewPleasant Grove City Fee Schedule, Land Use Fee Schedule, 'Other' section: 'Commercial Signage Review $100.'
$100.00
Commercial Temporary Use SignPleasant Grove City Fee Schedule, Land Use Fee Schedule, 'Other' section: 'Commercial Temporary Use Sign $20.'
$20.00
Building Permit Submittal Fee — All Others (Solar, Signs, Basements)Pleasant Grove City Fee Schedule, Building Permit Submittal Fees: signs are grouped with solar and basement-finish work under the 'All Others' $75 submittal fee category (applied toward the cost of the building permit), distinct from the separate Commercial Signage Review fee.
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Pleasant Grove?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Pleasant Grove inspection guide — scheduling & re-inspection fees →

    Tips

    • Pleasant Grove prices commercial sign review ($100.00 Commercial Signage Review) separately from the $75.00 'All Others' building-permit submittal fee that non-commercial signs are grouped under alongside solar and basement-finish work — confirm which category applies to your specific sign with Community Development.
    • A distinct, lower $20.00 fee applies to Commercial Temporary Use Signs, separate from the standard $100.00 Commercial Signage Review.

    Frequently asked questions

    Pleasant Grove requires a sign permit for: Commercial signage is reviewed and permitted separately from residential/other sign work, per the Land Use Fee Schedule's Commercial Signage Review line item; Temporary commercial-use signs are a distinct, lower-cost category from permanent commercial signage. If your project isn't listed, confirm with Pleasant Grove City Building Division (Community Development Department) at 801-785-5045 before starting work.

    Pleasant Grove's official Fee Schedule lists a $100.00 Commercial Signage Review fee, with a lower $20.00 fee for a Commercial Temporary Use Sign. Non-commercial sign work may instead fall under the city's $75.00 'All Others (Solar, Signs, Basements)' building permit submittal fee.

    Pleasant Grove does not publish a plan-review timeline for this permit. Contact Pleasant Grove City Building Division (Community Development Department) at 801-785-5045 for current turnaround.

    You'll need: Sign Permit / Commercial Signage Review Application. See the required-documents checklist on this page for details on each.

    Apply through Pleasant Grove City Building Division (Community Development Department) at 70 S 100 East, Pleasant Grove, UT 84062. Phone: 801-785-5045. Office hours: Mon–Thu 7:30 AM – 5:30 PM; Fri 8:00 AM – 12:00 PM, per pgcityutah.gov/departments/community_development/building.php. Fax: 801-785-8925 (published on the same page as a fax number, not an email address — no department email address is published on the Building Division page).. Official information: https://www.pgcityutah.gov/departments/community_development/building.php.

    Pleasant Grove, Utah has adopted: GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Pleasant Grove's own Building Division page (pgcityutah.gov/departments/community_development/building.php) still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the 2026-07-04 fetch. State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.; 2024 International Building Code (IBC), including Appendices C and J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Building Code (IBC)' (live re-check 2026-07-16).; 2021 International Residential Code (IRC) with Utah State Amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Pleasant Grove's own page, which lists '2021 International Residential Code w/ Utah State Amendments (IRC)' (live re-check 2026-07-16).; 2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Mechanical Code (IMC)' (live re-check 2026-07-16).; 2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Plumbing Code (IPC)' (live re-check 2026-07-16).; 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip and has been state law since before this project's original 2026-07-04 review. Pleasant Grove's own Building Division page still lists '2020 National Electrical Code (NEC)' (live re-check 2026-07-16) — a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip, of the same kind separately documented for American Fork's Solar checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.; 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Energy Conservation Code w/ Utah State Amendments (IECC)' (live re-check 2026-07-16).; 2024 International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Existing Building Code (IEBC)' (live re-check 2026-07-16).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Pleasant Grove's Building Division page lists '2021 International Swimming Pool and Spa Code (ISPSC)' without qualifying it to residential provisions (live re-check 2026-07-16).; Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned anywhere on Pleasant Grove's Building Division page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.; No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Pleasant Grove's Building Division page does not list an IFC edition either, so there is no mis-citation to correct here.. Local amendments apply — see the Pleasant Grove overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.