Commercial Building Permit — Pleasant Grove, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.pgcityutah.gov/departments/community_development/fee_schedule.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Pleasant Grove, Utah
Required for new commercial construction in Pleasant Grove, regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026). This entry is the canonical-slug counterpart to Pleasant Grove's 'New Commercial Shell Building Permit' entry (slug new-commercial-shell-permit) already in this dataset — same real permit, same $500 submittal fee, same underlying research and sourcing; added here under this corpus's standard canonical slug/name (commercial-building-permit) so lookups by the standard slug resolve to real Pleasant Grove data rather than a gap. Source URLs re-verified live on 2026-07-19 (both pgcityutah.gov pages returned HTTP 200 with the same figures as originally recorded).
Verified 2026-07-19 · Source
When you need this permit
- New commercial shell construction
- Electronic copy of plans and engineering
- Site plan to scale
- Structural engineering plan review
- Gas line layout with pipe sizes called out
- Heat loss analysis
- SWPPP (Storm Water Pollution Prevention Plan)
- Contractor license number or Owner-Builder Certification Form Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Framing
After framing, sheathing, and roof installed.
- 3
Final
All work complete before occupancy.
See the full Pleasant Grove inspection guide — scheduling & re-inspection fees →
Tips
- This entry mirrors Pleasant Grove's 'New Commercial Shell Building Permit' entry (slug new-commercial-shell-permit) in this dataset — same permit, same $500 submittal fee — filed here additionally under the corpus's canonical commercial-building-permit slug/name.
- The $500 submittal fee applies specifically to new commercial construction; Commercial Remodel/Tenant Improvement is billed separately at $250 (see the commercial-tenant-improvement-permit entry).
- No published commercial-specific plan-review turnaround time exists; the 14-business-day figure on the city's page applies only to single-family residential per Utah Code § 10-6-160.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Pleasant Grove.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Pleasant Grove
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Pleasant Grove project checklist
Describe your project once and get every permit, document, and fee it triggers in Pleasant Grove — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →