Solar / Basement Finish / Addition / Pool / Plan Revision Permit — Pleasant Grove, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://www.pgcityutah.gov/departments/community_development/fee_schedule.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar / Basement Finish / Addition / Pool / Plan Revision Permit in Pleasant Grove, Utah
Covers solar PV installations, basement finishes, residential additions, pools, and plan revisions in Pleasant Grove — grouped under a single flat submittal fee category per the city's own published fee table.
Verified 2026-07-03 · Source
When you need this permit
- Solar PV installation, basement finish, residential addition, pool installation, or a plan revision to an already-submitted project
- Wall section (for structural scopes)
- All rebar size, spacing and length (where applicable)
- Site plan
- Contractor license number or Owner-Builder Certification Form Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Electrical/plumbing/structural rough-in as applicable to scope (solar electrical, basement MEP, pool bonding, etc.).
- 2
Final
Completed work verified before closeout.
See the full Pleasant Grove inspection guide — scheduling & re-inspection fees →
Tips
- This $75 flat submittal fee category bundles solar PV, basement finishes, residential additions, pools, and plan revisions — the lowest submittal-fee tier in Pleasant Grove's published schedule.
- Solar electrical requirements are governed statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)); Pleasant Grove's own Building Division page still lists a 2020 NEC adoption as of live re-check 2026-07-16 (see codesAdopted note on this pre-existing discrepancy).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Pleasant Grove's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Pleasant Grove yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Pleasant Grove lands. Privacy.
Other permits in Pleasant Grove
Compare solar / basement finish / addition / pool / plan revision permit fees across Utah →