Skip to main content
PermitBase

Springville building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Springville, Utah.

Last verified 2026-08-16 · Source · Embed this page’s badge · Version history

Building department

Address
110 South Main Street, Springville, UT 84663 (Attn: Building Dept. for permit payments)
Phone
(801) 489-2704
Office hours
Building and Inspections Department: Monday–Friday, 8:00 a.m. to 5:00 p.m., closed all major holidays, per Springville Residential Building Permit Checklist (July 2023). NOTE: Springville's Building FAQ separately states building-division phone coverage (staffer 'Hollie') runs 8:00 a.m.–1:00 p.m. mornings only — the 8 AM–5 PM window is the department's official posted hours per the Permit Checklist, phone/counter availability may be more limited.

Inspection guide

See how inspections work in Springville — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Springville City Code § 10-1-101 adopts 'the International Building Code and the International Residential Code, as published by the International Code Council and adopted by the… Show full text

    2024 International Building Code (IBC) — Springville City Code § 10-1-101 adopts 'the International Building Code and the International Residential Code, as published by the International Code Council and adopted by the State of Utah, including all State statutes, amendments and regulations' as the City Building Code; the statewide edition CURRENT as of 7/1/2026 is the 2024 IBC per Utah Code § 15A-2-103(1)(a) (confirmed by direct fetch of the live statute 2026-07-16). The 2021 IBC governed through 6/30/2026. Springville § 10-1-101 last amended by Ordinance 16-2025 (effective 7/15/2025).

  • 2021 International Residential Code (IRC) — per Springville City Code § 10-1-101 (defers to state-adopted edition) and stated on Springville's own Residential Building Permit Checklist (July 2023) and Basement… Show full text

    2021 International Residential Code (IRC) — per Springville City Code § 10-1-101 (defers to state-adopted edition) and stated on Springville's own Residential Building Permit Checklist (July 2023) and Basement Improvement Permit Checklist (July 2023): 'Building shall be designed to the 2021 IRC (International Residential Code)' [and, for basements, 'and State Amendments']. Unchanged by the 7/1/2026 code cycle per Utah Code § 15A-2-103(1)(b).

  • 2024 International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), and International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC) —… Show full text

    2024 International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), and International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC) — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(d)/(e)/(f)/(h)/(i) respectively, incorporated by reference via Springville City Code § 10-1-101's adoption of state-amended construction codes (confirmed by direct fetch of the live statute 2026-07-16). The 2021 editions of these five codes governed through 6/30/2026. The IECC is a single statewide edition — the statute contains no residential/commercial split. No Springville-specific edition citation for these individual codes was found beyond the statewide statute and Chapter 10-7 (Building and Construction Standards and Codes) cross-reference. The International Fire Code (IFC) is not adopted anywhere in Utah Code § 15A-2-103 and no Springville-specific IFC citation was found either.

  • 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g), the statewide-mandated edition that supersedes any locally-referenced older edition; UNCHANGED by the 7/1/2026 code cycle. Show full text

    2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g), the statewide-mandated edition that supersedes any locally-referenced older edition; UNCHANGED by the 7/1/2026 code cycle. NOTE: Springville's own 'Solar Permit Process' document (springvilleutah.gov, dated 2019) states 'System shall be designed to the 2015 IRC and 2017 NEC' — this document remains STALE relative to the current statewide statute; the 2023 NEC and 2021 IRC (both continuing unchanged past 7/1/2026) govern, per Utah Code § 15A-2-103, which supersedes outdated city documents.

  • The 2021 editions of IBC/IPC/IMC/IFGC/IECC/IEBC were superseded at the 7/1/2026 statewide transition; the entries above state the 2024 editions as current, with the superseded 2021 editions preserved as historical context. Show full text

    The 2021 editions of IBC/IPC/IMC/IFGC/IECC/IEBC were superseded at the 7/1/2026 statewide transition; the entries above state the 2024 editions as current, with the superseded 2021 editions preserved as historical context. The IRC (2021) and NEC (2023) editions were not affected by that transition. No Springville-specific city page (beyond the 2019-dated, stale Solar Permit Process document) independently states individual code editions for IBC/IPC/IMC/IFGC/IECC/IEBC.

Permit types & fees

Springville's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Springville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Springville lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
8units

8 buildings · $4.9M valuation

Trailing 12 months
53units

12 of 12 months reported · #73 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
31units

31 buildings · $18.5M valuation

7 month(s) reported to Census

Full year 2025
63units

54 buildings · $29.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Springville requires Planning & Zoning and Storm Water pre-approval through My City Inspector BEFORE the Building Division will receive and review a residential building permit application — this 2018-legislative-session-driven pre-review gate is distinctive to Springville among Utah County cities.
  • Unlike Provo (which bundles plumbing/electrical/mechanical into the building permit fee for structures with 4 or fewer units), Springville requires SEPARATE trade permits for electrical, plumbing, and mechanical work, each applied for and paid by the respective subcontractor.
  • Springville's own fee schedule (FY 2026 Comprehensive Fee Schedule, Building Fees section) does not publish a valuation table for the Building Permit Fee or Plan Check Fee — both are listed simply as 'Assessed by Plans Examiner.' A handful of flat fees ARE published directly on the city's Building FAQ: furnace/A/C replacement $51, re-roof $101. Both were re-read from rendered page images on 2026-08-16 and are unchanged.
  • Plan review deposit for a single-family dwelling typically runs $800-$1,100, confirmed within 2 business days of submission once square footage is known. Re-read from a rendered image of the live Building FAQ on 2026-08-16 and unchanged.
  • Initial residential plan review takes 14 business days per Springville's own Building FAQ; corrections are typically re-checked within 3 business days of resubmission. Commercial plan review takes 21 business days initially.
  • A building permit expires 180 days (six months) after issuance or the last inspection; renewing an expired permit costs half the original permit fee.
  • Re-inspections beyond the one included per required inspection cost $85 each. This rose from $65 between the July 2023 and 2026 editions of the residential and basement checklists, and now matches the commercial/tenant-improvement rate.
  • Springville's own 2019 Solar Permit Process document cites the outdated '2015 IRC and 2017 NEC' — this is stale; the current statewide-mandated 2021 IRC (through 6/30/2026) and 2023 NEC govern per Utah Code § 15A-2-103, which supersedes the outdated city document. UPDATE (2026-08-16): the solar-pv-permit entry's Power Department connection fees were re-grounded against the FY 2026 Comprehensive Fee Schedule by direct page-image review. The $350 single-phase '2S Meter Solar', the $700 three-phase 277/480V 200-Amp connection and the $0.04/kWh Customer-Owned Generation export rate are all unchanged; the three-phase 120/208V 400-Amp solar connection fell from $705 to $610. The FY 2026-2027 Interim Budget proposes raising the three connection fees to $425, $745 and $770, not yet adopted.
  • Payments are cash or check only (payable to Springville City, 110 S Main, Springville, UT 84663, Attn: Building Dept.) or e-check via My City Inspector's Xpress Bill Pay integration.
  • As of July 1, 2026 (confirmed by direct statute fetch 2026-07-16): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, and IEBC are CURRENT statewide per Utah Code § 15A-2-103 and govern permits issued in Springville from that date onward, replacing the 2021 editions. IRC (2021) and NEC (2023) continue unchanged.
  • FEE-SCHEDULE EDITION WATCH (recorded 2026-08-16): Springville is mid-cycle. The FY 2026 Comprehensive Fee Schedule is the current published edition, but the City's FY 2026-2027 INTERIM Budget (published July 2026) carries a Fiscal 2026-2027 Comprehensive Fee Schedule as its Exhibit B, laid out in two columns — an 'Approved Fee' column that reproduces the FY2026 figures and a highlighted 'FY 2027 Proposed Fee' column. The interim budget resolution's PART VI authorizes fees for FY2026-2027 by reference to that exhibit, and PART VII schedules final budget adoption after a Truth in Taxation hearing on 18 August 2026. Nothing in the Building Fees block is proposed to change, but several Power Department connection fees are. Re-check this record shortly after the final FY2027 budget is adopted.

Comparable nearby cities

American Fork
Both in Utah County12 shared permit types~17 mi away
Compare fees →
Saratoga Springs
Both in Utah County12 shared permit types~31 mi away
Compare fees →
Provo
Both in Utah County11 shared permit types~6 mi away
Compare fees →