Solar Panel (PV) Permit — Springville, Utah · Requirements sheet
Verified 2026-08-16 · Source: https://www.springvilleutah.gov/wp-content/uploads/sites/5/2019/07/Solar-Permit-Process.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Panel (PV) Permit in Springville, Utah
Required for rooftop or ground-mounted solar photovoltaic installations in Springville, per the city's official Solar Permit Process document. Because Springville operates its own municipal electric utility (Springville City Power), solar installations require BOTH a Building Permit (structural/electrical plan review) AND a separate Customer-Owned Generation Agreement/Application with Springville Power before the utility will install the required production meter — unlike Rocky Mountain Power cities where interconnection is handled entirely outside city government.
Verified 2026-08-16 · Source
When you need this permit
- Completed and signed building permit application including licensed installer information and system valuation (labor and materials)
- System shall be designed to the current statewide-adopted IRC and NEC editions (2021 IRC, 2023 NEC per Utah Code § 15A-2-103 as of 2026-07-19 — Springville's own Solar Permit Process document is dated 2019 and still cites the outdated '2015 IRC and 2017 NEC,' which the current statewide statute supersedes)
- All electrical equipment must carry UL listing
- Plan check deposit required (paid in full at submission) for systems larger than 4 kW
- Springville Power requires a completed Customer-Owned Generation Agreement and Customer-Owned Generation Application before installation of the utility meter
- Springville Power Standards require a dedicated production meter as part of the Customer-Owned Generation Agreement
- Payment of completion and performance bonds required when picking up the building permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 9 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Springville Solar Permit Process (official PDF, springvilleutah.gov/wp-content/uploads/sites/5/2019/07/Solar-Permit-Process.pdf) states: 'Plan check deposit required for systems larger than 4 kW at… Show full citationHide
Springville Solar Permit Process (official PDF, springvilleutah.gov/wp-content/uploads/sites/5/2019/07/Solar-Permit-Process.pdf) states: 'Plan check deposit required for systems larger than 4 kW at time of application and is due in FULL at time of permit submission. Contact office staff for amount.' No fixed dollar figure is published, consistent with Springville's standard 'Assessed by Plans Examiner' practice.Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 861: '2S Meter Solar — 350.00' (Resolution 2020-38). Show full citationHide
Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 861: '2S Meter Solar — 350.00' (Resolution 2020-38). Confirmed UNCHANGED from the FY2025 edition (line 826). NOTICE OF A PROPOSED INCREASE: the Fiscal 2026-2027 schedule in the FY 2026-2027 Interim Budget shows this line (line 858) with an Approved Fee of $350.00 and a highlighted 'FY 2027 Proposed Fee' of $425.00, not yet adopted. Current published edition as of 2026-08-16: the FY 2026 Comprehensive Fee Schedule (Exhibit B to the FY 2025-2026 Final Budget, uploaded 2025-09-25). A newer Fiscal 2026-2027 Comprehensive Fee Schedule exists as Exhibit B to the Springville City FY 2026-2027 INTERIM Budget (published July 2026), whose adopting resolution carries PART VI: 'Authorized fees and charges... during the 2026-2027 fiscal year shall be as shown on the Comprehensive Fee Schedule included in the Tentative Budget document as Exhibit B.' That FY2027 schedule is laid out in two columns — an 'Approved Fee' column and a highlighted 'FY 2027 Proposed Fee' column — and its Approved Fee column reproduces the FY2026 figures exactly. A Truth in Taxation hearing is set for 18 August 2026, with final budget adoption to follow; the resolution number is left blank in the published PDF.Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 869 (labeled 'NEW'): $700.00. Show full citationHide
Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 869 (labeled 'NEW'): $700.00. Confirmed UNCHANGED from the FY2025 edition (line 834). NOTICE OF A PROPOSED INCREASE: the Fiscal 2026-2027 schedule in the FY 2026-2027 Interim Budget shows this line (line 866) with an Approved Fee of $700.00 and a highlighted 'FY 2027 Proposed Fee' of $745.00, not yet adopted. Current published edition as of 2026-08-16: the FY 2026 Comprehensive Fee Schedule (Exhibit B to the FY 2025-2026 Final Budget, uploaded 2025-09-25). A newer Fiscal 2026-2027 Comprehensive Fee Schedule exists as Exhibit B to the Springville City FY 2026-2027 INTERIM Budget (published July 2026), whose adopting resolution carries PART VI: 'Authorized fees and charges... during the 2026-2027 fiscal year shall be as shown on the Comprehensive Fee Schedule included in the Tentative Budget document as Exhibit B.' That FY2027 schedule is laid out in two columns — an 'Approved Fee' column and a highlighted 'FY 2027 Proposed Fee' column — and its Approved Fee column reproduces the FY2026 figures exactly. A Truth in Taxation hearing is set for 18 August 2026, with final budget adoption to follow; the resolution number is left blank in the published PDF.Source: Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 870 (Resolution 2020-38), PDF page 20. Show full citationHide
Source: Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 870 (Resolution 2020-38), PDF page 20. The FY2025 edition listed this fee at $705.00 (its line 835), so this is a real change between editions. The current published edition is the FY 2026 Comprehensive Fee Schedule (Exhibit B to the FY 2025-2026 Final Budget, uploaded 2025-09-25). NOTICE OF A PROPOSED FURTHER INCREASE: the Fiscal 2026-2027 Comprehensive Fee Schedule in the FY 2026-2027 Interim Budget (published July 2026) shows this line at line 867 with an Approved Fee of $610.00 and a highlighted 'FY 2027 Proposed Fee' of $770.00, not yet adopted. That newer Fiscal 2026-2027 Comprehensive Fee Schedule exists as Exhibit B to the Springville City FY 2026-2027 INTERIM Budget, whose adopting resolution carries PART VI: 'Authorized fees and charges... during the 2026-2027 fiscal year shall be as shown on the Comprehensive Fee Schedule included in the Tentative Budget document as Exhibit B.' That FY2027 schedule is laid out in two columns — an 'Approved Fee' column and a highlighted 'FY 2027 Proposed Fee' column — and its Approved Fee column reproduces the FY2026 figures exactly. A Truth in Taxation hearing is set for 18 August 2026, with final budget adoption to follow; the resolution number is left blank in the published PDF.Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 846 (Ordinance #04-2018, Resolution #2017-39): 0.040 per kWh. Show full citationHide
Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, line 846 (Ordinance #04-2018, Resolution #2017-39): 0.040 per kWh. The same rate appears in the FY2025 edition at line 811, and the Fiscal 2026-2027 schedule prints an Approved Fee of 0.040 against a proposed 0.0400 — no change proposed. Copying this line out of the FY2026 PDF's text layer returns 0.0716, which is the Large Industrial 'Charge for all kilowatt hours used' from line 838 — read the rate from the page as published rather than from a copy-paste.Review timeline
Inspection process
- 1
Rough Electrical / Interconnection
Conduit runs, wire sizing, and disconnect placement verified before energizing, per the general four-way rough-in inspection process.
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified.
- 3
Production Meter Installation (Springville Power)
Springville Power Standards require a dedicated production meter to be installed as part of the Customer-Owned Generation Agreement, scheduled separately with Springville City Power (801-489-2750) after the building permit's electrical inspections are complete.
See the full Springville inspection guide — scheduling & re-inspection fees →
Tips
- Springville operates its own municipal electric utility (Springville City Power) — solar interconnection is NOT handled by Rocky Mountain Power. A separate Customer-Owned Generation Agreement and Application must be signed in person with Springville City Power (801-489-2750, 7 am-3:30 pm) before the utility will install the required production meter.
- The Plan Check Deposit is specifically triggered only for systems larger than 4 kW, per the city's official Solar Permit Process document — smaller systems may not require this deposit, though the base plan check fee still applies.
- Springville Power charges a solar-specific connection fee distinct from its standard electrical service fees: $350 for a single-phase '2S Meter Solar' connection, $700 for a 3-phase 277/480V 200-Amp solar connection, and $610 for a 3-phase 120/208V 400-Amp solar connection, per the FY 2026 Comprehensive Fee Schedule. The 400-Amp figure fell from $705 in the FY2025 edition. Watch this space: the FY 2026-2027 Interim Budget's fee schedule proposes raising all three to $425, $745 and $770 respectively, pending final budget adoption after the 18 August 2026 Truth in Taxation hearing.
- New (post-2017) Customer-Owned Generation customers are compensated for exported energy at a flat $0.04/kWh export rate rather than traditional net metering; customers who installed systems June 2008-December 2017 are grandfathered into the legacy net metering billing schedule through January 1, 2033, per Springville Power's published program materials.
- Springville's own Solar Permit Process document (dated 2019) still cites the outdated '2015 IRC and 2017 NEC' — this is stale; the current statewide-mandated 2021 IRC and 2023 NEC govern per Utah Code § 15A-2-103, which supersedes the outdated city document.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Springville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Springville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Springville lands. Privacy.
Other permits in Springville
Solar Panel (PV) Permit in other cities
Compare solar panel (pv) permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Springville project checklist
Describe your project once and get every permit, document, and fee it triggers in Springville — in one checklist. Free, for any city and any number of projects.
Get started →