Solar Panel (PV) Permit in Springville, Utah

Required for rooftop or ground-mounted solar photovoltaic installations in Springville, per the city's official Solar Permit Process document. Because Springville operates its own municipal electric utility (Springville City Power), solar installations require BOTH a Building Permit (structural/electrical plan review) AND a separate Customer-Owned Generation Agreement/Application with Springville Power before the utility will install the required production meter — unlike Rocky Mountain Power cities where interconnection is handled entirely outside city government.

Verified 2026-07-19 · Source

When you need this permit

  • Completed and signed building permit application including licensed installer information and system valuation (labor and materials)
  • System shall be designed to the current statewide-adopted IRC and NEC editions (2021 IRC, 2023 NEC per Utah Code § 15A-2-103 as of 2026-07-19 — Springville's own Solar Permit Process document is dated 2019 and still cites the outdated '2015 IRC and 2017 NEC,' which the current statewide statute supersedes)
  • All electrical equipment must carry UL listing
  • Plan check deposit required (paid in full at submission) for systems larger than 4 kW
  • Springville Power requires a completed Customer-Owned Generation Agreement and Customer-Owned Generation Application before installation of the utility meter
  • Springville Power Standards require a dedicated production meter as part of the Customer-Owned Generation Agreement
  • Payment of completion and performance bonds required when picking up the building permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 9 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Check Deposit (systems larger than 4 kW)Springville Solar Permit Process (official PDF, springvilleutah.gov/wp-content/uploads/sites/5/2019/07/Solar-Permit-Process.pdf), verbatim: 'Plan check deposit required for systems larger than 4 kW at time of application and is due in FULL at time of permit submission. Contact office staff for amount.' No fixed dollar figure is published, consistent with Springville's standard 'Assessed by Plans Examiner' practice for its general Building Permit Fee and Plan Check Fee.
Due in FULL at time of permit submission — contact office staff for amount.
2S Meter Solar (single-phase solar connection fee)Springville City FY2025 Comprehensive Fee Schedule, Exhibit B (Power Department Connection Fees, line 826): '2S Meter Solar — 350.00' (Resolution 2020-38). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19).
$350.00
(3PH) Direct Metered Service 277/480V - 200 Amp SolarSpringville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 834 (labeled 'NEW'). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19).
$700.00
(3PH) Direct Metered Service 120/208V - 400 Amp SolarSpringville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 835 (Resolution 2020-38). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19).
$705.00
Customer-Owned Generation Export Rate (Residential)Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 811 (Ordinance #04-2018, Resolution #2017-39). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19); matches the rate independently confirmed on Springville Power's own Customer-Owned Generation program pages.
$0.040 per kWh
Commercial Customer-Owned Generation Export RateSpringville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 812 (Ordinance #04-2018, Resolution #2017-39).
$0.040 per kWh

Review timeline

Plan review
Not published — contact the department

How long did your Solar Panel (PV) Permit permit actually take in Springville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Interconnection

    Conduit runs, wire sizing, and disconnect placement verified before energizing, per the general four-way rough-in inspection process.

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified.

  3. 3

    Production Meter Installation (Springville Power)

    Springville Power Standards require a dedicated production meter to be installed as part of the Customer-Owned Generation Agreement, scheduled separately with Springville City Power (801-489-2750) after the building permit's electrical inspections are complete.

See the full Springville inspection guide — scheduling & re-inspection fees →

Tips

  • Springville operates its own municipal electric utility (Springville City Power) — solar interconnection is NOT handled by Rocky Mountain Power. A separate Customer-Owned Generation Agreement and Application must be signed in person with Springville City Power (801-489-2750, 7 am-3:30 pm) before the utility will install the required production meter.
  • The Plan Check Deposit is specifically triggered only for systems larger than 4 kW, per the city's official Solar Permit Process document — smaller systems may not require this deposit, though the base plan check fee still applies.
  • Springville Power charges a solar-specific connection fee distinct from its standard electrical service fees: $350 for a single-phase '2S Meter Solar' connection, $700 for a 3-phase 277/480V 200-Amp solar connection, and $705 for a 3-phase 120/208V 400-Amp solar connection, per the FY2025 Comprehensive Fee Schedule.
  • New (post-2017) Customer-Owned Generation customers are compensated for exported energy at a flat $0.04/kWh export rate rather than traditional net metering; customers who installed systems June 2008-December 2017 are grandfathered into the legacy net metering billing schedule through January 1, 2033, per Springville Power's published program materials.
  • Springville's own Solar Permit Process document (dated 2019) still cites the outdated '2015 IRC and 2017 NEC' — this is stale; the current statewide-mandated 2021 IRC and 2023 NEC govern per Utah Code § 15A-2-103, which supersedes the outdated city document.

Frequently asked questions

Yes. Per the city's official Solar Permit Process document, a complete building permit submission is required, including a site plan, one-line diagram, system sizing calculations, and an engineering letter addressing added roof loading. Because Springville operates its own municipal electric utility, you must also sign a Customer-Owned Generation Agreement with Springville City Power (801-489-2750) before the utility will install the required production meter.

Per the Springville City FY2025 Comprehensive Fee Schedule, a single-phase '2S Meter Solar' connection costs $350.00; three-phase solar connections cost $700.00 (277/480V, 200 Amp) or $705.00 (120/208V, 400 Amp). Exported energy is compensated at a flat $0.04 per kWh Customer-Owned Generation Export Rate for both residential and commercial systems. A separate plan check deposit (amount confirmed by Building Department staff, 801-489-2704) applies to systems larger than 4 kW.

Springville does not publish a plan-review timeline for this permit. Contact Springville City Community Development — Building Division at (801) 489-2704 for current turnaround.

You'll need: Building Permit Application; Site Plan; Construction Drawings and One-Line Diagram; Inter-connection Location Details; System Sizing Calculations; Labels, Placards, and Equipment Photos; Racking Support Locations and Technical Data Sheets; Engineering Letter; Customer-Owned Generation Agreement and Application (Springville Power). See the required-documents checklist on this page for details on each.

Springville requires 3 inspection(s) for a solar panel (pv) permit, in order: Rough Electrical / Interconnection, Final / Structural, Production Meter Installation (Springville Power). Schedule each through Springville City Community Development — Building Division ((801) 489-2704).

Apply through Springville City Community Development — Building Division at 110 South Main Street, Springville, UT 84663 (Attn: Building Dept. for permit payments). Phone: (801) 489-2704, email: buildingpermits@springvilleutah.gov. Office hours: Building and Inspections Department: Monday–Friday, 8:00 a.m. to 5:00 p.m., closed all major holidays, per Springville Residential Building Permit Checklist (July 2023). NOTE: Springville's Building FAQ separately states building-division phone coverage (staffer 'Hollie') runs 8:00 a.m.–1:00 p.m. mornings only — the 8 AM–5 PM window is the department's official posted hours per the Permit Checklist, phone/counter availability may be more limited.. Official information: https://www.springvilleutah.gov/community-development/building-division/.

Springville, Utah has adopted: 2024 International Building Code (IBC) — Springville City Code § 10-1-101 adopts 'the International Building Code and the International Residential Code, as published by the International Code Council and adopted by the State of Utah, including all State statutes, amendments and regulations' as the City Building Code; the statewide edition CURRENT as of 7/1/2026 is the 2024 IBC per Utah Code § 15A-2-103(1)(a) (confirmed by direct fetch of the live statute 2026-07-16). The 2021 IBC governed through 6/30/2026. Springville § 10-1-101 last amended by Ordinance 16-2025 (effective 7/15/2025).; 2021 International Residential Code (IRC) — per Springville City Code § 10-1-101 (defers to state-adopted edition) and confirmed directly on Springville's own Residential Building Permit Checklist (July 2023) and Basement Improvement Permit Checklist (July 2023): 'Building shall be designed to the 2021 IRC (International Residential Code)' [and, for basements, 'and State Amendments']. UNCHANGED by the 7/1/2026 code cycle per Utah Code § 15A-2-103(1)(b) — confirmed by direct statute fetch 2026-07-16.; 2024 International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), and International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC) — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(d)/(e)/(f)/(h)/(i) respectively, incorporated by reference via Springville City Code § 10-1-101's adoption of state-amended construction codes (confirmed by direct fetch of the live statute 2026-07-16). The 2021 editions of these five codes governed through 6/30/2026. The IECC is a single statewide edition — the statute contains no residential/commercial split. No Springville-specific edition citation for these individual codes was found beyond the statewide statute and Chapter 10-7 (Building and Construction Standards and Codes) cross-reference. The International Fire Code (IFC) is not adopted anywhere in Utah Code § 15A-2-103 and no Springville-specific IFC citation was found either.; 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g), the statewide-mandated edition that supersedes any locally-referenced older edition; UNCHANGED by the 7/1/2026 code cycle. NOTE: Springville's own 'Solar Permit Process' document (springvilleutah.gov, dated 2019) states 'System shall be designed to the 2015 IRC and 2017 NEC' — this document remains STALE relative to the current statewide statute; the 2023 NEC and 2021 IRC (both continuing unchanged past 7/1/2026) govern, per Utah Code § 15A-2-103, which supersedes outdated city documents.; NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions of IBC/IPC/IMC/IFGC/IECC/IEBC as current with only a forward-looking mention of the 7/1/2026 flip; the effective date has now passed and the entries above have been corrected to state the 2024 editions as current, with the superseded 2021 editions preserved as historical context. IRC (2021) and NEC (2023) were NOT changed. No Springville-specific city page (beyond the 2019-dated, already-flagged-stale Solar Permit Process document) independently states individual code editions for IBC/IPC/IMC/IFGC/IECC/IEBC, so no additional city-page lag was found to record for those codes.. Local amendments apply — see the Springville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.