Skip to main content
PermitBase

Residential Building Permit in Springville, Utah

Required for new residential construction, additions, and structural alterations regulated by the adopted 2021 IRC. Springville requires pre-approval from Planning & Zoning and Storm Water departments (via My City Inspector) before the Building Division will receive and review the project — a 2018 Utah legislative change Springville implemented as a pre-review gate.

Verified 2026-08-16 · Source

When you need this permit

  • New single-family residential construction
  • Additions or structural alterations to existing residential structures
  • Building designed to the 2021 IRC (International Residential Code) per Springville Residential Building Permit Checklist (July 2023)
  • Planning & Zoning and Storm Water pre-approval through My City Inspector required before Building Division review begins
  • Payment of required fees before application and plans are reviewed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 7 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Plan Check Fee
Springville Residential Building Permit Checklist (2026 edition, read from a rendered page image 2026-08-16): 'Plan check fee is due in full at time of permit submission. Show full citationSpringville Residential Building Permit Checklist (2026 edition, read from a rendered page image 2026-08-16): 'Plan check fee is due in full at time of permit submission. Contact office staff for amount.' Confirmed unchanged in the Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, Building Fees, line 410: 'Plan Check Fee — Assessed by Plans Examiner (Resolution No. 97-13)' of PDF page 10. No valuation-based formula or flat rate is published. Current published edition as of 2026-08-16: the FY 2026 Comprehensive Fee Schedule (Exhibit B to the FY 2025-2026 Final Budget, uploaded 2025-09-25). A newer Fiscal 2026-2027 Comprehensive Fee Schedule exists as Exhibit B to the Springville City FY 2026-2027 INTERIM Budget (published July 2026), whose adopting resolution carries PART VI: 'Authorized fees and charges... during the 2026-2027 fiscal year shall be as shown on the Comprehensive Fee Schedule included in the Tentative Budget document as Exhibit B.' That FY2027 schedule is laid out in two columns — an 'Approved Fee' column and a highlighted 'FY 2027 Proposed Fee' column — and its Approved Fee column reproduces the FY2026 figures exactly. A Truth in Taxation hearing is set for 18 August 2026, with final budget adoption to follow; the resolution number is left blank in the published PDF. The FY2027 schedule leaves the Proposed Fee cell for this line blank, i.e. proposes no change.
Due in FULL at time of permit submission — contact office staff for the exact amount; no fixed published dollar figure.
Plan Review Deposit (Single Family Dwelling)
Springville Building FAQ (Building-FAQ-2.pdf), 'What is the plan review deposit amount?': 'It depends on the size of the building. Show full citationSpringville Building FAQ (Building-FAQ-2.pdf), 'What is the plan review deposit amount?': 'It depends on the size of the building. For a Single Family Dwelling it typically is between $800 - $1100. The plan review deposit amount will be provided with 2 business day of submitting the application where square foot calculations are available in the plan set.' Re of page 2 of the live PDF on 2026-08-16 and unchanged.
Typically $800–$1,100, depending on building size; provided within 2 business days of application submission once square-footage calculations are available in the plan set.
Building Permit Fee
Springville City FY 2026 Comprehensive Fee Schedule, Exhibit B, Building Fees, line 411: 'Building Permit Fee — Assessed by Plans Examiner (Resolution No. Show full citationSpringville City FY 2026 Comprehensive Fee Schedule, Exhibit B, Building Fees, line 411: 'Building Permit Fee — Assessed by Plans Examiner (Resolution No. 2007-06)' of PDF page 10 on 2026-08-16 (the line was numbered 410 in the FY2025 edition; the figure and mechanism are unchanged). No formula or flat rate is published. Current published edition as of 2026-08-16: the FY 2026 Comprehensive Fee Schedule (Exhibit B to the FY 2025-2026 Final Budget, uploaded 2025-09-25). A newer Fiscal 2026-2027 Comprehensive Fee Schedule exists as Exhibit B to the Springville City FY 2026-2027 INTERIM Budget (published July 2026), whose adopting resolution carries PART VI: 'Authorized fees and charges... during the 2026-2027 fiscal year shall be as shown on the Comprehensive Fee Schedule included in the Tentative Budget document as Exhibit B.' That FY2027 schedule is laid out in two columns — an 'Approved Fee' column and a highlighted 'FY 2027 Proposed Fee' column — and its Approved Fee column reproduces the FY2026 figures exactly. A Truth in Taxation hearing is set for 18 August 2026, with final budget adoption to follow; the resolution number is left blank in the published PDF. The FY2027 schedule leaves the Proposed Fee cell for this line blank, i.e. proposes no change.
Assessed by Plans Examiner — no fixed valuation table published.
Re-inspection Fee
Springville Residential Building Permit Checklist (2026 edition), at the URL this record cites: 'One re-inspection is allowed for each required inspection. Show full citationSpringville Residential Building Permit Checklist (2026 edition), at the URL this record cites: 'One re-inspection is allowed for each required inspection. Additional inspections require a $85 re-inspection fee.' The superseded July 2023 text of the same checklist listed $65.00; the 2026 edition at the same URL prints $85.00. Springville's residential and commercial re-inspection fees are now the same amount.
$85.00 for each additional inspection beyond the one re-inspection allowed per required inspection.
Permit Renewal Fee (after expiration)
Springville Residential Building Permit Checklist (2026 edition, rendered page image, 2026-08-16): 'A building permit expires 180 days (six months) after being issued or from the last inspection. Show full citationSpringville Residential Building Permit Checklist (2026 edition, rendered page image, 2026-08-16): 'A building permit expires 180 days (six months) after being issued or from the last inspection. If your permit expires, half of the original permit fee will be charged to renew it.' Unchanged.
One-half of the original permit fee.

Review timeline

Plan reviewSpringville’s published plan-review target
14+ business days

How long did your Residential Building Permit permit actually take in Springville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Before concrete pour.

  2. 2

    Foundation

    Forms, rebar, anchor bolts verified.

  3. 3

    Temporary Power / Power Trench

    Temporary power and power trench inspections per Springville Residential Building Permit Checklist.

  4. 4

    Underground Plumbing / Sewer Lateral

    Underground plumbing and sewer lateral inspections; sewer lateral inspections require water testing.

  5. 5

    Four-Way (Framing, Rough Electrical, Rough Plumbing, Mechanical)

    Combined rough-in inspection of framing, electrical, plumbing, and mechanical systems, plus gas line.

  6. 6

    Insulation

    After insulation installed, before drywall.

  7. 7

    Drywall, Flashing, Lath

    Drywall, flashing, and lath inspections per Springville Residential Building Permit Checklist.

  8. 8

    Permanent Power / Drive Approach

    Permanent power connection and drive approach inspections.

  9. 9

    Final

    Final inspection for certificate of occupancy.

See the full Springville inspection guide — scheduling & re-inspection fees →

Tips

  • Springville requires Planning & Zoning and Storm Water pre-approval through My City Inspector BEFORE the Building Division will receive and review a residential building permit application — plan for this extra step.
  • The plan check fee and plan review deposit ($800-$1,100 typical for a single-family dwelling) are both due before review begins — contact the Building Division at (801) 489-2704 for the exact plan check amount.
  • A building permit expires 180 days (six months) after issuance or the last inspection; renewal after expiration costs half the original permit fee.
  • Only one re-inspection is included per required inspection — additional re-inspections cost $85 each (this rose from $65 between the July 2023 and 2026 editions of the Residential Building Permit Checklist).
  • Payments are by cash or check only, payable to Springville City, sent to 110 S Main, Springville, UT 84663, Attn: Building Dept. — or via e-check through My City Inspector's Xpress Bill Pay integration.
  • Springville's counter has a public kiosk for applicants without their own computer access; plans must be uploaded via flash drive — paper copies are not accepted.

Frequently asked questions

Springville requires a residential building permit for: New single-family residential construction; Additions or structural alterations to existing residential structures; Building designed to the 2021 IRC (International Residential Code) per Springville Residential Building Permit Checklist (July 2023); Planning & Zoning and Storm Water pre-approval through My City Inspector required before Building Division review begins; Payment of required fees before application and plans are reviewed. If your project isn't listed, confirm with Springville City Community Development — Building Division at (801) 489-2704 before starting work.

For a single-family dwelling, the plan review deposit typically ranges from $800 to $1,100 depending on building size, per Springville's Building FAQ. The exact deposit amount is provided within 2 business days of application submission once square-footage calculations are available.

Per Springville's Building FAQ, the initial plan review for a residential application takes place within 14 business days. If corrections are needed, the reviewer typically re-checks resubmittals within 3 business days of your response.

You'll need: Building Permit Application; Plat or Site Plan; Footing and Foundation Plan, Floor Plans, Elevations, Wall Cross Section; Plumbing, Mechanical, and Electrical Plans; Energy Analysis / Envelope Description; Manual D, J, and S Compliance; Soils Geotechnical Report. Depending on your project, Springville may also ask for: Engineering (if required); Owner/Builder Certification. See the required-documents checklist on this page for details on each.

Springville requires 9 inspection(s) for a residential building permit, in order: Footings, Foundation, Temporary Power / Power Trench, Underground Plumbing / Sewer Lateral, Four-Way (Framing, Rough Electrical, Rough Plumbing, Mechanical), Insulation, Drywall, Flashing, Lath, Permanent Power / Drive Approach, Final. Schedule each through Springville City Community Development — Building Division ((801) 489-2704).

Apply through Springville City Community Development — Building Division at 110 South Main Street, Springville, UT 84663 (Attn: Building Dept. for permit payments). Phone: (801) 489-2704, email: buildingpermits@springvilleutah.gov. Office hours: Building and Inspections Department: Monday–Friday, 8:00 a.m. to 5:00 p.m., closed all major holidays, per Springville Residential Building Permit Checklist (July 2023). NOTE: Springville's Building FAQ separately states building-division phone coverage (staffer 'Hollie') runs 8:00 a.m.–1:00 p.m. mornings only — the 8 AM–5 PM window is the department's official posted hours per the Permit Checklist, phone/counter availability may be more limited.. Official information: https://www.springvilleutah.gov/community-development/building-division/.

Springville, Utah has adopted: 2024 International Building Code (IBC) — Springville City Code § 10-1-101 adopts 'the International Building Code and the International Residential Code, as published by the International Code Council and adopted by the State of Utah, including all State statutes, amendments and regulations' as the City Building Code; the statewide edition CURRENT as of 7/1/2026 is the 2024 IBC per Utah Code § 15A-2-103(1)(a) (confirmed by direct fetch of the live statute 2026-07-16). The 2021 IBC governed through 6/30/2026. Springville § 10-1-101 last amended by Ordinance 16-2025 (effective 7/15/2025).; 2021 International Residential Code (IRC) — per Springville City Code § 10-1-101 (defers to state-adopted edition) and stated on Springville's own Residential Building Permit Checklist (July 2023) and Basement Improvement Permit Checklist (July 2023): 'Building shall be designed to the 2021 IRC (International Residential Code)' [and, for basements, 'and State Amendments']. Unchanged by the 7/1/2026 code cycle per Utah Code § 15A-2-103(1)(b).; 2024 International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), and International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC) — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(d)/(e)/(f)/(h)/(i) respectively, incorporated by reference via Springville City Code § 10-1-101's adoption of state-amended construction codes (confirmed by direct fetch of the live statute 2026-07-16). The 2021 editions of these five codes governed through 6/30/2026. The IECC is a single statewide edition — the statute contains no residential/commercial split. No Springville-specific edition citation for these individual codes was found beyond the statewide statute and Chapter 10-7 (Building and Construction Standards and Codes) cross-reference. The International Fire Code (IFC) is not adopted anywhere in Utah Code § 15A-2-103 and no Springville-specific IFC citation was found either.; 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g), the statewide-mandated edition that supersedes any locally-referenced older edition; UNCHANGED by the 7/1/2026 code cycle. NOTE: Springville's own 'Solar Permit Process' document (springvilleutah.gov, dated 2019) states 'System shall be designed to the 2015 IRC and 2017 NEC' — this document remains STALE relative to the current statewide statute; the 2023 NEC and 2021 IRC (both continuing unchanged past 7/1/2026) govern, per Utah Code § 15A-2-103, which supersedes outdated city documents.; The 2021 editions of IBC/IPC/IMC/IFGC/IECC/IEBC were superseded at the 7/1/2026 statewide transition; the entries above state the 2024 editions as current, with the superseded 2021 editions preserved as historical context. The IRC (2021) and NEC (2023) editions were not affected by that transition. No Springville-specific city page (beyond the 2019-dated, stale Solar Permit Process document) independently states individual code editions for IBC/IPC/IMC/IFGC/IECC/IEBC.. Local amendments apply — see the Springville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-08-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Springville's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Springville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Springville lands. Privacy.