Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-08-26.

Pleasant Grove building permits

Verified

Pleasant Grove, Utah — as published 2026-08-26.

Verified 2026-07-03 · Source

Codes adopted

GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Pleasant Grove's own Building Division page (pgcityutah.gov/departments/community_development/building.php) still displays the pre-7/1/2026 edition list; State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.2024 International Building Code (IBC), including Appendices C and J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Building Code (IBC)' (live re-check 2026-07-16).2021 International Residential Code (IRC) with Utah State Amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Pleasant Grove's own page, which lists '2021 International Residential Code w/ Utah State Amendments (IRC)' (live re-check 2026-07-16).2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Mechanical Code (IMC)' (live re-check 2026-07-16).2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Plumbing Code (IPC)' (live re-check 2026-07-16).2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip and has been state law since before this project's original 2026-07-04 review. Pleasant Grove's own Building Division page still lists '2020 National Electrical Code (NEC)' (live re-check 2026-07-16) — a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip, of the same kind separately documented for American Fork's Solar checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Energy Conservation Code w/ Utah State Amendments (IECC)' (live re-check 2026-07-16).2024 International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Existing Building Code (IEBC)' (live re-check 2026-07-16).Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Pleasant Grove's Building Division page lists '2021 International Swimming Pool and Spa Code (ISPSC)' without qualifying it to residential provisions (live re-check 2026-07-16).Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned anywhere on Pleasant Grove's Building Division page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Pleasant Grove's Building Division page does not list an IFC edition either, so there is no mis-citation to correct here.

Permit types & fees

Residential Building Permit (New Single Family)

Verified

Required for new single-family residential construction in Pleasant Grove, regulated by the state-adopted 2021 IRC (with Utah State Amendments). A submittal fee is charged at application and applied toward the total building permit cost.

Verified 2026-07-20 · Source

Requirements

  • New single-family residential construction
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • Gas line layout with pipe sizes called out
  • Heat loss analysis
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredElectronic Copy of Plans and EngineeringRequired for new residential and commercial construction per pgcityutah.gov Building Division page.
  • RequiredSite Plan (to scale)Required for new residential and commercial construction.
  • RequiredStructural Engineering Plan ReviewRequired for new residential and commercial construction.
  • RequiredGas Line Layout with Pipe SizesRequired for new residential and commercial construction.
  • RequiredHeat Loss AnalysisRequired for new residential and commercial construction.
  • RequiredSWPPP (Storm Water Pollution Prevention Plan)Required for new residential and commercial construction.
  • RequiredContractor License Number or Owner-Builder Certification FormOwner-Builder Certification Form available via Utah DOPL (dopl.utah.gov/contracting/additional-forms/).

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — New Single Family Residential$250.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php: 'New Single Family — $250.' Applied toward the total cost of the building permit; collected after the permit technician reviews the application.

Solar / Basement Finish / Addition / Pool / Plan Revision Permit

Verified

Covers solar PV installations, basement finishes, residential additions, pools, and plan revisions in Pleasant Grove — grouped under a single flat submittal fee category per the city's own published fee table.

Verified 2026-07-03 · Source

Requirements

  • Solar PV installation, basement finish, residential addition, pool installation, or a plan revision to an already-submitted project
  • Wall section (for structural scopes)
  • All rebar size, spacing and length (where applicable)
  • Site plan
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredSite PlanPer pgcityutah.gov Building Division document list for 'Most Other Types of Construction.'
  • OptionalWall SectionRequired where structural scope applies (e.g., pools, additions).
  • RequiredContractor License Number or Owner-Builder Certification FormOwner-Builder Certification Form available via Utah DOPL (dopl.utah.gov/contracting/additional-forms/).

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — Solar, Basements, Additions, Pools, Plan Revisions$75.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php: 'All Others (Solar, Signs, Basements) — $75' / 'Solar, Basements, Additions, Pools, Plan Revisions — $75.' Applied toward the total cost of the building permit.

Commercial Building Permit

Verified

Required for new commercial construction in Pleasant Grove, regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026). This entry is the counterpart of Pleasant Grove's 'New Commercial Shell Building Permit' entry (slug new-commercial-shell-permit) — the same real permit, with the same $500 submittal fee and the same underlying sourcing — listed under the standard commercial-building-permit name so lookups by that name resolve to real Pleasant Grove data. Source URLs are the same pgcityutah.gov pages cited there.

Verified 2026-07-19 · Source

Requirements

  • New commercial shell construction
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • Gas line layout with pipe sizes called out
  • Heat loss analysis
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredElectronic Copy of Plans and EngineeringRequired for new residential and commercial construction per pgcityutah.gov Building Division page.
  • RequiredSite Plan (to scale)Required for new commercial construction.
  • RequiredStructural Engineering Plan ReviewRequired for new commercial construction.
  • RequiredSWPPP (Storm Water Pollution Prevention Plan)Required for new commercial construction.

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — New Commercial$500.00
pgcityutah.gov/departments/community_development/fee_schedule.php and building.php: 'New Commercial — $500.' Applied toward the total cost of the building permit. Show full citation

pgcityutah.gov/departments/community_development/fee_schedule.php and building.php: 'New Commercial — $500.' Applied toward the total cost of the building permit. The fee_schedule.php table lists 'New Commercial $500' alongside 'New Single Family $250,' 'Commercial Remodel/Tenant Improvement $250,' and 'All Others (Solar, Signs, Basements) $75'.

Commercial Tenant Improvement / Tenant Finish Permit

Required for commercial remodel and tenant improvement work in Pleasant Grove. This entry covers the same permit as Pleasant Grove's 'Commercial Remodel / Tenant Improvement Permit' entry (slug commercial-remodel-tenant-improvement-permit) — the same real permit and the same $250 submittal fee — listed here under the standard slug (commercial-tenant-improvement-permit) so tenant-improvement lookups resolve consistently across jurisdictions. Both source pages on pgcityutah.gov carry the same figures.

Reviewed 2026-08-02 · Source

Requirements

  • Commercial remodel or tenant improvement scope
  • Electronic copy of plans and engineering, if applicable
  • Wall section
  • All rebar size, spacing and length
  • Site plan
  • Any other details pertaining to specific job

Required documents

  • OptionalElectronic Copy of Plans and Engineering (if applicable)Per pgcityutah.gov Building Division 'Most Other Types of Construction' document list.
  • RequiredWall SectionPer pgcityutah.gov Building Division document list.
  • RequiredRebar Size, Spacing and LengthPer pgcityutah.gov Building Division document list.
  • RequiredSite PlanPer pgcityutah.gov Building Division document list.

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — Commercial Remodel/Tenant Improvement$250.00 per fee_schedule.php, but $75.00 per building.php — the city's own two pages disagree
pgcityutah.gov/departments/community_development/fee_schedule.php lists "Commercial Remodel/ Tenant Improvement — $250," alongside "All Others (Solar, Signs, Basements) — $75." However,… Show full citation

pgcityutah.gov/departments/community_development/fee_schedule.php lists "Commercial Remodel/ Tenant Improvement — $250," alongside "All Others (Solar, Signs, Basements) — $75." However, pgcityutah.gov/departments/community_development/building.php's document-requirements table lists a parallel row ("New Single Family Residential | Solar, Basements, Additions, Pools, Plan Revisions | New Commercial Shell | Commercial Remodel/ Tenant Improvement") with values "$250 | $75 | $500 | $75" — i.e. $75, not $250, for this permit type. Both pages are live and genuinely show these conflicting figures: fee_schedule.php's 'Building Permit Submittal Fees' table reads New Single Family/New Commercial/Commercial Remodel-Tenant Improvement/All Others = $250/$500/$250/$75 in that column order, while building.php's table reads New Single Family Residential/Solar-Basements-Additions-Pools-Plan Revisions/New Commercial Shell/Commercial Remodel-Tenant Improvement = $250/$75/$500/$75 in that column order — i.e. $250 vs $75 for the identical 'Commercial Remodel/Tenant Improvement' line item on the city's own two pages. Neither page indicates when it was last updated, so recency cannot be used as a tiebreaker, and no authoritative source resolves which page is correct: (1) the city's comprehensive PLEASANT GROVE CITY FEE SCHEDULE - Adopted FY2026 (cms2.revize.com/revize/pleasantgroveut/Fee%20Schedule_FY2026_Adopted.pdf, 17 pages) has a 'Building Fees' section covering only Culinary/PI Meter Set fees and contains zero line items for New Single Family, New Commercial, Commercial Remodel/Tenant Improvement, or Building Permit Submittal Fees at all, so the master schedule cannot and does not resolve the conflict; (2) no dedicated Pleasant Grove ordinance or resolution establishing the Building Permit Submittal Fee table specifically has been located — the only two candidate documents (via utah.gov/pmn) are Ordinance 2025-09 (Pleasant Grove, but about R-R zone accessory-building setbacks, unrelated) and a River Heights, UT (a different city entirely) fee resolution, neither of which is the source of this table. This is a genuine, currently-live discrepancy in the city's own published data, not a transcription or caching artifact. Applicants should confirm the actual fee directly with Pleasant Grove's Building Division before relying on either figure; confidence stays 'partial' on this basis alone (all other fields in this entry are otherwise independently confirmed).

Sign Permit

Verified

Pleasant Grove regulates signs under City Code Title 10, Chapter 19 (Signs And Outdoor Advertising). The city's official Fee Schedule publishes a $100.00 Commercial Signage Review fee and a $20.00 Commercial Temporary Use Sign fee under its Land Use Fee Schedule, separate from the $75.00 'All Others (Solar, Signs, Basements)' Building Permit Submittal Fee that applies to non-commercial sign work bundled with solar and basement permits.

Verified 2026-07-20 · Source

Requirements

  • Commercial signage is reviewed and permitted separately from residential/other sign work, per the Land Use Fee Schedule's Commercial Signage Review line item
  • Temporary commercial-use signs are a distinct, lower-cost category from permanent commercial signage

Required documents

  • RequiredSign Permit / Commercial Signage Review ApplicationSubmitted to the Pleasant Grove Community Development Department for review under City Code Title 10, Chapter 19.

Fee schedule

Fee typeAmountNotes
Commercial Signage Review$100.00Pleasant Grove City Fee Schedule, Land Use Fee Schedule, 'Other' section: 'Commercial Signage Review $100.'
Commercial Temporary Use Sign$20.00Pleasant Grove City Fee Schedule, Land Use Fee Schedule, 'Other' section: 'Commercial Temporary Use Sign $20.'
Building Permit Submittal Fee — All Others (Solar, Signs, Basements)$75.00Pleasant Grove City Fee Schedule, Building Permit Submittal Fees: signs are grouped with solar and basement-finish work under the 'All Others' $75 submittal fee category (applied toward the cost of the building permit), distinct from the separate Commercial Signage Review fee.

Fire Sprinkler & Fire Alarm Permit

Verified

Pleasant Grove Fire Department, led by City Fire Marshal Battalion Chief Jake Larsen, enforces the fire code and reviews fire protection system plans for new construction. The city does not perform fire sprinkler and alarm plan review in house: submit plans to one of the city's approved third-party fire engineering reviewers for review and stamping, then route them to the Fire Marshal's office for final approval. Budget the third-party review fee and its lead time separately.

Verified 2026-07-20 · Source

Requirements

  • Fire sprinkler system plans for new commercial construction
  • Fire alarm system plans for new commercial construction
  • Underground fire protection piping
  • Fire pump installation

Required documents

  • RequiredFire Sprinkler/Alarm PlansSubmitted directly to one of the city's approved 3rd-party fire engineering reviewers (not the city) for review and stamping; once approved, forwarded to the Fire Marshal's office for final sign-off

Fee schedule

Fee typeAmountNotes
City Fire Department Plan Review FeeNo city fee publishedPleasant Grove Fire Department does not conduct its own plan review — fire sprinkler and alarm plans go to an approved 3rd-party fire engineering company. Third-party review fees are set by each private firm and are not published by the city.
Fire Inspection FeeNo costPer the Pleasant Grove Fire Inspections FAQ page: "Is there any cost associated with a fire inspection? There is no cost for inspections."

Certificate of Occupancy and Zoning Compliance

Pleasant Grove City Code Section 10-1-9 makes it a distinct, standalone legal requirement -- separate from new construction -- that no residence, building, or premises be used or occupied with a greater intensity of use or different occupancy than provided for in its certificate of occupancy and zoning compliance. A new certificate is required not only at completion of new construction, but also whenever a building's occupancy or use changes, or when alterations exceeding 20,000 dollars in cost are made. In practice, a change of use in an existing building (for example, a new business occupying a space with a different use than the prior tenant) is verified through the City's Commercial Business License process, which requires Zoning Verification and a Fire Self-Inspection before a license -- and therefore lawful occupancy -- is granted. Separately, Pleasant Grove City Code Chapter 9-4 (Occupancy Permit; Fee Schedule) confirms a real, currently-codified Occupancy Fee collected by the Building Official as a condition prior to CO issuance, distinct from the Business License route -- but its dollar amount is set by an unpublished exhibit on file at the city office, not a public document.

Reviewed 2026-07-20 · Source

Requirements

  • Any change in occupancy, use, or 'intensity of use' of an existing residence, building, or premises, per Pleasant Grove City Code Section 10-1-9(A) -- occupying with 'a greater intensity of use or different occupancy than provided for specifically in the certificate of occupancy and zoning compliance' is unlawful
  • A new certificate of occupancy and zoning compliance is also required when substantial modifications or alterations exceeding 20,000 dollars in cost are made to a residence, building, or premises, per Section 10-1-9(B)
  • For a new commercial occupant/use in an existing building, a Commercial Business License Application, with Zoning Verification recommended from the Community Development Planning Department before submittal
  • A completed Fire Department Self-Inspection Report, with photos, submitted with the business license application; the Fire Battalion Chief may require a follow-up on-site inspection
  • Signed certification from the property owner (or authorized agent) that the information provided is accurate and that stated conditions will be maintained on the premises, per Section 10-1-9(C)

Required documents

  • RequiredCommercial Business License ApplicationOfficial Pleasant Grove Community Development / Business Licensing form; the practical vehicle through which a change of use / new occupant in an existing commercial building is reviewed for zoning, building, and fire compliance ahead of lawful occupancy.
  • RequiredBusiness License Application RequirementsCover sheet explaining fees, why the City licenses businesses (proper zoning, fire safety code compliance, code adherence), and required attachments; recommends Zoning Verification from the Planning Department before submittal (801-785-6057).
  • RequiredFire Department Self-Inspection ReportRequired for both home and commercial license applicants; must be submitted with photos. The Fire Battalion Chief may order a subsequent on-site inspection based on the self-inspection submission.

Fee schedule

Fee typeAmountNotes
Occupancy Fee (Pleasant Grove City Code chapter 9-4, Occupancy Permit; Fee Schedule)Set by Exhibit A to Ordinance 98-26 -- specific dollar figure not published online
Pleasant Grove City Code Title 9, Chapter 4 is titled OCCUPANCY PERMIT; Show full citation

Pleasant Grove City Code Title 9, Chapter 4 is titled OCCUPANCY PERMIT; FEE SCHEDULE (codelibrary.amlegal.com/codes/pleasantgroveut/latest/pleasantgrove_ut/0-0-0-21700). Section 9-4-3, Occupancy Fee Imposed, states verbatim: "A fee is hereby imposed which shall apply to new development of those real properties located within the city which require the issuance of an occupancy permit... Said fee shall be in the amounts as set forth in exhibit A, which is attached to ordinance 98-26 and made part of this chapter by reference. The exhibit is on file in the city office." Section 9-4-5 confirms: "The building official shall be charged with the collection of the occupancy fee, which shall be collected as a condition prior to the issuance of a certificate of occupancy... in addition to any other fees, charges or assessments due." This is a real, currently-codified, distinct CO-specific fee (separate from the Business License fee route documented below) — but the dollar amount is set by an exhibit that the ordinance's own text describes as being kept on file at the city office rather than published, and it was never posted online even at adoption in 1998. It is absent from every current published Pleasant Grove fee document: the Community Development fee_schedule.php page; the citywide Finance Department 2022 Fee Schedule PDF (pgcityutah.gov/Documents/Departments/Finance/Other%20Financial%20Reports/2022_fee_schedule_08022022.pdf); and the Pleasant Grove CITY FEE SCHEDULE - Adopted FY2026 Fee, Effective July 1, 2025 (cms2.revize.com/revize/pleasantgroveut/Fee%20Schedule_FY2026_Adopted.pdf) — the city's current comprehensive consolidated fee schedule covering Community Development, Business Licensing, Cemetery, Recreation Center, Swimming Pool, Fire, Library, Police, Public Works, and Utilities in one document with both Current and Adopted FY2026 columns. That FY2026 schedule confirms the $75 Commercial/Industrial/Manufacturing business license fee and the $20/hour Zoning Verification Letter fee, but contains NO Occupancy Fee, Certificate of Occupancy fee, or Chapter 9-4 line item anywhere in its 17 pages. City Council agenda packets (cms2.revize.com/revize/pleasantgroveut/Documents/Government/City%20Council/Agendas%20and%20Minutes/) and the Utah Public Notice site record no resolution amending or re-publishing Ordinance 98-26 Exhibit A — the exhibit appears never to have been re-adopted or re-published since 1998. With three independent current fee documents (the Community Development page, the 2022 Finance PDF, and the FY2026 master fee schedule) all lacking this fee, the Chapter 9-4 Occupancy Fee dollar amount genuinely is not published anywhere online — it exists only in a physical exhibit on file at the city office. Contact the Building Official/Community Development Department (801-785-5045) directly for the current Exhibit A dollar amount before budgeting.

Commercial/Industrial/Manufacturing Business License Fee75.00 dollars
Pleasant Grove City Fee Schedule, Business Licensing Fee Schedule section (pgcityutah.gov/departments/community_development/fee_schedule.php), live-read 2026-07-20:… Show full citation

Pleasant Grove City Fee Schedule, Business Licensing Fee Schedule section (pgcityutah.gov/departments/community_development/fee_schedule.php), live-read 2026-07-20: 'Commercial/Industrial/Manufacturing $75.' Also independently confirmed at 75.00 dollars in the Business License Application Requirements PDF ('*COMMERCIAL LICENSE FEE: $75.00'). This is the fee tied to the license that verifies lawful occupancy/use under Section 10-1-9, not a fee explicitly labeled 'certificate of occupancy' -- Pleasant Grove does not publish a separately-priced change-of-use or CO-only fee line.

Zoning Verification Letter20.00 dollars per hour
Pleasant Grove City Fee Schedule, Land Use Fee Schedule section, live-read 2026-07-20: 'Zoning Verification Letter $20/hour.' The Business License Application Requirements PDF recommends obtaining… Show full citation

Pleasant Grove City Fee Schedule, Land Use Fee Schedule section, live-read 2026-07-20: 'Zoning Verification Letter $20/hour.' The Business License Application Requirements PDF recommends obtaining Zoning Verification before submitting a commercial license application -- this is the step that confirms a new use is permitted in its zone ahead of a change-of-use occupancy.

Change of Location/Transfer Fee (existing business license, new location)25.00 dollars
Pleasant Grove City Fee Schedule, Business Licensing Fee Schedule section, live-read 2026-07-20: 'Change of Location/Transfer Fee $25.' Applies when an already-licensed business changes location, not… Show full citation

Pleasant Grove City Fee Schedule, Business Licensing Fee Schedule section, live-read 2026-07-20: 'Change of Location/Transfer Fee $25.' Applies when an already-licensed business changes location, not to a new occupant/use generally -- included here for completeness since it is the closest explicitly-named 'change' fee line in the schedule.

EV Charger / EVSE Permit

Pleasant Grove has no distinct EV charger or EVSE permit type, fee line item, or dedicated Electrical Permit category. The city's published Building Permit Submittal Fees table (pgcityutah.gov/departments/community_development/fee_schedule.php) groups all construction not otherwise itemized — new single-family, new commercial, commercial remodel and tenant improvement — into an 'All Others (Solar, Signs, Basements)' / 'Solar, Basements, Additions, Pools, Plan Revisions' flat $75 submittal-fee category, the same catch-all bucket that covers Pleasant Grove's solar, basement, addition, pool and remodel permits. No source explicitly names EV chargers as belonging to that bucket, so this entry is marked partial confidence rather than assuming the analogy holds.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Pleasant Grove
  • New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
  • Site Plan (per pgcityutah.gov Building Division document list for 'Most Other Types of Construction')
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredBuilding Permit ApplicationSubmitted to Pleasant Grove's Community Development / Building Division.
  • RequiredContractor License Number or Owner-Builder Certification FormOwner-Builder Certification Form available via Utah DOPL (dopl.utah.gov/contracting/additional-forms/).

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — likely 'All Others' catch-all category (unconfirmed for EV specifically)$75.00 (by analogy to the 'All Others' / 'Solar, Basements, Additions, Pools, Plan Revisions' catch-all bucket)
pgcityutah.gov/departments/community_development/fee_schedule.php: 'All Others (Solar, Signs, Basements) — $75' and a related listing 'Solar, Basements, Additions, Pools, Plan Revisions — $75.'… Show full citation

pgcityutah.gov/departments/community_development/fee_schedule.php: 'All Others (Solar, Signs, Basements) — $75' and a related listing 'Solar, Basements, Additions, Pools, Plan Revisions — $75.' Neither version of this catch-all category explicitly names EV chargers or electrical work; this figure is included as the most plausible applicable bucket given Pleasant Grove publishes no dedicated Electrical Permit fee, but it is NOT independently confirmed for EV-specific work — confirm with the Community Development Department (801-785-5045) before relying on it.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-02)View current record →All versions →

Permalink: /utah/utah-county/pleasant-grove/as-of/2026-08-26/

Snapshot date: 2026-08-26

Commit: 4e9b2b0

Reproducible from PermitBase’s version-controlled dataset, commit 4e9b2b0.