This is PermitBase’s published record for Provo as of 2026-06-27. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Provo building permits
Provo, Utah — as published 2026-06-27.
Reviewed 2026-06-27 · Source
Codes adopted
Permit types & fees
Residential Building Permit
Required for new residential construction, additions, and structural alterations in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- RequiredBuilding PlansComplete construction drawings to scale (floor plans, elevations, sections, structural details). Most Utah jurisdictions now require a single PDF set uploaded through their online permit portal.
- RequiredSite PlanProperty survey showing setbacks and building footprint
- RequiredEnergy ComplianceREScheck or equivalent energy calculation
- RequiredEngineered Truss PlansSealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (1997 UBC valuation table) | $23.50 (up to $500); $23.50 + $3.05/each $100 over $500 (to $2,000); $69.25 + $14/each $1,000 over $2,000 (to $25,000); $391.75 + $10.10/each $1,000 over $25,000 (to $50,000); $643.75 + $7/each $1,000 over $50,000 (to $100,000); $993.75 + $5.60/each $1,000 over $100,000 (to $500,000); $3,233.75 + $4.75/each $1,000 over $500,000 (to $1,000,000); $5,608.75 + $3.65/each $1,000 over $1,000,000 | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of building permit fee | — |
| Note | For residential structures with 4 or fewer units, the building permit fee includes plumbing, electrical, and mechanical permit fees | — |
Accessory Dwelling Unit (ADU) Permit
Required for construction of accessory dwelling units (basement apartments, detached ADUs) in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Property must be zoned for ADU use
- Owner-occupancy requirement for primary or accessory unit
- ADU must meet building code and fire separation requirements
- Off-street parking must be provided
Required documents
- RequiredBuilding PlansComplete construction drawings showing unit layout, egress, and fire separation
- RequiredSite PlanProperty survey showing ADU location, setbacks, and parking
- RequiredOwner AffidavitSigned affidavit confirming owner-occupancy requirement
- RequiredEnergy ComplianceREScheck or equivalent energy calculation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | Valuation-based per 1997 UBC table (includes MEP for residential ≤4 units) | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of permit fee | — |
Electrical Permit
Required for electrical work including panel upgrades, new circuits, rewiring, and service changes in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New electrical circuits or wiring
- Electrical panel upgrades or replacements
- Service entrance changes (100A to 200A, etc.)
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredElectrical PlanSingle-line diagram showing panel schedule and circuit layout
- RequiredLoad CalculationNEC Article 220 load calculation for service upgrades
- RequiredContractor LicenseValid Utah electrical contractor license (DOPL)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit | Included in building permit fee for residential structures with 4 or fewer units; otherwise valuation-based per 1997 UBC table | — |
| State Fee | 1% of permit fee | — |
Plumbing Permit
Required for plumbing installations, alterations, and repairs including water heaters, re-pipes, and fixture additions in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New plumbing fixtures (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredPlumbing PlanIsometric drawing showing fixture locations, pipe sizes, and drainage
- RequiredContractor LicenseValid Utah plumbing contractor license (DOPL)
- OptionalWater Heater SpecsManufacturer specs for water heater installations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit | Included in building permit fee for residential structures with 4 or fewer units; otherwise valuation-based per 1997 UBC table | — |
| State Fee | 1% of permit fee | — |
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation
Required documents
- RequiredMechanical PlanEquipment location, duct layout, and sizing calculations
- RequiredManual J Load CalculationHeating/cooling load calculation for new systems
- RequiredContractor LicenseValid Utah HVAC contractor license (DOPL)
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit | Included in building permit fee for residential structures with 4 or fewer units; otherwise valuation-based per 1997 UBC table | — |
| State Fee | 1% of permit fee | — |
Roofing Permit
Required for roof replacement, re-roofing, and structural roof repairs in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where allowed)
- Structural roof repairs or modifications
- Changes to roofing material type
Required documents
- RequiredRoofing ApplicationScope of work, square footage, and material specifications
- RequiredContractor LicenseValid Utah roofing contractor license (DOPL)
- OptionalManufacturer SpecsProduct data for roofing material and underlayment
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roofing Permit | Valuation-based per 1997 UBC table | — |
| State Fee | 1% of permit fee | — |
Fence Permit
Required for new fence installation or replacement in Provo. Height restrictions apply by zone.
Reviewed 2026-06-27 · Source
Requirements
- Any new fence construction
- Replacement of existing fence in different location or height
- Fence over 6 feet in any zone
Required documents
- RequiredSite PlanShowing fence location relative to property lines and easements
- RequiredFence DetailsHeight, material, and style specifications
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | $25-$50 flat fee | — |
Deck Permit
Required for new deck construction, replacement, or structural modifications to existing decks in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New deck construction over 200 square feet
- Decks more than 30 inches above grade
- Attached decks (ledger board connection to house)
- Structural modifications to existing decks
Required documents
- RequiredDeck PlansFraming plan with beam/joist sizes, post locations, and footing details
- RequiredSite PlanShowing deck location with setbacks from property lines
- RequiredLedger DetailConnection detail for attached decks per IRC R507.2
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck Permit | Valuation-based per 1997 UBC table | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of permit fee | — |
Swimming Pool Permit
Required for in-ground and above-ground swimming pool installation, hot tubs over a certain size, and associated barriers in Provo.
Reviewed 2026-06-27 · Source
Requirements
- In-ground swimming pool construction
- Above-ground pools with a depth over 24 inches
- Hot tubs and spas over 5,000 gallons
- Pool barrier/fence installation (required for all pools)
Required documents
- RequiredPool PlansPool dimensions, depth, equipment location, and structural details
- RequiredSite PlanPool location with setbacks, equipment pad, and barrier/fence layout
- RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
- RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Pool Permit | $150-$400 based on valuation | — |
| Electrical Sub-Permit | $40-$75 | — |
| Plan Review | 65% of permit fee | — |
Demolition Permit
Required for partial or complete demolition of structures in Provo, including utility disconnection and debris disposal.
Reviewed 2026-06-27 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Removal of load-bearing walls
- Demolition of structures with asbestos or lead paint
Required documents
- RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan
- RequiredAsbestos SurveyNESHAP asbestos inspection for structures built before 1985
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected
- OptionalSite PlanShowing structure to be demolished, adjacent structures, and access
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | Valuation-based per 1997 UBC table | — |
| State Fee | 1% of permit fee | — |
Solar Panel Permit
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation (Powerwall, etc.)
- Electrical service upgrade for solar interconnection
Required documents
- RequiredSolar Site PlanRoof plan or ground layout showing panel placement, setbacks, and access pathways
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
- RequiredStructural AnalysisRoof load calculation confirming structure can support panels
- RequiredEquipment SpecsData sheets for panels, inverter, and racking system
- RequiredInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Permit | Valuation-based per 1997 UBC table | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of permit fee | — |
Home Occupation Permit
Required to operate a business from a residential property in Provo. Ensures the business use is compatible with the residential neighborhood.
Reviewed 2026-06-27 · Source
Requirements
- Business operated from primary residence
- No external signage or evidence of business use
- No employees working on-site (in most zones)
- No customer traffic beyond normal residential levels
- Business activity does not create noise, odor, or hazards
Required documents
- RequiredHome Occupation ApplicationBusiness description, hours of operation, and nature of activities
- RequiredState Business LicenseUtah Division of Corporations business registration
- OptionalSite PlanArea of home used for business, parking, and storage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Home Occupation Permit | $25-$75 annual fee | — |
| Business License | $25-$100 annual (separate from permit) | — |
Driveway & Concrete Flatwork Permit
Required for new driveways, driveway replacements, sidewalk modifications, and concrete flatwork that connects to public right-of-way in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New driveway construction or widening
- Driveway approach (curb cut) modification
- Sidewalk replacement or modification in public right-of-way
- Concrete patio or flatwork over 200 square feet adjacent to right-of-way
Required documents
- RequiredSite PlanShowing driveway location, dimensions, and connection to street
- RequiredRight-of-Way PermitRequired if work occurs in public right-of-way (sidewalk, curb)
- OptionalDrainage PlanShowing surface drainage and preventing runoff onto adjacent properties
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Driveway Permit | $50-$100 flat fee | — |
| Right-of-Way Bond | $500-$2,000 refundable bond (if working in ROW) | — |
Retaining Wall Permit
Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Retaining walls over 4 feet in total height
- Any retaining wall supporting a surcharge (driveway, structure, slope above)
- Retaining walls in a drainage or flood path
- Tiered walls where total retained height exceeds 4 feet
Required documents
- RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE
- RequiredGeotechnical ReportSoil bearing capacity and lateral pressure analysis
- RequiredSite PlanWall location relative to property lines, structures, and utilities
- RequiredDrainage PlanBehind-wall drainage, weep holes, and surface water management
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $100-$300 based on wall length and height | — |
| Plan Review | 65% of permit fee | — |
Basement Finish Permit
Required for finishing or remodeling an unfinished basement in Provo, including framing, electrical, plumbing, and mechanical work.
Reviewed 2026-06-27 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom (requires plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
- RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
- RequiredMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room
- OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | Valuation-based per 1997 UBC table (includes MEP for residential ≤4 units) | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of permit fee | — |
Grading & Excavation Permit
Required for significant grading, excavation, or land disturbance on residential or commercial properties in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Grading or filling that changes drainage patterns
- Excavation deeper than 4 feet
- Land disturbance over 1 acre (stormwater permit also required)
- Cut or fill exceeding 50 cubic yards
- Hillside grading in sensitive slope areas
Required documents
- RequiredGrading PlanExisting and proposed contours, cut/fill volumes, and drainage
- RequiredSoils/Geotechnical ReportRequired for hillside lots or fills over 3 feet
- RequiredErosion Control PlanSWPPP or erosion control measures during construction
- OptionalStormwater PermitState UPDES permit for disturbance over 1 acre
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Grading Permit | $100-$500 based on volume of earth moved | — |
| Plan Review | 65% of permit fee | — |
| Erosion Control Bond | $500-$5,000 refundable bond | — |
Sign Permit
Required for installation of commercial, directional, and certain temporary signs in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Permanent commercial signage (wall-mounted, monument, pole)
- Illuminated or electronic message signs
- Temporary signs and banners (over size/time limits)
- Directional and wayfinding signs on commercial property
Required documents
- RequiredSign ApplicationSign dimensions, height, illumination, and materials
- RequiredSite PlanSign location on property, setbacks, and visibility triangles
- RequiredElectrical PlanRequired for illuminated signs — circuit, disconnect, and GFCI details
- OptionalStructural DetailsRequired for pole and monument signs — footing and attachment details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit | $50-$200 per sign | — |
| Electrical Sub-Permit | $40-$75 for illuminated signs | — |
Shed & Accessory Structure Permit
Required for detached garages, sheds, carports, and other accessory structures over 200 square feet in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Detached structures over 200 square feet
- Detached garages and carports
- Accessory structures with electrical or plumbing
- Structures over 10 feet in height
Required documents
- RequiredBuilding PlansFloor plan, elevations, and structural details
- RequiredSite PlanStructure location showing setbacks from property lines and other buildings
- RequiredFoundation DetailsSlab, pier, or post foundation design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | Valuation-based per 1997 UBC table | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of permit fee | — |
Water Heater Permit
Required for water heater installation, replacement, or conversion (tank to tankless) in Provo. A specific subset of the plumbing permit for this common project.
Reviewed 2026-06-27 · Source
Requirements
- Water heater replacement (even like-for-like)
- New water heater installation
- Conversion from tank to tankless
- Gas line modification for water heater
Required documents
- RequiredPermit ApplicationWater heater type, size, fuel source, and location
- OptionalEquipment SpecsManufacturer data sheet for the water heater
- RequiredContractor LicenseValid Utah plumbing contractor license (DOPL) if not owner-occupied
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater Permit | $40-$60 flat fee | — |
Fire Sprinkler & Alarm Permit
Required for installation or modification of fire sprinkler systems and fire alarm systems in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New fire sprinkler system installation
- Modification or extension of existing sprinkler systems
- Fire alarm system installation or upgrade
- New construction requiring NFPA 13D residential sprinklers
Required documents
- RequiredSprinkler PlansHydraulic calculations, pipe layout, and head placement per NFPA 13D
- RequiredAlarm PlansDevice locations, wiring diagram, and monitoring details
- RequiredContractor LicenseUtah fire protection contractor license
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler Permit | $100-$300 based on system size | — |
| Fire Alarm Permit | $75-$150 | — |
| Plan Review | 65% of permit fee | — |
Window & Door Replacement Permit
Required for window and door replacements that involve structural changes, resizing openings, or egress modifications in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Enlarging or reducing a window or door opening
- Replacing a window or door with a different size (structural header change)
- Adding a new window or door opening
- Converting a window to a door or vice versa
- Egress window installation for bedrooms
Required documents
- RequiredScope of WorkDescription of existing and proposed openings, sizes, and locations
- RequiredStructural DetailsHeader sizing and framing details for new or enlarged openings
- RequiredEnergy ComplianceWindow U-factor and SHGC ratings meeting Utah energy code
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $50-$150 based on number of openings | — |
| Plan Review | 50% of permit fee | — |
Siding & Exterior Cladding Permit
Required for re-siding a home or changing exterior cladding material in Provo. Like-for-like repairs may be exempt.
Reviewed 2026-06-27 · Source
Requirements
- Complete re-siding of a structure
- Changing siding material type (e.g., vinyl to fiber cement)
- Adding or modifying exterior insulation (continuous insulation)
- Stucco or stone veneer installation
Required documents
- RequiredScope of WorkExisting and proposed materials, area, and any sheathing changes
- RequiredProduct SpecificationsManufacturer installation instructions and fire ratings
- OptionalWeather Barrier DetailsHouse wrap or weather-resistive barrier plan
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Siding Permit | $50-$150 flat fee | — |
Patio Cover & Pergola Permit
Required for attached or detached patio covers, pergolas, gazebos, and similar shade structures in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Attached patio covers (connected to the house)
- Detached patio covers and pavilions over 200 sq ft
- Pergolas with solid roof panels
- Screened-in porches and three-season rooms
- Gazebos over 200 sq ft
Required documents
- RequiredBuilding PlansStructural details — post sizes, beam spans, rafter spacing, and attachment
- RequiredSite PlanStructure location showing setbacks from property lines
- RequiredFooting DetailsPost footing size and depth (below frost line)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $75-$250 based on square footage | — |
| Plan Review | 50-65% of permit fee | — |
Hot Tub & Spa Permit
Required for hot tub and spa installations in Provo, covering electrical connections, structural support, and barrier requirements.
Reviewed 2026-06-27 · Source
Requirements
- Hot tub or spa installation (portable or built-in)
- Electrical circuit for hot tub (typically 240V/50A dedicated)
- Structural deck or pad to support the weight
- Barrier requirements if accessible to children under 5
Required documents
- RequiredElectrical PlanDedicated 240V circuit, GFCI protection, disconnect location
- RequiredSite PlanHot tub location, setbacks, and access for maintenance
- RequiredStructural SupportDeck or pad load capacity — hot tubs weigh 3,000-6,000 lbs filled
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit | $40-$75 | — |
| Building Permit | $50-$100 (if structural work needed) | — |
Garage Conversion Permit
Required for converting an attached or detached garage into living space, office, or other habitable use in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Converting garage to living space, bedroom, or home office
- Removing or modifying garage door opening
- Adding insulation, drywall, and finished flooring
- Adding HVAC, electrical circuits, or plumbing to garage space
Required documents
- RequiredConversion PlansFloor plan showing proposed layout, egress, and mechanical systems
- RequiredEnergy ComplianceInsulation, window, and HVAC calculations for habitable space
- RequiredSite PlanShowing remaining parking spaces meet {city} zoning requirements
- RequiredStructural DetailsGarage door infill framing and any floor modifications
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $200-$500 based on scope | — |
| Plan Review | 65% of permit fee | — |
| Trade Permits | Electrical, plumbing, mechanical as applicable | — |
Gas Line Permit
Required for installation, modification, or extension of natural gas or propane piping in Provo.
Reviewed 2026-06-27 · Source
Requirements
- New gas line installation to an appliance
- Extending existing gas piping
- Gas line relocation or rerouting
- Adding a gas stub for future appliance (BBQ, fire pit, etc.)
- Propane system installation
Required documents
- RequiredGas Piping PlanPipe routing, sizing based on BTU load, and material specifications
- RequiredBTU Load CalculationTotal connected load for all gas appliances to verify meter and pipe capacity
- RequiredContractor LicenseValid Utah plumbing or gas contractor license (DOPL)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Gas Line Permit | $40-$75 flat fee | — |
| Per Outlet | $5-$10 per gas outlet | — |
Fireplace & Wood Stove Permit
Required for installation of gas fireplaces, wood-burning stoves, pellet stoves, and fireplace inserts in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Gas fireplace or insert installation
- Wood-burning stove or fireplace insert installation
- Pellet stove installation
- New chimney or flue construction
- Modifications to existing fireplace or chimney
Required documents
- RequiredEquipment SpecificationsManufacturer listing, clearances to combustibles, and installation instructions
- RequiredInstallation PlanLocation, venting/chimney route, and combustion air supply
- RequiredGas Line PlanFor gas fireplaces — gas piping route and BTU rating
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit | $50-$100 | — |
| Gas Permit | $40-$75 (if gas fireplace) | — |
Tree Removal Permit
Required for removal of significant trees or trees in public right-of-way in Provo. Regulations vary by zone and tree size.
Reviewed 2026-06-27 · Source
Requirements
- Removal of trees over a certain caliper (typically 6+ inches DBH)
- Removal of trees in public right-of-way or park strips
- Tree removal required for construction or development
- Hazardous or dead tree removal (may be expedited)
Required documents
- RequiredTree Removal ApplicationSpecies, size, location, and reason for removal
- RequiredSite PlanTree location on property, proximity to structures and utilities
- OptionalArborist ReportRequired for significant trees — health assessment and alternatives to removal
- OptionalReplacement PlanProposed replacement tree species, size, and location (if required)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Tree Removal Permit | $0-$75 (varies by city — some are free) | — |
| Replacement Tree Deposit | $100-$300 per tree if replacement required | — |
EV Charger Installation Permit
Required for installation of Level 2 (240V) and Level 3 electric vehicle charging stations at residential and commercial properties in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Level 2 (240V) EV charger installation
- Dedicated circuit from electrical panel to charging location
- Electrical panel upgrade if insufficient capacity
- Commercial EV charging station installation
Required documents
- RequiredElectrical PlanCircuit routing from panel to charger, wire sizing, and breaker amperage
- RequiredLoad CalculationPanel capacity analysis showing sufficient amperage for EV charger
- RequiredEquipment SpecificationsCharger model, amperage rating, and UL listing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit | $40-$75 | — |
| Panel Upgrade | $75-$150 additional if panel upgrade needed | — |
Commercial Tenant Improvement (TI) Permit
Required for interior build-outs, renovations, and modifications to commercial, retail, and office spaces in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Interior build-out of new commercial space
- Renovation of existing commercial or retail space
- Office remodel involving walls, electrical, or mechanical
- Restaurant or food service build-out (additional health dept. requirements)
- ADA compliance upgrades
Required documents
- RequiredConstruction PlansFloor plan, reflected ceiling plan, and interior elevations
- RequiredMEP PlansMechanical, electrical, and plumbing layouts for the tenant space
- RequiredADA Compliance PlanAccessibility analysis showing restrooms, entrances, and path of travel
- RequiredFire/Life Safety PlanExit paths, occupancy load, fire sprinkler modifications, and alarm zones
- OptionalHealth Department ApprovalRequired for food service, salon, or health-related businesses
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (1997 UBC valuation table) | $23.50 (up to $500); $23.50 + $3.05/each $100 over $500 (to $2,000); $69.25 + $14/each $1,000 over $2,000 (to $25,000); $391.75 + $10.10/each $1,000 over $25,000 (to $50,000); $643.75 + $7/each $1,000 over $50,000 (to $100,000); $993.75 + $5.60/each $1,000 over $100,000 (to $500,000); $3,233.75 + $4.75/each $1,000 over $500,000 (to $1,000,000); $5,608.75 + $3.65/each $1,000 over $1,000,000 | — |
| Plan Check | 65% of building permit fee | — |
| State Fee | 1% of building permit fee | — |
Change of Occupancy / Use Permit
Required when changing the use or occupancy classification of a building or space in Provo (e.g., retail to restaurant, office to daycare).
Reviewed 2026-06-27 · Source
Requirements
- Changing building use (e.g., retail to restaurant, warehouse to office)
- Changing occupancy group classification per IBC
- Increasing occupant load of existing space
- Converting residential to commercial or vice versa
Required documents
- RequiredChange of Use ApplicationCurrent and proposed use, occupancy group, and occupant load
- RequiredCode AnalysisComparison of current building features vs. requirements for new occupancy
- RequiredFire/Life Safety UpgradesRequired upgrades for sprinklers, alarms, exits, and fire ratings
- RequiredADA AssessmentAccessibility compliance for the new use
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change of Occupancy Review | $100-$500 based on complexity | — |
| Building Permit | Additional if construction required for compliance | — |
| Fire Review | Separate fire department fee | — |
Temporary Structure & Event Permit
Required for temporary tents, stages, bleachers, and structures used for events or construction in Provo.
Reviewed 2026-06-27 · Source
Requirements
- Tents or canopies over 400 sq ft
- Temporary stages or platforms
- Bleachers or grandstands
- Construction trailers and temporary offices
- Seasonal sales structures (fireworks stands, Christmas tree lots)
Required documents
- RequiredTemporary Structure ApplicationStructure type, size, duration, and location
- RequiredSite PlanStructure placement, exits, fire lanes, and parking
- RequiredFire Safety PlanFire extinguishers, exit signage, and flame-retardant certification for tents
- OptionalEvent PermitRequired for public events — separate from structure permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Structure Permit | $50-$200 | — |
| Event Permit | $50-$300 (separate, if public event) | — |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.