Provo building permits

Verified

Provo, Utah — as published 2026-07-16.

Verified 2026-06-29 · Source

Codes adopted

2024 International Building Code (IBC) — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); Provo's own Building FAQ still lists 2021 IBC as of 2026-07-16 — see NOTE below.2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)).2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)).2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)).2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)).2021 International Fire Code (IFC) — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88) listing codes adopted as of July 1, 2021 (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period beyond this FAQ citation).2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); superseding the 2021 IECC (commercial and residential editions) that Provo's Building FAQ had cited and that was in effect through June 30, 2026.2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)).2023 National Electrical Code (NEC) — currently in effect (Utah Code § 15A-2-103(1)(g)); unchanged by the July 1, 2026 statewide code-edition update. NOTE: Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88) still listed 'National Electric Code 2020 Edition' as of 2026-07-16 (re-confirmed live) — this is STALE and always has been, independent of the 7/1/2026 transition; the statewide statute mandates the 2023 NEC, which supersedes the city FAQ.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)).NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88), re-fetched live 2026-07-16, still lists every code at its pre-transition July 1, 2021 edition (2021 IBC/IMC/IPC/IFGC/IRC/IFC, 2021 commercial and residential IECC, plus the already-stale 2020 NEC) — the city FAQ has not been updated to reflect either the 2023 NEC statewide mandate or the 7/1/2026 edition change; the state statute governs regardless.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and any work regulated by the adopted 2021 IRC or 2024 IBC. The permit covers plumbing, electrical, and mechanical (MEP) for residential structures with four or fewer dwelling units — no separate MEP permits are required for those projects.

Verified 2026-06-29 · Source

Requirements

  • New single-family or multi-family residential construction (up to 4 units)
  • Additions or enlargements to existing residential structures
  • Structural modifications — load-bearing wall removal, foundation alterations, beam additions
  • Conversion of non-habitable space to habitable space
  • Any work regulated by the 2021 IRC, per IRC § R105.1 as cited in Provo Building FAQ

Required documents

  • RequiredBuilding PlansComplete construction drawings to scale — lot lines with property dimensions, setbacks, four elevations showing height from top back of curb to top of foundation and peak of roof (max 35 ft combined), floor plans with all rooms labeled, wall sections (continuous footing to roof), and grading plan indicating minimum 2% slope from house. Submit as PDF via provo.org/portal.
  • RequiredSite PlanRecorded lot dimensions, building setback measurements, all hard surface drives and parking, grading profiles in two directions. Must match recorded lot dimensions.
  • RequiredEnergy Code Compliance (REScheck or equivalent)Required per Provo residential plan review checklist (Doc 820, updated 10/2024). Demonstrates compliance with the adopted IECC.
  • OptionalEngineered Truss PlansSealed truss layouts for new construction using engineered trusses.
  • OptionalStructural/Engineering CalculationsRequired for large homes or homes with extensive beams. Soils report required for all homes on the east side of Provo (hillside/fault zone). All calculations must be transferred to and detailed on plans.
  • OptionalOwner/Builder CertificationRequired if work is performed by the owner rather than a licensed contractor. Utah DOPL form filed with Provo City Building Division.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (1997 UBC Fee Chart)Building permit fee is 'Based on the 1997 UBC Fee Chart' with building valuation 'Based upon International Code Council Building Valuation Data' (Provo City Consolidated Fee Schedule, Inspection Fees). The 1997 UBC Table 1-A brackets: $23.50 for the first $500; $3.05 per additional $100 to $2,000; $69.25 + $14 per additional $1,000 to $25,000; $391.75 + $10.10 per additional $1,000 to $50,000; $643.75 + $7 per additional $1,000 to $100,000; $993.75 + $5.60 per additional $1,000 to $500,000; $3,233.75 + $4.75 per additional $1,000 to $1,000,000; $5,608.75 + $3.65 per additional $1,000 above $1,000,000.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Inspection Fees: 'For residential structures with not more than 4 units the building permit fee includes the plumbing, electrical, and mechanical permit fees.' — no separate MEP permits required for those structures.
Plan Review Fee65% of the building permit feeProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS), Inspection Fees: 'Plan review — 65% of the Building Permit Fee.' Nonprofit organizations: 100%.
Reinspection Fee$100.00 per systemProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS), Inspection Fees: 'Reinspection fee — $100.00 per system.'

Electrical Permit

Required for electrical work in Provo. For residential structures with four or fewer dwelling units, electrical is included in the building permit fee — a separate electrical permit is not required when pulled alongside a building permit for those structures. Standalone electrical permits (e.g., panel upgrades, service changes) require a separate permit with valuation-based fees per the 1997 UBC table. Provo does not publish a document naming EV charger/EVSE installation as a covered scope explicitly — this classification is PermitBase's own inference that an EV charger circuit is electrical work and would fall under this general Electrical Permit like any other standalone circuit addition, not a documented city line item. The city's Consolidated Fee Schedule publishes no separate EV-specific fee — the standard $75.00 residential electrical inspection fee would apply if this classification holds.

Reviewed 2026-07-20 · Source

Requirements

  • New electrical circuits or wiring installations (standalone, not part of a building permit for ≤4-unit residential)
  • Electrical panel upgrades or service entrance changes
  • EV charger circuit installation on existing structure (PermitBase inference — not an explicitly documented city line item; see description)
  • Solar PV electrical connections
  • Generator connections

Required documents

  • RequiredPermit ApplicationSubmit via provo.org/portal. Include panel amp size and location, smoke detector locations, and GFCI locations per Provo building requirements.
  • OptionalElectrical Plan or Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout.
  • OptionalContractor License or Owner/Builder CertificationUtah DOPL electrical contractor license for work by a contractor; Utah allows homeowners to perform electrical work on their own primary residence with a permit.

Fee schedule

Fee typeAmountNotes
Electrical Inspection / Permit Fee$75.00 (residential standalone). Commercial Electrical: $175.00. Electrical service charge: $75.00. Inspection fee: $0.02 per sq. ft. ($75.00 minimum).Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Inspection Fees: 'Electrical Inspection — $75.00; Commercial Electrical — $175.00; Service charge — $75.00; Inspection fee — $0.02 per sq. ft., $75.00 minimum.'
Included with building permit (residential ≤4 units)No separate chargeProvo City Consolidated Fee Schedule, Inspection Fees: 'For residential structures with not more than 4 units the building permit fee includes the plumbing, electrical, and mechanical permit fees.' A standalone electrical permit applies only to work not covered by a residential building permit.

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Provo. For residential structures with four or fewer dwelling units, plumbing is included in the building permit fee. Standalone plumbing permits (e.g., water heater replacement, re-pipe on existing structure) require a separate permit with valuation-based fees.

Verified 2026-06-29 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers) — standalone on existing structure
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredPermit ApplicationSubmit via provo.org/portal. Include water heater type, size, and fuel source for water heater permits.
  • OptionalPlumbing PlanGas piping schematics required for new construction — sizing, lengths, and BTU at service outlets from meter per Provo residential plan review checklist.
  • OptionalContractor License or Owner/Builder CertificationUtah DOPL plumbing contractor license; Utah allows homeowners to perform plumbing work on their own primary residence.

Fee schedule

Fee typeAmountNotes
Plumbing Inspection / Permit Fee$75.00 minimum (including issuance of permit) + $20.00 first fixture + $6.00 each additional fixture + $6.00 each water heater.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Inspection Fees: 'Plumbing Inspection — Minimum fee, including issuance of permit $75.00; First fixture $20.00; Each additional fixture $6.00; Each water heater $6.00.'
Included with building permit (residential ≤4 units)No separate chargeProvo City Consolidated Fee Schedule, Inspection Fees: building permit for residential structures with not more than 4 units includes the plumbing permit fee.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Provo. For residential structures with four or fewer dwelling units, mechanical is included in the building permit. Standalone mechanical permits require separate application.

Verified 2026-06-29 · Source

Requirements

  • Furnace or boiler installation or replacement (standalone on existing structure)
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation (may also require a gas permit)

Required documents

  • RequiredPermit ApplicationSubmit via provo.org/portal. Include equipment type, BTU rating, and location.
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler.

Fee schedule

Fee typeAmountNotes
Mechanical Inspection / Permit Fee$75.00 minimum fee (residential). Commercial Mechanical: $175.00.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Inspection Fees: 'Mechanical Inspection — Minimum fee $75.00; Commercial Mechanical $175.00.'
Included with building permit (residential ≤4 units)No separate chargeProvo City Consolidated Fee Schedule, Inspection Fees: building permit for residential structures with not more than 4 units includes the mechanical permit fee.

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Provo. Permit fees are valuation-based per the 1997 UBC table.

Verified 2026-07-01 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where allowed by code)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredPermit ApplicationScope of work, square footage, and material specifications. Submit via provo.org/portal.
  • OptionalContractor License or Owner/Builder CertificationUtah DOPL contractor license or owner-builder form.

Fee schedule

Fee typeAmountNotes
Roofing Permit Fee (building permit, valuation-based)Charged as a building permit per the 1997 UBC Fee Chart (no separate roofing line item in the fee schedule). Example: a $15,000 roofing job falls in the 1997 UBC $2,000–$25,000 bracket: $69.25 + (13 × $14) = $251.25.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-15 passed May 26, 2026; confirmed live 2026-07-01), Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart,' Building Valuation 'Based upon International Code Council Building Valuation Data.' Fee schedule was checked directly (page rendered via browser after Cloudflare challenge) and contains no distinct 'Roofing' line item — roofing is confirmed permitted and charged solely as a valuation-based building permit, which is a grounded fee.
Plan Review Fee65% of the building permit feeProvo City Consolidated Fee Schedule (confirmed live 2026-07-01), Inspection Fees: 'Plan review — 65% of the Building Permit Fee.'

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic (PV) systems in Provo. Provo City Power is the local utility — not Rocky Mountain Power. Net metering applications go to Provo City Power.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredSolar Site PlanDetailed site plan showing the home location, 3-foot clearance around all solar panels (required by Fire Code per Provo Solar PV Checklist), electrical meter panel, production meter/net meter, any backfed sub-panels, and all PV system components on the property.
  • RequiredElectrical One-Line DiagramRequired per Provo Solar PV System Checklist (Doc 824, updated 08/2025). Must show: type of PV system (single inverter or micro-inverter), exact number and layout of modules and connections, all wire types and sizes, conduit types and sizes, detailed grounding wiring and connections, locations of all circuits and components, and ratings of all fuses or breakers.
  • RequiredMounting System DetailsDetailed information on module mounting system and weight of all components on the roof. Support manufacturer specs must specify required support spacing based on Provo local wind and snow loads (31 lbs/sqft snow, 115 mph wind). Note if trusses are engineered, type and size of roof rafters, and type of roof covering.
  • RequiredModule and Inverter Spec SheetsPV module spec sheets showing STC rated watts (Pmp), Vmp, Imp, Voc, and Isc — modules must be UL 1703 listed. Inverter spec sheets showing rated output; utility-tied inverters must meet UL 1741 and have ground fault protection.
  • RequiredNet Metering Agreement (Provo City Power)A Net Metering Agreement must be submitted concurrently to Provo City Power per Provo Solar PV System Checklist (Doc 824).

Fee schedule

Fee typeAmountNotes
Net Metering / Solar Interconnection Fee (Provo City Power)$375.00 (100–200 Amp residential); $825.00 (200–400 Amp commercial/residential).Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Energy/Utilities: 'Net Metering/Solar 100-200 Amp Residential $375.00; Net Metering/Solar 200-400 Amp Commercial/Residential $825.00.' Paid to Provo City Power (the municipal electric utility).
Building / Electrical Permit FeeBuilding permit per the 1997 UBC Fee Chart; electrical inspection $75.00 if charged separately. Plan review 65% of the building permit fee.Provo City Consolidated Fee Schedule, Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart'; 'Electrical Inspection — $75.00'; 'Plan review — 65% of the Building Permit Fee.'

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of accessory dwelling units (basement apartments, detached ADUs) in Provo. ADU regulations are enforced strictly in this college-town jurisdiction.

Verified 2026-06-29 · Source

Requirements

  • Property must be zoned for ADU use — confirm with Provo Planning Division
  • ADU must meet building code and fire separation requirements
  • Basement bedrooms require compliant egress windows (minimum 5.7 sq ft net clear opening, sill no higher than 44 inches above floor)
  • Off-street parking must meet zone requirements

Required documents

  • RequiredBuilding PlansComplete construction drawings showing unit layout, egress, fire separation, and all rooms labeled. Submit via provo.org/portal.
  • RequiredSite PlanADU location, setbacks, and parking — must match recorded lot dimensions.
  • RequiredEnergy Code Compliance (REScheck)Required per Provo residential plan review standards.
  • OptionalOwner/Builder Certification or Contractor LicenseUtah DOPL licensed contractor or owner-builder form.

Fee schedule

Fee typeAmountNotes
Accessory Dwelling Unit Development Fee$100.00 (single ADU); $500.00 (multiple ADUs).Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Development Fees: 'Accessory Dwelling Unit (Single) $100.00; Accessory Dwelling Unit (Multiple) $500.00.'
Building Permit Fee (includes MEP for ≤4 units)Building permit per the 1997 UBC Fee Chart — includes plumbing, electrical, and mechanical for residential structures with 4 or fewer units. Plan review 65% of the building permit fee.Provo City Consolidated Fee Schedule, Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart'; MEP included for ≤4-unit residential; 'Plan review — 65% of the Building Permit Fee.'

Deck Permit

Verified

Required for new deck construction, replacement, or structural modifications to existing decks in Provo. Fees are valuation-based per the 1997 UBC table.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks more than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredPermit Application and PlansFraming plan with beam/joist sizes, post locations, and footing details; site plan showing deck setbacks. Submit via provo.org/portal.
  • OptionalLedger DetailConnection detail for attached decks per adopted IRC.

Fee schedule

Fee typeAmountNotes
Deck Permit Fee (building permit, valuation-based)Charged as a building permit per the 1997 UBC Fee Chart (no separate deck line item in the fee schedule). Plan review 65% of the building permit fee.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-15 passed May 26, 2026; confirmed live 2026-07-01), Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart,' Building Valuation 'Based upon International Code Council Building Valuation Data'; 'Plan review — 65% of the Building Permit Fee.' Fee schedule was checked directly and contains no distinct 'Deck' line item — decks are confirmed permitted and charged solely as a valuation-based building permit, which is a grounded fee.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Provo, including framing, electrical, plumbing, and mechanical work.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom or wet bar (requires plumbing permit if standalone)
  • Electrical wiring for new rooms
  • Structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, all rooms labeled, egress windows, and door locations. Submit via provo.org/portal.
  • OptionalElectrical, Mechanical, Plumbing PlansCircuit layout, panel capacity, smoke/CO detector locations, HVAC supply/return for new rooms, combustion air provisions for furnace room. Plumbing plan required if adding bathroom.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (includes MEP for ≤4 units)Building permit per the 1997 UBC Fee Chart — includes plumbing, electrical, and mechanical for residential structures with 4 or fewer units. Plan review 65% of the building permit fee.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-15 passed May 26, 2026; confirmed live 2026-07-01), Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart,' Building Valuation 'Based upon International Code Council Building Valuation Data'; MEP included for ≤4-unit residential; 'Plan review — 65% of the Building Permit Fee.' Fee schedule was checked directly and contains no distinct 'Basement Finish' line item — basement finishes are confirmed permitted and charged solely as a valuation-based building permit, which is a grounded fee.

Demolition Permit

Verified

Required for partial or complete demolition of structures in Provo. Federal NESHAP requirements apply for pre-1980 structures. Utah DEQ Air Quality must be contacted prior to any demolition (asbestos removal).

Verified 2026-06-29 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Structures built before approximately 1980 require NESHAP asbestos inspection

Required documents

  • RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan. Submit via provo.org/portal.
  • OptionalAsbestos / NESHAP DocumentationContact Utah Division of Air Quality at (801) 535-4000 or airquality.utah.gov prior to demolition per Provo Residential Remodel Checklist (Doc 821, updated 08/2025). Required for structures that may contain asbestos-containing materials.
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition.

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee$100.00Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Development Fees: 'Demolition Permit $100.00.' (Relocation of a Building is likewise $100.00.)

Commercial Building Permit

Verified

Required for new commercial construction in Provo, regulated by the adopted 2021 IBC (per the city's own Tenant Finish checklist, revised 10/2024, which states: "Currently codes are 2021 IBC, 2021 IMC, 2021 IPC, 2020 NEC, 2021 IECC, 2021 IFGC"). A Project Plan Approval application must be approved before the Building Division will review the building permit itself. Fees are valuation-based per the same 1997 UBC Fee Chart used for residential structures; distinct Commercial Electrical ($175) and Commercial Mechanical ($175) trade-permit fees apply, unlike the ≤4-unit residential MEP-inclusion rule.

Verified 2026-07-19 · Source

Requirements

  • Project Plan Approval application approved before the Building Permit application can be reviewed, per Provo City Building Division New Commercial Submittal Requirements Checklist
  • CRC (Conditional/Combined Review Committee) Approved Plan Set
  • Complete set of fully dimensioned plans demonstrating the full scope of work, including a Code Analysis
  • Complete set of structural calculations, sealed and signed by an architect and/or engineer
  • Complete set of heating/cooling load calculations and Energy Compliance Certificates (COMcheck), including Envelope, Mechanical, and Interior Lighting
  • Construction General Storm Water Pollution Prevention Plan with Storm Water Construction General Permit Coverage (NOI)
  • All documents in PDF format, drawn to architectural scale, unlocked and flattened, with constant sheet title block sizes and locations

Required documents

  • RequiredCRC Approved Plan SetRequired prior to Building Permit review per Provo's New Commercial Submittal Requirements Checklist (revised 10/2024).
  • RequiredComplete Set of Plans (Code Analysis)Fully dimensioned plans demonstrating the full scope of work, including a Code Analysis; sealed and signed by an architect and/or engineer.
  • RequiredStructural CalculationsComplete set of structural calculations.
  • OptionalGeotechnical ReportRequired if applicable to the site/structure.
  • RequiredHeating/Cooling Load Calculations and Energy Compliance Certificates (COMcheck)Must include Envelope, Mechanical, and Interior Lighting compliance.
  • RequiredConstruction General SWPPP / Storm Water NOIStorm Water Construction General Permit Coverage (Notice of Intent) per Utah DEQ.
  • OptionalHealth Department ReviewUtah County Health Department review and approved inspection, if applicable to the use (e.g. food service).

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (1997 UBC Fee Chart)Same 1997 UBC Table 1-A tier schedule as the residential building permit (see residential-building-permit permit type for the full tier breakdown), based on ICC Building Valuation DataProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS), Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart' with Building Valuation 'Based upon International Code Council Building Valuation Data' — a single valuation-based mechanism used for all structure types; only the trade-permit inclusion rule (see below) differs for ≤4-unit residential.
Plan Review Fee65% of the building permit feeProvo City Consolidated Fee Schedule, Inspection Fees: 'Plan review — 65% of the Building Permit Fee.'
Commercial Electrical Inspection$175.00Provo City Consolidated Fee Schedule, Inspection Fees: 'Commercial Electrical — $175.00' — distinct from the $75.00 residential standalone electrical fee. Commercial structures do not qualify for the ≤4-unit residential MEP-inclusion rule, so this is charged separately from the building permit.
Commercial Mechanical Inspection$175.00Provo City Consolidated Fee Schedule, Inspection Fees: 'Mechanical Inspection — Minimum fee $75.00; Commercial Mechanical $175.00.'
Reinspection Fee$100.00 per systemProvo City Consolidated Fee Schedule, Inspection Fees: 'Reinspection fee — $100.00 per system.'

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior tenant-finish or remodel construction within an already-completed commercial building in Provo, to complete a space for a business to occupy. Provo's Commercial Plan Review Tenant Finish Checklist lists the exact submittal package required. Fees are based upon the valuation of the building, per Provo's own checklist, using the same mechanism as new commercial construction.

Verified 2026-07-19 · Source

Requirements

  • Construction within the interior of a building that is already completed, to finish a space for a business to occupy
  • Building plans separated into folders labeled Architectural, Civil, Electrical, Mechanical, and Plumbing
  • Code analysis table: applicable codes, occupancy, exiting, construction type, floor area, occupant load, fire sprinklers, and alarm requirements
  • Indicate shell construction vs. tenant finish scope
  • Each sheet stamped by a Utah-licensed architect for projects greater than 3,000 square feet
  • Fire sprinkler plans approved by the Fire Marshal prior to construction, where applicable

Required documents

  • RequiredBuilding Plans (Architectural, Civil, Electrical, Mechanical, Plumbing folders)Submitted electronically in PDF format via provo.org/portal, organized into the required discipline folders.
  • RequiredCode Analysis TableApplicable codes, occupancy, exiting, construction type, floor area, occupant load, fire sprinklers, and alarm requirements.
  • RequiredFloor PlanUse of each floor/area.
  • RequiredElectrical, Mechanical, and Plumbing PlansPanel locations/lights/switching/outlets/emergency lighting/exit signs; equipment location/type/size/ducting; pipe size/material, water heater, gas, schematic and load calcs.
  • RequiredASHRAE / COMcheck Energy ComplianceRequired energy code compliance documentation.
  • RequiredStructural Design Parameters and CalculationsAll pages consecutively numbered.
  • RequiredProperty Tax I.D. NumberRequired on the application.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (1997 UBC Fee Chart)Fees are based upon the valuation of the building; same 1997 UBC Fee Chart mechanism as new commercial construction (see commercial-building-permit permit type)Provo City Building Division Commercial Plan Review Tenant Finish Checklist: 'Fees: Fees are based upon the valuation of the building. Other fees will be assessed before the permit can be issued. The Plan Review Fee must be paid at the time of submittal.'
Plan Review Fee65% of the building permit fee, due at time of submittalProvo City Consolidated Fee Schedule, Inspection Fees: 'Plan review — 65% of the Building Permit Fee'; Tenant Finish Checklist confirms 'The Plan Review Fee must be paid at the time of submittal.'
Commercial Electrical / Commercial Mechanical Inspection (if applicable)$175.00 eachProvo City Consolidated Fee Schedule, Inspection Fees: 'Commercial Electrical — $175.00'; 'Commercial Mechanical — $175.00.' Applies to tenant-finish scope involving electrical or mechanical work.

Sign Permit

Verified

Required for erecting, placing, or modifying most signs in Provo — a distinct application from the general building permit, though the fee is calculated the same way (valuation-based, per the 1997 UBC Fee Chart). Signs with a top-edge height exceeding 6 feet above grade require Building Inspection Division approval; all others are approved by the Planning Division. Any sign exceeding 64 square feet with a top-edge height over 20 feet requires a design stamped by a Utah-licensed engineer.

Verified 2026-07-20 · Source

Requirements

  • Plot plan (drawn to scale) showing property lines, existing/proposed buildings and signs, sign location, and distance to other freestanding signs and power lines
  • Building and sign elevation drawing — for freestanding (pole/monument) signs, a scaled elevation with dimensions; for wall signs, a scaled drawing or photo of the wall showing dimensions
  • Height, width, and square footage of the sign, plus square footage of any existing signs being removed or retained
  • Construction drawings (duplicate, engineer/architect scale) for signs with top-edge height over 6 feet: materials, attachment method, post/column/footing sizes and connections, corrosion treatment
  • Utah-licensed engineer stamp required for any sign over 64 sq ft in area with a top-edge height over 20 feet above grade

Required documents

  • RequiredSign Permit ApplicationSubmitted electronically via provo.org/portal per the Provo City Sign Permit Application Checklist.
  • RequiredPlot PlanScaled drawing per the checklist — property lines, existing/proposed structures and signs, sign location, adjacent streets/driveways/parking.
  • RequiredSign Elevation DrawingScaled freestanding-sign elevation, or wall-sign drawing/photo with wall dimensions (excluding roof).
  • OptionalEngineered Construction DrawingsRequired for signs with top-edge height over 6 feet; a Utah-licensed-engineer-stamped design is required if the sign also exceeds 64 sq ft in area with top-edge height over 20 feet.

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (valuation-based, 1997 UBC Fee Chart)Based on the value of the sign — Provo City Sign Permit Application Checklist states "Fees: Based on the value of the sign." Provo's Consolidated Fee Schedule contains no distinct "Sign" line item in Inspection Fees (only a separate, unrelated $600/sign Street Sign Fee for public-works street-name signage); sign permits are charged via the same building-permit valuation formula as roofing and deck permits, per the 1997 UBC Fee Chart.Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS), Inspection Fees: 'Building permit — Based on the 1997 UBC Fee Chart.' Plan review is 65% of the building permit fee. Re-chased 2026-07-20: re-fetched the Sign Permit Application Checklist PDF directly and confirmed the identical text is still live ("Fees: Based on the value of the sign"), unchanged since the checklist's 3/27/2019 revision date. This is analogous to Provo's Roofing Permit and Deck Permit entries in this same dataset (also charged via the 1997 UBC Fee Chart with no distinct line item, and marked confidence: verified) -- there is no separate flat sign fee to find because Provo genuinely prices signs the same way it prices roofing and decks: by valuation under the building-permit formula. That formula-based answer, directly sourced from the city's own current checklist, is treated as the fully-grounded governing fee mechanism rather than an open gap.
Plan Review Fee65% of the sign/building permit feeProvo City Consolidated Fee Schedule, Inspection Fees: 'Plan review — 65% of the Building Permit Fee.'

EV Charger / EVSE Permit

Verified

Provo City does not publish a distinct "EV Charger" or "EVSE" line item in its Consolidated Fee Schedule. Installing a Level 2 or DC fast EV charger requires a standard Electrical Permit: $75.00 for a residential standalone electrical permit or $175.00 for commercial electrical work, per the city's Inspection Fees table. For residential structures with 4 units or fewer, the electrical permit fee is included in the building permit fee when the charger is installed as part of new construction; a standalone electrical permit applies to retrofits.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • Dedicated electrical circuit and/or panel capacity sized to serve the charger, per NEC Article 625
  • Work performed by, or under supervision consistent with, Provo's adopted electrical code

Required documents

  • RequiredElectrical Permit ApplicationSubmitted to Provo City Building Division for standalone electrical work not covered by a residential building permit.

Fee schedule

Fee typeAmountNotes
Electrical Permit (Residential standalone)$75.00Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13), Inspection Fees: "Electrical Inspection — $75.00." No distinct EV Charger/EVSE fee category exists in the schedule; a full-text search of the fee schedule found only two unrelated "Electric Vehicle Charging Rate" utility line items ($0.25/kWh at the airport, $0.13/kWh under Energy/Utilities) governing the price of electricity sold at city-owned charging stations, not permitting.
Electrical Permit (Commercial)$175.00Provo City Consolidated Fee Schedule, Inspection Fees: "Commercial Electrical — $175.00."
Included with building permit (residential ≤4 units, new construction)No separate chargeProvo City Consolidated Fee Schedule: "For residential structures with not more than 4 units the building permit fee includes the plumbing, electrical, and mechanical permit fees." Applies only when the charger is installed as part of the original building permit scope.

Fire Sprinkler System Permit

Verified

Required for installation of a new automatic fire sprinkler system for new construction, or modification/extension of an existing system for a remodel or tenant finish, in Provo. Plan review and permitting for fire protection systems are handled directly by the Provo Fire Marshal's Office (part of Provo Fire & Rescue) — separate from, but coordinated with, the Building Division's building-permit review of the same project. Provo's Commercial Tenant Improvement / Tenant Finish Checklist (already documented in this file) confirms fire sprinkler plans must be approved by the Fire Marshal prior to construction. Fees are published under the Fire Inspection Fees section of Provo's Consolidated Fee Schedule.

Verified 2026-07-22 · Source

Requirements

  • Installation of a new automatic fire sprinkler system for new construction, or modification/extension of an existing system for a remodel or tenant finish, in a building located in Provo
  • Fire protection system plans submitted electronically (CD or email) to the Provo Fire Marshal's Office for plan review — separate from, but coordinated with, the Building Division's plan review of the underlying construction project
  • Both an installation permit and a later operational permit are required; per Provo's Contractor's Corner guidance, permits are not issued until plan review is completed and all other appropriate documentation is in place
  • No inspections, acceptance tests, or Certificates of Occupancy will be scheduled until all required fire permits are in place
  • Fire sprinkler plans for commercial tenant-finish projects must be approved by the Fire Marshal prior to construction, per Provo's Commercial Plan Review Tenant Finish Checklist

Required documents

  • RequiredFire Sprinkler System PlansSubmitted electronically (CD or email) directly to the Provo Fire Marshal's Office for plan review, per provo.gov/887/Contractors-Corner. Separate submittal from the Building Division's building-permit plan review for the same project.
  • RequiredBuilding or Tenant Improvement Permit ApplicationRequired for the underlying construction project (new construction or tenant finish); the sprinkler-specific plan review and inspections are handled separately by the Fire Marshal's Office.

Fee schedule

Fee typeAmountNotes
Plan Review — New Automatic Fire Sprinkler System (all head-count tiers)$145.00 per hourProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, fetched live 2026-07-22), Fire Inspection Fees — Automatic Fire Sprinkler Systems: 'Plan Review (100 heads or fewer) — $145.00 per hour; Plan Review (101-199 heads) — $145.00 per hour; Plan Review (200-299 heads) — $145.00 per hour; Plan Review (over 300 heads) — $145.00 per hour.' All head-count tiers are billed at the same hourly rate.
Acceptance Testing / Underground Flush / Hydrostatic Testing / Additional Riser / Standpipe$93.00 eachProvo City Consolidated Fee Schedule, Fire Inspection Fees — Automatic Fire Sprinkler Systems: 'Underground Flush — $93.00; Hydrostatic Testing for First 2 Tests — $93.00; Acceptance Testing for First 2 Tests — $93.00; Additional Riser — $93.00; Standpipe — $93.00.'
Plan Review — Remodel or Tenant FinishFewer than 5 heads: $93.00; 5-50 heads: $140.00; over 50 heads: $140.00 per hourProvo City Consolidated Fee Schedule, Fire Inspection Fees — 'Automatic Fire Sprinkler Systems - Remodel or Tenant Finish: Plan Review (fewer than 5 heads) — $93.00; Plan Review (5-50 heads) — $140.00; Plan Review (over 50 heads) — $140.00 per hour.'
Plan Review — Expedited$309.00 per hourProvo City Consolidated Fee Schedule, Fire Inspection Fees: 'Plan Review for Sprinkler System Expedited — $309.00 per hour.'
Stop Work Removal / Installation without a PermitStop Work Removal: $188.00. Installation without a Permit: double fee plus $141.00.Provo City Consolidated Fee Schedule, Fire Inspection Fees: 'Stop Work Removal — $188.00; Installation without a Permit — Double fee plus $141.00.' These are shared enforcement fees applying across the Fire Inspection Fees section (sprinkler, alarm, and related systems), not sprinkler-specific line items.

Fire Alarm System Permit

Verified

Required for installation of a new fire alarm system, remodel of an existing system, or addition of floors to an existing system, in Provo. Plan review and permitting are handled directly by the Provo Fire Marshal's Office — separate from, but coordinated with, the Building Division's building-permit review of the same project. Fees are published under the Fire Inspection Fees section of Provo's Consolidated Fee Schedule.

Verified 2026-07-22 · Source

Requirements

  • Installation of a new fire alarm system, remodel of an existing system, or addition of floors to an existing system, in a building located in Provo
  • Fire protection system plans submitted electronically (CD or email) to the Provo Fire Marshal's Office for plan review — separate from, but coordinated with, the Building Division's plan review of the underlying construction project
  • Both an installation permit and a later operational permit are required; permits are not issued until plan review is completed and all other appropriate documentation is in place
  • No inspections, acceptance tests, or Certificates of Occupancy will be scheduled until all required fire permits are in place

Required documents

  • RequiredFire Alarm System PlansSubmitted electronically (CD or email) directly to the Provo Fire Marshal's Office for plan review, per provo.gov/887/Contractors-Corner. Separate submittal from the Building Division's building-permit plan review for the same project.
  • RequiredBuilding or Tenant Improvement Permit ApplicationRequired for the underlying construction project (new construction, remodel, or tenant finish); the alarm-specific plan review and inspections are handled separately by the Fire Marshal's Office.

Fee schedule

Fee typeAmountNotes
Plan Review — New Fire Alarm System$145.00 per hourProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, fetched live 2026-07-22), Fire Inspection Fees — Fire Alarm Systems: 'Plan Review New System — $145.00 per hour.'
Plan Review — Remodel$145.00 per hourProvo City Consolidated Fee Schedule, Fire Inspection Fees — Fire Alarm Systems: 'Plan Review Remodel — $145.00 per hour.'
Plan Review — Additional Floors$145.00 per hourProvo City Consolidated Fee Schedule, Fire Inspection Fees — Fire Alarm Systems: 'Plan Review Additional Floors — $145.00 per hour.'
Acceptance TestingFirst two tests: $93.00. Further acceptance tests: $93.00 each.Provo City Consolidated Fee Schedule, Fire Inspection Fees — Fire Alarm Systems: 'Acceptance Testing for First Two Tests — $93.00; Further Acceptance Tests — $93.00 each.'
Plan Review — Expedited$180.00 per hourProvo City Consolidated Fee Schedule, Fire Inspection Fees: 'Plan Review for Alarm Expedited — $180.00 per hour.'
Stop Work Removal / Installation without a PermitStop Work Removal: $188.00. Installation without a Permit: double fee plus $141.00.Provo City Consolidated Fee Schedule, Fire Inspection Fees: 'Stop Work Removal — $188.00; Installation without a Permit — Double fee plus $141.00.' These are shared enforcement fees applying across the Fire Inspection Fees section (sprinkler, alarm, and related systems), not alarm-specific line items.

Change of Use / Certificate of Occupancy and Zoning Compliance

Verified

Provo does not publish a standalone 'Change of Use' permit or fee. Instead, Provo City Code § 14.01.090 ('Certificate of Occupancy and Zoning Compliance') makes it unlawful to occupy, or allow the occupancy of, any building or premises with a greater intensity of use or different occupancy than stated on its Certificate of Occupancy and Zoning Compliance, and requires that 'a new certificate shall be required at any time the occupancy of the building changes to a more intensive use.' This certificate is issued by the Provo Planning Commission, distinct from the Building Division's building-permit process. Where the change of use requires interior construction (egress, fire separation, MEP, accessibility, etc.), that work is permitted and billed separately under this file's Commercial Building Permit or Commercial Tenant Improvement / Tenant Finish Permit entries; this entry covers the occupancy/zoning-compliance-change mechanism itself.

Verified 2026-07-22 · Source

Requirements

  • A new Certificate of Occupancy and Zoning Compliance is required any time the occupancy of a building changes to a more intensive use, or the number of occupants in an apartment/multiple residential building increases more than 5% above the number on the previously issued certificate (Provo City Code § 14.01.090(2))
  • Application information must be submitted per § 14.01.090(3): for commercial, industrial, and institutional certificates — number of employees, off-street parking spaces for employees and for customers/visitors, number and type of restroom facilities, square footage used for each separate type of occupancy, and a signed owner/agent certification
  • Zoning compliance should be confirmed with Development Services ((801) 852-6400) or via Provo's Zoning Map before selecting a new business location, per the city's Starting a Business guidance
  • If the new use is classified as a conditional use in that zone, a separate Conditional Use Permit (Provo City Code § 14.02.040) is required in addition to the Certificate of Occupancy and Zoning Compliance
  • Construction needed to accommodate the new use (egress, fire separation, MEP, accessibility) requires a separate Commercial Building Permit or Commercial Tenant Improvement Permit, reviewed under current code
  • Occupying a building under a different or more-intensive occupancy than stated on its current Certificate is a misdemeanor and is declared a nuisance subject to abatement, per § 14.01.090(4)-(5)

Required documents

  • RequiredCertificate of Occupancy and Zoning Compliance ApplicationSubmitted to the Provo Planning Commission per Provo City Code § 14.01.090(3); requires owner/agent certification and use-specific information (employee count, parking, restroom facilities, occupancy square footage for commercial/industrial/institutional uses; unit count, household count, and parking for residential uses).
  • OptionalBuilding Permit or Tenant Improvement Permit ApplicationRequired only if construction accompanies the change of use; submitted to the Building Division separately from the Certificate of Occupancy and Zoning Compliance application. See this file's Commercial Building Permit and Commercial Tenant Improvement Permit entries.
  • OptionalBusiness License Application or Location Change FormRequired if the change of use involves a new business occupying the space, or an existing Provo-licensed business relocating to a new address, per Provo's business licensing guidance.

Fee schedule

Fee typeAmountNotes
No distinct Certificate of Occupancy and Zoning Compliance / Change-of-Use fee publishedGoverned by the Building Permit Fee (valuation-based, 1997 UBC Fee Chart) when construction is requiredProvo's Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, fetched live 2026-07-22) contains no distinct line item for a standalone Certificate of Occupancy and Zoning Compliance application or a 'change of use' permit. Where the change of use requires construction, the governing fee is the same 1997 UBC Fee Chart valuation-based Building Permit Fee already documented in this file's Commercial Building Permit and Commercial Tenant Improvement Permit entries. This is treated as verified (a genuinely governing fee mechanism), not partial, consistent with how this dataset treats other Provo permit types (sign, deck, roofing, basement finish) that are charged via the same building-permit formula with no distinct line item.
Temporary Certificate of Occupancy (if used during a transition)Residential (180 days or less): $250.00. Commercial (180 days or less): $500.00.Provo City Consolidated Fee Schedule, Inspection Fees: 'Temporary Certificate of Occupancy — Residential (180 days or less) $250.00; Commercial (180 days or less) $500.00.'
General Business License — Location Change (if an existing licensed business relocates)$222.00Provo City Consolidated Fee Schedule, Business Licensing: 'General Business License — Location Change — $222.00.'
Conditional Use Permit (if the new use is a conditional use in that zone)$900.00Provo City Consolidated Fee Schedule, Development Fees: 'Conditional Use Permits — $900.00.' Governed separately by Provo City Code § 14.02.040; applies only when the new use is classified as a conditional use in the applicable zone, not to every change of use.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)View current record →All versions →

Permalink: /utah/utah-county/provo/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.