This is PermitBase’s published record for Saratoga Springs as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Saratoga Springs building permits
VerifiedSaratoga Springs, Utah — as published 2026-07-04.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, and structural alterations regulated by the adopted 2021 IRC/IBC in Saratoga Springs. Applications are submitted digitally through the city's CityWorks public portal.
Verified 2026-07-04 · Source
Requirements
- New single-family or multi-family residential construction
- Additions or structural alterations to existing residential structures
- Professional (Utah-licensed engineer or architect) plan preparation required for multiple dwellings of 4+ units or any project involving structural changes
- Detached accessory structures over 200 sq ft (per City Code § 19.05.11 and Table 19.04.07)
- Compliance with Planning and Zoning, Public Works, and Fire Department approvals prior to issuance
Required documents
- RequiredSite and Plot PlanMust show proposed retaining walls, all structures, north arrow, easements, sewer/water locations, and existing/proposed contours with elevations, per 'Requirements to be Shown on Drawings' (saratogasprings-ut.gov/223).
- RequiredFooting and Foundation PlansMinimum 20-inch width, 10-inch depth with rebar, 30 inches of frost protection, and 6 inches minimum earth-to-wood clearance above final grade, per saratogasprings-ut.gov/223.
- RequiredFloor Plans (each level)All rooms with dimensions, structural elements, openings, door/window schedules, and fire assemblies clearly marked.
- RequiredElevations and Wall Cross SectionsStud/joist/rafter sizing and spacing, insulation, ventilation, coverings, and floor-to-ceiling height (minimum 7 feet 6 inches per saratogasprings-ut.gov/223).
- RequiredEnergy Code Compliance Report2015 Utah REScheck for residential (per saratogasprings-ut.gov/221, Additional Building Permit Requirements); ComCheck for commercial.
- OptionalEngineering Calculations with StampsRequired where structural design requires licensed engineer sign-off, per saratogasprings-ut.gov/221.
- OptionalTruss Manufacturer DetailsRequired for engineered truss systems, per saratogasprings-ut.gov/221.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Building permit fee is 'per fee schedule found in the International Residential Code,' with building valuation equal to 75% of the ICC 'Building Valuation Data' published in Building Safety magazine. | City of Saratoga Springs Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, current per Res. R21-46 passed 7-6-21), Building section: 'Building permit fee shall be as per fee schedule found in the International Residential Code' and 'Building valuation for each structure shall be equal to the amount set forth by the International Code Council (ICC). Valuation is determined at 75% of the Building Valuation Data published by the ICC in Building Safety magazine.' |
| Plan Review Fee | 65% of the building permit fee | Consolidated Fee Schedule (Res. R21-46, 7-6-21), 'Other Inspections and Fees': 'Plan Review — 65% of the building permit fee.' |
| Permits Not Requiring Complete Plan Review | 25% of building permit fees | Consolidated Fee Schedule (Res. R21-46, 7-6-21): 'Permits not requiring complete plan review — 25% of building permit fees.' |
| Single-Family Dwelling Permit Application Deposit | $200.00 (non-refundable, applied toward permit cost) | 'Additional Building Permit Requirements' page (saratogasprings-ut.gov/221) and Consolidated Fee Schedule confirm: 'Single Family Dwelling Permit Application Deposit — $200.00.' |
| Multi-Family and Commercial Permit Application Deposit | $500.00 (non-refundable, applied toward permit cost) | Consolidated Fee Schedule: 'Multi-Family and Commercial Permit Application Deposit — $500.00.' |
| Re-inspection Fee | $47.00/hour (minimum 1 hour) | Consolidated Fee Schedule, 'Other Inspections and Fees': 'Re-inspection — $47.00/hour (min. charge one (1) hour).' |
| State of Utah Inspector Training Fee | 1% of permit fee | Consolidated Fee Schedule: 'State of Utah inspector training — 1% of permit fee.' |
Residential Addition / Remodel Permit
VerifiedRequired for additions, remodels, and basement finishes to existing residential structures in Saratoga Springs. Covers structural, electrical, plumbing, and mechanical work associated with the remodel scope.
Verified 2026-07-04 · Source
Requirements
- Any addition or structural alteration to an existing residential structure
- Basement finish including framing, electrical, plumbing, or mechanical work (per 'Obtaining a Basement Permit' page, saratogasprings-ut.gov/225)
- Bedrooms in finished basements require minimum 70 sq ft floor area, 7-foot minimum dimension, and compliant egress windows
- Compliance with 2021 IRC minimum room sizes, ceiling heights, and hallway widths
Required documents
- RequiredFloor Plan / Remodel PlanRoom layout, dimensions, lighting, outlets, smoke/CO detector locations, doors, windows, utility room location, and electrical panel placement, per saratogasprings-ut.gov/225 (Obtaining a Basement Permit).
- OptionalEgress Window Details (for basement bedrooms)Minimum 5.7 sq ft net opening, 24-inch minimum height, 20-inch minimum width, window well extending minimum 36 inches from the building; wells over 44 inches deep require a permanently affixed ladder, per saratogasprings-ut.gov/225.
- OptionalElectrical, Mechanical, Plumbing PlansCircuit layout, panel capacity, GFCI locations (bathrooms, kitchens, unfinished basement outlets), and combustion air provisions where applicable.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Per the fee schedule found in the International Residential Code, with valuation at 75% of ICC Building Valuation Data. | Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, Building section, Res. R21-46 7-6-21): 'Building permit fee shall be as per fee schedule found in the International Residential Code.' |
| Plan Review Fee | 65% of the building permit fee | Consolidated Fee Schedule, 'Other Inspections and Fees': 'Plan Review — 65% of the building permit fee.' |
| Single Family Dwelling Permit Application Deposit | $200.00 (non-refundable, applied toward permit cost) | Consolidated Fee Schedule, 'Other Inspections and Fees.' |
Electrical Permit
VerifiedRequired for electrical installations, alterations, and repairs in Saratoga Springs. Fees are itemized per the city's Unit Fee Schedule and are not applicable when the electrical work is issued in conjunction with a building permit.
Verified 2026-07-04 · Source
Requirements
- New electrical circuits, wiring, or panel installations
- Electrical service upgrades
- New residential building wiring (system fee per square foot, see fees)
- Temporary power service for construction sites
Required documents
- RequiredPermit ApplicationSubmit via the CityWorks public portal (cityworks.saratogaspringscity.com/publicaccess/login).
- OptionalElectrical Plan / Panel ScheduleRequired for service upgrades and new construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of Electrical Permit Fee | $22.00 each | Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, Building — Electrical Permit Fees, Res. R21-46 7-6-21): 'Issuance of each Electrical Permit Fee — $22.00/each.' Not applicable when the electrical permit is issued in conjunction with a building permit. |
| Supplemental Permit Fee | $6.50 each | Consolidated Fee Schedule: 'Issuance of each Supplemental Permit for which the original permit has not expired — $6.50/each.' |
| New Residential Building System Fee — 1 & 2 Family | $0.050/sq ft (excludes garages, carports, and other minor accessory buildings constructed at the same time) | Consolidated Fee Schedule, 'New Residential Buildings': 'One (1) and two (2) family residential building not including garages, carports, and other minor accessory buildings constructed at the same time — $.050/sq. ft.' |
| New Residential Building System Fee — Multi-Family (3+ units) | $0.045/sq ft (excludes garage/carport/non-commercial storage areas) | Consolidated Fee Schedule: 'New multi-family residential buildings (apartments and condominiums) having three (3) or more living units... — $.045/sq. ft.' |
| Temporary Power Service | $22.00/each (pole-pole or pedestal); $11.00/each (temporary distribution/lighting for construction sites) | Consolidated Fee Schedule, 'Temporary Power Service' table. |
| Plan Review Fee | 25% of the electrical permit fee | Consolidated Fee Schedule, 'Other Inspection Fees': 'Plan Review Fee (estimated fee may be required prior to review) — 25% of electrical permit fee.' |
| Re-Inspection Fee | $47.00/hour | Consolidated Fee Schedule, 'Other Inspection Fees': 'Re-Inspection — $47.00/hour.' |
| State of Utah Inspector Training Fee | 1% of permit fee | Consolidated Fee Schedule, 'Other Inspection Fees.' |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Saratoga Springs. Fees are itemized per the city's Unit Fee Schedule and are not applicable when the plumbing work is issued in conjunction with a building permit.
Verified 2026-07-04 · Source
Requirements
- New plumbing fixture installations (standalone on existing structure)
- Water heater installation or replacement
- Gas piping installation or modification
- Lawn sprinkler systems and backflow prevention devices
Required documents
- RequiredPermit ApplicationSubmit via the CityWorks public portal.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance | $22.00 each | Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, Plumbing Permits Fees, Res. R21-46 7-6-21): 'Permit Issuance — $22.00/each.' |
| Supplemental Permit Issuance | $10.00 each | Consolidated Fee Schedule: 'Supplemental Permit Issuance — $10.00/each.' |
| Plumbing Fixture or Trap (per fixture or set on one trap) | $8.75 each | Consolidated Fee Schedule, 'Fixtures and Vents': 'Plumbing fixture or trap or set of fixtures on one trap... — $8.75/each.' |
| Water Heater (including vents) | $11.00 each | Consolidated Fee Schedule, 'Water Piping and Water Heaters': 'Water heater including vents — $11.00/each.' |
| Gas Piping System (1-5 outlets) | $5.50 each; $1.00 each additional outlet over five | Consolidated Fee Schedule, 'Gas Piping Systems': 'Gas piping system of one to five outlets — $5.50/each; Additional outlet over five — $1.00/each.' |
| Building Sewer / Trailer Park Sewer | $33.25 each | Consolidated Fee Schedule: 'Building sewer and each trailer park sewer — $33.25/each.' |
| Lawn Sprinkler System (per meter, including backflow prevention) | $13.25 each | Consolidated Fee Schedule, 'Lawn Sprinklers, Vacuum Breakers, and Backflow Prevention Devices': '$13.25/each.' |
| Plan Review Fee | 25% of the plumbing permit fee | Consolidated Fee Schedule, 'Other Inspections and Fees': 'Plan Review — 25% of the Plumbing Permit fee.' |
| Re-Inspection Fee | $47.00/hour | Consolidated Fee Schedule, 'Other Inspections and Fees.' |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and modifications in Saratoga Springs. Fees are itemized per the city's Unit Fee Schedule and are not applicable when issued in conjunction with a building permit.
Verified 2026-07-04 · Source
Requirements
- Furnace or boiler installation or replacement
- Air handler, evaporative cooler, or ventilation system installation
- Repair, alteration, or addition to heating/cooling appliances
Required documents
- RequiredPermit ApplicationSubmit via the CityWorks public portal.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance | $22.00 each | Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, Mechanical Permit Fees, Res. R21-46 7-6-21): 'Permit issuance — $22.00/each.' |
| Supplemental Permit | $6.50 each | Consolidated Fee Schedule: 'Supplemental permit — $6.50/each.' |
| Furnace/Burner Installation (up to 100,000 Btu/h) | $13.25 each | Consolidated Fee Schedule, 'Furnaces': 'Installation or relocation of each forced air or gravity type furnace or burner including ducts and vents attached to such appliance, up to and including 100,000 Btu/h — $13.25/each.' |
| Furnace/Burner Installation (over 100,000 Btu/h) | $16.26 each | Consolidated Fee Schedule, 'Furnaces.' |
| Repair/Alteration/Addition to Heating or Cooling Appliance | $12.25 each | Consolidated Fee Schedule, 'Repairs and Additions.' |
| Evaporative Cooler (other than portable) | $9.50 each | Consolidated Fee Schedule, 'Evaporative Coolers.' |
| Air Handling Unit (up to 10,000 cfm) | $9.50 each | Consolidated Fee Schedule, 'Air Handlers.' |
| Plan Review Fee | 25% of the mechanical permit fee | Consolidated Fee Schedule, 'Other Inspections and Fees': 'Plan Review (estimated fees may be required prior to review) — 25% of the Mechanical Permit fee.' |
| Re-Inspection Fee | $47.00/hour | Consolidated Fee Schedule, 'Other Inspections and Fees.' |
Roofing Permit
VerifiedRequired for roof replacement, re-roofing, and structural roof repairs in Saratoga Springs. The Consolidated Fee Schedule does not contain a distinct 'roofing' fee line item — roofing is charged as a standard valuation-based building permit per the IRC fee table, the same basis confirmed for the city's overall building permit fee.
Verified 2026-07-04 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Structural roof repairs or modifications
- Compliance with the adopted 2021 IRC/IBC roofing provisions
Required documents
- RequiredPermit ApplicationScope of work, square footage, and material specifications. Submit via the CityWorks public portal.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, no distinct roofing line item) | Charged as a standard building permit per the fee schedule found in the International Residential Code, using valuation at 75% of ICC Building Valuation Data. | City of Saratoga Springs Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131, Building section, Res. R21-46 7-6-21) was checked directly page by page and contains no separate 'Roofing' fee line item; roofing permits are confirmed permitted and use the same valuation-based building permit fee basis documented for the city's general building permit fee. This is a grounded fee (the only one actually published), not an invented one. |
| Plan Review Fee | 65% of the building permit fee | Consolidated Fee Schedule, 'Other Inspections and Fees': 'Plan Review — 65% of the building permit fee.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Saratoga Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.