You are viewing the permanent link for the record currently in effect, published 2026-07-16.
Springville building permits
VerifiedSpringville, Utah — as published 2026-07-16.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, and structural alterations regulated by the adopted 2021 IRC. Springville requires pre-approval from Planning & Zoning and Storm Water departments (via My City Inspector) before the Building Division will receive and review the project — a 2018 Utah legislative change Springville implemented as a pre-review gate.
Verified 2026-07-04 · Source
Requirements
- New single-family residential construction
- Additions or structural alterations to existing residential structures
- Building designed to the 2021 IRC (International Residential Code) per Springville Residential Building Permit Checklist (July 2023)
- Planning & Zoning and Storm Water pre-approval through My City Inspector required before Building Division review begins
- Payment of required fees before application and plans are reviewed
Required documents
- RequiredBuilding Permit ApplicationCompleted and signed building permit application, submitted via My City Inspector (springville.mycityinspector.com).
- RequiredPlat or Site PlanShows irrigation ditches, utility locations as built, water meter and pressurized-irrigation (PI) location (cannot be in the driveway), contours for sloping lots, and retention if any.
- RequiredFooting and Foundation Plan, Floor Plans, Elevations, Wall Cross SectionElevations must show cross sections with overall height from natural grade; finish and natural/existing grade in relation to curb height, finish floor height, retaining walls, flood plains, and fault lines (if applicable).
- RequiredPlumbing, Mechanical, and Electrical PlansPlumbing and mechanical layouts, electrical plans, diagram of gas line (size, length, BTU of appliances).
- RequiredEnergy Analysis / Envelope DescriptionFor energy code compliance, per Springville Residential Building Permit Checklist.
- RequiredManual D, J, and S ComplianceStatic pressure design and HVAC specifications.
- RequiredSoils Geotechnical ReportIndicating allowable bearing pressure, water table depth, and foundation drainage requirements. Slope stabilization required for sloping lots and retaining walls.
- OptionalEngineering (if required)Wet-stamped calculations; truss manufacturer's detail sheet if applicable; retaining wall construction endorsement from a structural engineer if used.
- OptionalOwner/Builder CertificationSigned and notarized, if the owner (not a licensed contractor) is performing the work.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee | Due in FULL at time of permit submission — contact office staff for the exact amount; no fixed published dollar figure. | Springville Residential Building Permit Checklist (July 2023): 'Plan check fee is due in FULL at time of permit submission. Contact office staff for amount.' Confirmed independently in Springville City FY2025 Comprehensive Fee Schedule (springvilleutah.gov, Exhibit B, Building Fees section, line 409): 'Plan Check Fee — Assessed by Plans Examiner (Resolution No. 97-13).' No valuation-based formula or flat rate is published; Springville's own official fee schedule states the fee is individually assessed rather than table-driven, unlike Provo's published 1997 UBC chart. |
| Plan Review Deposit (Single Family Dwelling) | Typically $800–$1,100, depending on building size; provided within 2 business days of application submission once square-footage calculations are available in the plan set. | Springville Building FAQ (springvilleutah.gov/community-development, Building-FAQ-2.pdf): 'What is the plan review deposit amount? It depends on the size of the building. For a Single Family Dwelling it typically is between $800 - $1100. The plan review deposit amount will be provided within 2 business day[s] of submitting the application where square foot calculations are available in the plan set.' |
| Building Permit Fee | Assessed by Plans Examiner — no fixed valuation table published. | Springville City FY2025 Comprehensive Fee Schedule (springvilleutah.gov, Exhibit B, Building Fees, line 410): 'Building Permit Fee — Assessed by Plans Examiner (Resolution No. 2007-06).' Unlike Provo's published 1997 UBC valuation chart, Springville's own fee schedule does not publish a formula or flat rate for this line item. |
| Re-inspection Fee | $65.00 for each additional inspection beyond the one re-inspection allowed per required inspection. | Springville Residential Building Permit Checklist (July 2023): 'One re-inspection is allowed for each required inspection. Additional inspections require a $65 re-inspection fee.' |
| Permit Renewal Fee (after expiration) | One-half of the original permit fee. | Springville Residential Building Permit Checklist (July 2023): 'A building permit expires 180 days (six months) after being issued, or from the last inspection. If your permit expires[,] one-half of the original permit fee will be charged to renew the permit.' |
Residential Addition / Remodel Permit (includes Basement Finish)
VerifiedRequired for interior remodels that add or remove structural components or change electrical, HVAC, or plumbing systems, and for finishing an unfinished basement into habitable space. Springville's Basement Improvement Permit Checklist applies the same 2021 IRC and State Amendments standard as new construction.
Verified 2026-07-04 · Source
Requirements
- Interior remodel: permit needed if adding/removing structural components, or changing electrical, HVAC, or plumbing systems, per Springville Building FAQ
- Basement finish: changing an unfinished basement to a habitable location, or adding electrical, plumbing, or heating systems, requires a permit per Springville Basement Improvement Permit Checklist (July 2023)
- Building shall be designed to the 2021 IRC and State Amendments
Required documents
- RequiredBuilding Permit ApplicationCompleted application, available at Springville City offices or online at springville.org/permits.
- RequiredFloor Plan of Proposed AreaLabel all areas for intended use.
- OptionalSite Plan (if walk-out included)Shows house location on property, location of improvements, and setback measurements.
- OptionalEngineering for Beams Replacing Bearing WallsRequired when removing or altering load-bearing walls.
- RequiredWindow and Door Locations, Mechanical Room LocationShow all window/door locations and location of mechanical room/equipment.
- OptionalElectrical/Gas InformationDepending on scope of work.
- OptionalContractor Information or Owner/Builder CertificateSigned and notarized if owner-performed.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee | Due in FULL at time of permit submission — contact office staff for amount. | Springville Basement Improvement Permit Checklist (July 2023): 'Plan check fee is due in FULL at time of permit submission. Contact office staff for amount.' |
| Re-inspection Fee | $65.00 for additional inspections beyond the one included re-inspection. | Springville Basement Improvement Permit Checklist (July 2023): 'One re-inspection is allowed for each required inspection and is included in the permit fees, any additional inspections require a $65 re-inspection fee.' |
| Permit Renewal Fee (after expiration) | One-half of the original permit fee. | Springville Basement Improvement Permit Checklist (July 2023): 'A building permit expires 180 days (six months) after being issued or from the last inspection. If your permit expires, payment of half of the original permit fee will be charged to renew the permit.' |
Electrical Permit
VerifiedRequired for electrical work in Springville. Unlike Provo's ≤4-unit MEP-inclusion model, Springville does NOT bundle electrical into the building permit fee — electrical, plumbing, and mechanical permits must be applied for and paid separately by each subcontractor, even on new residential building permits. EV charger/EVSE installation is electrical work and falls under this standalone Electrical Permit; the FY2025 Comprehensive Fee Schedule and Building Division page do not publish a separate EV-specific line item or process.
Verified 2026-07-04 · Source
Requirements
- New electrical circuits, wiring, or service changes
- Electrical work must be permitted and paid for separately from the building permit — 'Electrical, Plumbing, or Mechanical Permits need to be applied and paid for separately by each Subcontractor'
- Building/electrical work designed to the 2021 IRC and statewide 2023 NEC
Required documents
- RequiredTrade Permit ApplicationSubmitted via My City Inspector (springville.mycityinspector.com), separately from the building permit.
- OptionalElectrical PlansRequired as part of the plan set when electrical is part of a building permit submittal; a standalone electrical trade permit is required in addition.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | No fixed dollar figure published for a standalone electrical permit was found in Springville's official Building Fees section of the FY2025 Comprehensive Fee Schedule (which lists only Building Permit Fee and Plan Check Fee as 'Assessed by Plans Examiner,' with no separate electrical line item). | Springville City FY2025 Comprehensive Fee Schedule (Exhibit B, Building Fees, lines 395-414) contains no distinct 'Electrical Permit' fee line — only 'Building Permit Fee' and 'Plan Check Fee,' both 'Assessed by Plans Examiner.' Trade-permit fees for electrical work are confirmed as separately charged (per the code-ordinance summary: 'Electrical, Plumbing, or Mechanical Permits need to be applied and paid for separately by each Subcontractor') but no published flat rate or valuation table for electrical specifically was located; omitting the specific dollar figure rather than estimating it. |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Springville. Plumbing permits must be applied for and paid separately from the building permit — not bundled, unlike Provo's ≤4-unit model.
Verified 2026-07-04 · Source
Requirements
- New plumbing fixture installations, water heater replacement, water/sewer line work
- Plumbing Permits need to be applied and paid for separately by each Subcontractor
- Underground plumbing and sewer lateral inspections require water testing per Springville Residential Building Permit Checklist
Required documents
- RequiredTrade Permit ApplicationSubmitted via My City Inspector, separately from the building permit.
- OptionalPlumbing PlanPlumbing layout as part of the overall plan set when plumbing is part of new construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | No fixed dollar figure published for a standalone plumbing permit was found in Springville's Building Fees fee-schedule section. | Springville FY2025 Comprehensive Fee Schedule (Exhibit B, Building Fees, lines 395-414) lists no separate 'Plumbing Permit' line item — only 'Building Permit Fee' and 'Plan Check Fee,' both 'Assessed by Plans Examiner.' Confirmed via ordinance-summary source that plumbing permits are charged separately from the building permit; no specific rate was located, so none is asserted. |
Mechanical / HVAC Permit
VerifiedRequired for furnace, A/C, and other HVAC installations and replacements in Springville, including like-for-like replacements. This is one of the few Springville permit types with a directly published flat fee.
Verified 2026-07-04 · Source
Requirements
- Furnace or A/C replacement or installation
- Ductwork installation or modification
- Mechanical Permits need to be applied and paid for separately by each Subcontractor when part of new construction
Required documents
- RequiredTrade Permit ApplicationSubmitted via My City Inspector.
- OptionalEquipment SpecificationsManufacturer data for furnace/AC unit being installed or replaced.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Furnace / A/C Replacement Fee | $51.00 | Springville Building FAQ (Building-FAQ-2.pdf, 'Payments' section): 'How much does a building permit cost? It depends on the project. Replace furnace / A/C: $51.' |
Roofing Permit
VerifiedRequired for roof replacement and re-roofing in Springville. Roofing has a directly published flat fee, distinct from Provo's valuation-based 1997 UBC approach.
Verified 2026-07-04 · Source
Requirements
- Roof replacement or re-roofing — permit required per Springville Building FAQ ('Roof - Yes' under 'Do I need a permit to build?')
- Building shall be designed to the 2021 IRC
Required documents
- RequiredPermit ApplicationScope of work, square footage, material specifications, submitted via My City Inspector.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof Home Fee | $101.00 | Springville Building FAQ (Building-FAQ-2.pdf, 'Payments' section): 'How much does a building permit cost? It depends on the project. ... Re-roof home: $101.' |
Commercial Building Permit
VerifiedRequired for new commercial construction in Springville. Permits cannot be accepted unless the site has Development Review Committee (DRC) review and approval and all outside fees (irrigation company, SWPPP, etc.) have been paid. A preconstruction meeting is required for all multi-family and commercial projects before construction starts. Per Springville's own Building FAQ, initial commercial plan review takes 21 business days.
Verified 2026-07-19 · Source
Requirements
- Site has DRC (Development Review Committee) review and approval before the building permit can be accepted
- All outside fees (irrigation company fees, SWPPP fees, etc.) paid before permit submission
- Completed Building Permit application
- Plan check fee due in FULL at time of permit submission
- Water shares tendered, if not previously done with the development
- Preconstruction meeting required for all multi-family and commercial projects prior to construction start
Required documents
- RequiredPlat or Site Plan (DRC-Approved)Per Springville Commercial Building Permit Checklist (2026).
- RequiredCover Sheet (Code Analysis)Design information showing code analysis.
- RequiredStructural Design / Architectural DrawingsWith appropriate engineering endorsements.
- RequiredElectrical / Mechanical / Plumbing PlansWith appropriate professional endorsements, including an Electrical Service Information Request form.
- OptionalTruss Engineering and LayoutFrom the truss manufacturer, where applicable.
- RequiredHeating/Cooling Load Calculations and ComCheck/ASHRAE 90.1 ComplianceDuct design and energy code compliance documentation.
- RequiredEgress Components with Load CalculationsPer Springville Commercial Building Permit Checklist.
- RequiredADA Compliance (2009 ANSI A117.1)Accessibility compliance documentation.
- OptionalFire Protection Systems / Fire-Resistive ConstructionAs applicable to occupancy and construction type.
- RequiredGeotechnical ReportPer Springville Commercial Building Permit Checklist.
- RequiredConstruction ValuationA bid may be submitted for valuation purposes.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee | Due in FULL at time of permit submission — contact office staff for the exact amount; no fixed published dollar figure. | Springville Commercial Building Permit Checklist (2026): 'Plan check fee is due in FULL at time of permit submission. Contact office staff for amount.' Confirmed via Springville City FY2025 Comprehensive Fee Schedule (Exhibit B, Building Fees, line 409): 'Plan Check Fee — Assessed by Plans Examiner (Resolution No. 97-13).' No commercial-specific valuation table is published — same individually-assessed mechanism as the residential building permit. |
| Building Permit Fee | Assessed by Plans Examiner — no fixed valuation table published. | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, Building Fees, line 410: 'Building Permit Fee — Assessed by Plans Examiner (Resolution No. 2007-06).' |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior tenant-improvement or remodel work within an existing commercial space in Springville, per the city's own Tenant Improvement Checklist (2026). Any structural, electrical, plumbing, or HVAC change must be permitted, and the use of the space must be reviewed with a Code Analysis from an Architectural Design Professional. Initial plan review is published at 21 business days, same as new commercial construction, since a tenant improvement is itself a commercial application.
Verified 2026-07-19 · Source
Requirements
- Any structural, electrical, plumbing, or HVAC change to the tenant space
- Code Analysis from an Architectural Design Professional addressing occupant load, exiting, possible fire-resistive construction, number of restrooms, and ADA accessibility accommodations
- Completed and signed Building Permit application
- Plan check fee due in FULL when the permit application is submitted
- Contractor information or a signed Owner/Builder Certificate
Required documents
- RequiredBuilding PlansDrawn to scale, endorsed and signed by an architect and all other professional designers.
- RequiredCode Analysis SheetOccupancy group, type of construction, occupant load, and allowable area.
- RequiredFloor PlanDimensions, exits, occupancy types and use, ADA provisions, equipment/shelving/counter locations, occupant load, restroom locations, adjacent business uses; wall section with stud size, height, spacing, insulation, fire separation, gypsum board, and structural connections.
- RequiredPlumbing PlanPlumbing schematic and type of material used.
- RequiredMechanical PlanMechanical schematic, size of ducts, location of return air ducts and fire dampers, combustion air, HVAC units, and kitchen hoods.
- RequiredElectric PlanElectrical locations, calculations, emergency/exit lighting, and panel schedules.
- RequiredEnergy Compliance CalculationsComCheck or equivalent.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee | Due in FULL when the permit application is submitted — contact the Building Department at 801.489.2704 for the amount. | Springville Tenant Improvement Checklist (2026): 'The plan check fee is due in full when the permit application is submitted. For the amount, contact the Building Department at 801.489.2704.' No fixed commercial-TI valuation table is published — same individually-assessed mechanism used for all Springville building/commercial permits. |
| Re-inspection Fee | $85.00 for each additional inspection beyond the one included re-inspection per required inspection. | Springville Tenant Improvement Checklist (2026): 'One re-inspection is allowed for each required inspection and is included in the permit fees, after which any additional inspections require a $85 re-inspection fee.' This differs from the $65.00 re-inspection fee published for residential permits. |
| Permit Renewal Fee (after expiration) | One-half of the original permit fee. | Springville Tenant Improvement Checklist (2026): 'A building permit expires 180 Days (six months) after being issued, or from the date of the last inspection. If your permit expires, one-half of the original permit fee will be charged to renew the permit.' |
Solar Panel (PV) Permit
VerifiedRequired for rooftop or ground-mounted solar photovoltaic installations in Springville, per the city's official Solar Permit Process document. Because Springville operates its own municipal electric utility (Springville City Power), solar installations require BOTH a Building Permit (structural/electrical plan review) AND a separate Customer-Owned Generation Agreement/Application with Springville Power before the utility will install the required production meter — unlike Rocky Mountain Power cities where interconnection is handled entirely outside city government.
Verified 2026-07-19 · Source
Requirements
- Completed and signed building permit application including licensed installer information and system valuation (labor and materials)
- System shall be designed to the current statewide-adopted IRC and NEC editions (2021 IRC, 2023 NEC per Utah Code § 15A-2-103 as of 2026-07-19 — Springville's own Solar Permit Process document is dated 2019 and still cites the outdated '2015 IRC and 2017 NEC,' which the current statewide statute supersedes)
- All electrical equipment must carry UL listing
- Plan check deposit required (paid in full at submission) for systems larger than 4 kW
- Springville Power requires a completed Customer-Owned Generation Agreement and Customer-Owned Generation Application before installation of the utility meter
- Springville Power Standards require a dedicated production meter as part of the Customer-Owned Generation Agreement
- Payment of completion and performance bonds required when picking up the building permit
Required documents
- RequiredBuilding Permit ApplicationCompleted and signed, including licensed installer information and system valuation (labor and materials); submitted via My City Inspector (springville.mycityinspector.com). Per the official Solar Permit Process document: 'Permits will not be accepted as incomplete submissions.'
- RequiredSite PlanModule locations, structures, location of equipment, location of existing vents and exhaust outlets, and fire access setbacks from ridges, eaves, and valleys.
- RequiredConstruction Drawings and One-Line DiagramOne complete electronic set (PDF) showing equipment locations, conductor sizes and types.
- RequiredInter-connection Location DetailsDisconnect location and size of overcurrent protection.
- RequiredSystem Sizing CalculationsOvercurrent protection sizing, conductor sizing, and maximum allowed system-based rating of equipment.
- RequiredLabels, Placards, and Equipment PhotosLocation of labels/placards with an appropriate list of labels provided, plus pictures of existing service equipment showing rating size and interconnection breaker location.
- RequiredRacking Support Locations and Technical Data SheetsTechnical data for racking, inverters, micro-inverters, optimizers, rapid shutdown devices, flashings, supports, junction boxes, combiners, modules, and service equipment (if upgrading).
- RequiredEngineering LetterClearing existing conditions of additional loading on the truss or rafter system.
- RequiredCustomer-Owned Generation Agreement and Application (Springville Power)Required by Springville City Power before installation of the utility production meter — scheduled by calling Springville City Power at (801) 489-2750 (7 am-3:30 pm) for an in-person appointment to sign required documentation.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Deposit (systems larger than 4 kW) | Due in FULL at time of permit submission — contact office staff for amount. | Springville Solar Permit Process (official PDF, springvilleutah.gov/wp-content/uploads/sites/5/2019/07/Solar-Permit-Process.pdf), verbatim: 'Plan check deposit required for systems larger than 4 kW at time of application and is due in FULL at time of permit submission. Contact office staff for amount.' No fixed dollar figure is published, consistent with Springville's standard 'Assessed by Plans Examiner' practice for its general Building Permit Fee and Plan Check Fee. |
| 2S Meter Solar (single-phase solar connection fee) | $350.00 | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B (Power Department Connection Fees, line 826): '2S Meter Solar — 350.00' (Resolution 2020-38). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19). |
| (3PH) Direct Metered Service 277/480V - 200 Amp Solar | $700.00 | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 834 (labeled 'NEW'). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19). |
| (3PH) Direct Metered Service 120/208V - 400 Amp Solar | $705.00 | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 835 (Resolution 2020-38). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19). |
| Customer-Owned Generation Export Rate (Residential) | $0.040 per kWh | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 811 (Ordinance #04-2018, Resolution #2017-39). Confirmed via direct page-image render of the source PDF (page 22, fetched 2026-07-19); matches the rate independently confirmed on Springville Power's own Customer-Owned Generation program pages. |
| Commercial Customer-Owned Generation Export Rate | $0.040 per kWh | Springville City FY2025 Comprehensive Fee Schedule, Exhibit B, line 812 (Ordinance #04-2018, Resolution #2017-39). |
Fire Sprinkler, Alarm, and Hood Plan Review Permit
Required for fire alarm systems, fire sprinkler systems, and hood extinguishing systems in Springville. Per the city's own Fire and Rescue 'Fire Sprinkler, Alarm and Hood Plan Inspections' page, the Springville City Fire Marshal — not the Building Division — reviews these plans directly, and 'Upon approval construction permits will be issued.' This is a genuinely distinct review track from the Building Division's My City Inspector process used for the residential/commercial building permits in this file, but no separate dollar fee for fire plan review or fire-marshal inspection was found published anywhere on springvilleutah.gov or in the FY2025 Comprehensive Fee Schedule (Exhibit B) as of 2026-07-20 — that schedule's only fire-adjacent 'Alarm Permit Fee' ($25.00, line 103) is filed under 'Public Safety Fees' immediately after Dog License/Animal Shelter fees and billed under Resolution No. 98-35, which is the Police Department's burglar/security alarm registration permit, not a fire-marshal life-safety-system fee — it is NOT included here as it would misattribute an unrelated fee. Re-chased 2026-07-20: located and checked the newer FY2026 Comprehensive Fee Schedule (published 2025-09, springvilleutah.gov/wp-content/uploads/sites/6/2025/09/FY-2026-Comprehensive-Fee-Schedule.pdf), which supersedes the FY2025 edition — it shows the same unrelated $25.00 Police-Department 'Alarm Permit Fee' (renumbered line 101) and no fire-marshal-specific plan-review or permit fee anywhere in its ~2,300 line items, including its Building Fees and Public Works sections (checked a $1,065.02 'Plan Check Fee' at line 410, which is a Public Works/utility-extension plan-check fee tied to water meter and fire hydrant meter infrastructure, not fire-system life-safety plan review). The Fire and Rescue 'Fire Sprinkler, Alarm and Hood Plan Inspections' page was also re-fetched directly and is unchanged — it still states construction permits are issued upon Fire Marshal approval but publishes no dollar figure.
Reviewed 2026-07-20 · Source
Requirements
- Applies to fire alarm systems, fire sprinkler systems, and hood extinguishing systems, plus related preliminary site plans, fire department apparatus accessibility, fire flow requirements, and new fire hydrant placement
- Plans reviewed directly by the Springville City Fire Marshal, separate from the Building Division's plan review
- Plans must be submitted electronically by email (via the Fire and Rescue department's 'Email Plans' link)
- Construction permits are issued only upon the Fire Marshal's approval of submitted plans
- Inspections must be requested at least two days before the intended inspection date, by phone or email to the Fire Marshal
- Inspections are not conducted on Mondays (to accommodate a required 24-hour battery test); Friday inspections are by request only
Required documents
- RequiredFire Sprinkler / Alarm / Hood Plan SubmittalPlans submitted electronically by email directly to the Fire Marshal, per Springville Fire and Rescue's 'Fire Sprinkler, Alarm and Hood Plan Inspections' page — this is separate from the My City Inspector submittal used for the associated building permit.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Plan Review / Inspection Fee | No fire-marshal-specific dollar figure was found published on springvilleutah.gov or in either the FY2025 or the newer FY2026 Comprehensive Fee Schedule. | Springville's 'Fire Sprinkler, Alarm and Hood Plan Inspections' page (springvilleutah.gov/fire-rescue/inspections-permits/fire-inspection/fire-inspection-plans/) states plans are reviewed by the Fire Marshal and permits issued upon approval, but publishes no fee amount; re-fetched directly 2026-07-20 and unchanged. The FY2025 Comprehensive Fee Schedule (Exhibit B, Public Safety Fees, line 103) lists only an unrelated 'Alarm Permit Fee — $25.00' under Resolution No. 98-35, which context (adjacent Dog License and False Alarm Response line items) identifies as the Police Department's burglar/security-alarm registration fee, not a fire-system plan-review fee — omitted here rather than misattributed. Re-chased 2026-07-20: located the newer FY2026 Comprehensive Fee Schedule (springvilleutah.gov/wp-content/uploads/sites/6/2025/09/FY-2026-Comprehensive-Fee-Schedule.pdf, published 2025-09, supersedes the FY2025 edition) and confirmed the same unrelated $25.00 Police-Department fee (renumbered line 101) is the only 'alarm' line item in the entire ~2,300-line schedule — no fire-marshal plan-review or permit fee exists there either. It is possible fire-system review costs are absorbed into the general Building Permit Fee / Plan Check Fee ('Assessed by Plans Examiner,' per the residential/commercial permit entries in this file), but no Springville-published source confirms that mechanism specifically for fire-marshal review; confirm directly with the Fire Marshal's office, (801) 491-5602. THIRD re-chase pass 2026-07-20: (1) ran a full Wayback CDX sweep of the entire springvilleutah.gov domain (2,377 archived URLs) filtered for fire/fee/sprinkler/marshal terms -- turned up nothing beyond an unrelated Art City Days 'Grand Marshal' page; no dedicated fire-fee PDF exists outside the Comprehensive Fee Schedule already checked. (2) Located and read Springville City Code Chapter 3-4 (Fire Code) directly (codepublishing.com blocks direct fetch with 403; retrieved via Wayback archive snapshot instead) -- it contains no fire sprinkler/alarm/hood permit fee section. The only fee reference in the entire chapter is for underground LPG storage tank permits, which states the fee is 'to be set by the City Council from time to time' -- i.e., confirms fees for fire-related permits are set by Council resolution (the Comprehensive Fee Schedule) rather than codified in the Fire Code itself, and that schedule (already checked twice, FY2025 and FY2026, ~2,300 line items) has no fire-marshal plan-review or sprinkler/alarm/hood line item. (3) Checked Springville City Council agenda/minutes archive and Utah PMN postings for any resolution specifically setting a Fire Marshal plan-review fee -- none found. This is a fourth independent negative confirmation (live Fire and Rescue page, FY2025 schedule, FY2026 schedule, Fire Code chapter itself) that no such fee is published anywhere by the city. Genuinely appears to be assessed case-by-case by the Fire Marshal rather than posted. Do not re-chase without a direct answer from the Fire Marshal's office or a newly adopted fee resolution. |
Sign Permit
VerifiedRequired for signs in Springville, per the city's own Sign Permit Checklist (2026). Signs shall be designed to the 2021 IBC and 2023 NEC and conform to Springville City Ordinance Title 11-6-310. As with Springville's other building permit types, the plan check fee is individually assessed by the Plans Examiner rather than published as a fixed dollar figure or valuation table.
Verified 2026-07-20 · Source
Requirements
- Sign shall be designed to the 2021 IBC and 2023 NEC and conform to Title 11-6-310 Springville City Ordinance
- One complete set of electronic construction plans submitted in PDF format via My City Inspector (springville.mycityinspector.com)
- Completed and signed building permit application including licensed installer information and valuation of sign
- Proof of a current Springville City business license
- Engineering (with wet stamp, calculations, and attachment schedule) required if the sign meets or exceeds any of: projects more than 4 inches from wall/structure; exceeds 4 lbs per square foot; stand-off dimension exceeds 2 inches from wall/structure; or exceeds 4 feet in height from grade for a stand-alone sign
- All electrical signs require UL listing as a sign per NEC 600.3
- Permit applications will not be accepted as incomplete submissions
Required documents
- RequiredBuilding Permit ApplicationCompleted and signed, including licensed installer information and valuation of sign; submitted via My City Inspector.
- RequiredSite PlanProperty lines and dimensions, existing and proposed buildings/structures/signs, overhead utility lines, and streets/driveways/parking spaces/landscaping within 20 feet of the property.
- RequiredBuilding ElevationsCross sections with overall height from natural grade and size of sign with dimensions (area, width, height, depth); for individual letters/graphics, dimensions per row including distances between lines of text or graphics.
- RequiredConstruction Drawings, Footing and Foundation PlanIncludes columns, posts, beams, framework, internal bracing, and other applicable construction information.
- RequiredElectrical InformationDisconnect location and size of overcurrent protection.
- OptionalEngineering (if required)Wet-stamped calculations with attachment schedule, required when the sign meets or exceeds specific size/weight/stand-off/height thresholds (see requirements).
- RequiredProof of Current Springville City Business LicenseRequired as part of the submittal.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee | Due in FULL at time of permit submission — contact office staff for the exact amount; no fixed published dollar figure. | Springville Sign Permit Checklist (2026): 'The plan check fee is due in full at time of permit submission. Contact office staff for amount.' Consistent with Springville's other building permit types (Residential, Commercial, Tenant Improvement), which are individually 'Assessed by Plans Examiner' per the FY2025 Comprehensive Fee Schedule (Exhibit B, Building Fees, lines 409-410) rather than a published valuation table. |
Change of Use Permit
VerifiedRequired when a unit or building's use changes from what it was previously used for — for example, converting a storage space to a print shop. Per Springville's Building FAQ: 'A Change of Use permit is to evaluate the building's space and use to make sure the building is meeting current code for the type of business being conducted inside... which also affects the occupancy load of that space, the ADA compliance requirements, and possible number of bathrooms and/or drinking fountains required.' This is also the mechanism a business must complete before occupying interior space in a shell building that has only received a Certificate of Completion for its exterior structure, since the shell permit's approved plan set never addressed interior occupant load or use. Springville does not publish a separate standalone 'Certificate of Occupancy Permit' product — 'C of O' is issued as the outcome of the underlying building/commercial permit's own final inspection (see the Final inspection step in this file's Residential and Commercial Building Permit entries), and the Change of Use Permit is the distinct product Springville uses specifically when a space's use changes without accompanying new construction.
Verified 2026-07-22 · Source
Requirements
- Required whenever a unit/building's use changes from its previous use (e.g., storage converted to a print shop), per Springville's Building FAQ and Business Licensing FAQ
- Required before a business may occupy interior space in a shell building that has received only a Certificate of Completion for its exterior structure — the shell permit's plan set does not address interior occupant load, exiting, or use
- Code Analysis from an Architectural Design Professional addressing occupant load, exiting, possible fire-resistive construction, number of restrooms, and ADA accessibility accommodations
- Floor plan showing any modifications planned for the space
- Application submitted via My City Inspector (springville.mycityinspector.com) after creating an account; 'change of use' selected as the Type of Permit
Required documents
- RequiredCode Analysis (Architectural Design Professional)Per Springville's Business Licensing FAQ: 'The most important information needed in this application is a Code Analysis from an Architectural Design Group.' Addresses occupant load, exiting, possible fire-resistive construction, number of restrooms, and ADA accessibility accommodations.
- RequiredFloor PlanShows any modifications planned for the space. Per Springville's Business Licensing FAQ, it 'can be hand drawn and does not have to be scale, but must include overall measurements, use of each room, and measurement of each room.'
- RequiredSketch of Existing Site PlanUploaded with the online application alongside the floor plan sketch, per Springville's Business Licensing FAQ instructions for starting a change-of-use application.
- RequiredMy City Inspector Account and ApplicationCreated via the 'Create an Account' button on the Building Division page, then submitted at springville.mycityinspector.com with 'change of use' selected as the Type of Permit.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Check Fee / Building Permit Fee | No change-of-use-specific dollar figure is published anywhere found. Springville's standard building-permit fee mechanism applies instead: Plan Check Fee and Building Permit Fee, both 'Assessed by Plans Examiner.' | No dedicated Change of Use fee line item, checklist PDF, or flat rate was located. A full-text sweep of the FY2026 Comprehensive Fee Schedule (springvilleutah.gov/wp-content/uploads/sites/6/2025/09/FY-2026-Comprehensive-Fee-Schedule.pdf, ~4,080 extracted lines) for 'change of use,' 'occupancy,' and 'certificate' returned zero matches for a distinct fee item — the schedule's Building Fees section (lines 409-414: Plan Check Fee, Building Permit Fee, Completion Bond, Performance Bond, Plan Review Deposit) lists only the same 'Assessed by Plans Examiner' mechanism used for Springville's other building-permit types in this file (Residential, Commercial, Sign, Tenant Improvement). Probing was also done for a dedicated 2026 Change-of-Use checklist PDF using the same URL pattern as Springville's other checklist documents (Commercial-Permit-Process-2026.pdf, Tenant-Improvement-Permit-Process-2026.pdf, Sign-Permit-Process-2026.pdf) — all four guessed filenames returned HTTP 404, confirming no standalone checklist/fee document exists for this permit type as of 2026-07-22. |
EV Charger / EVSE Permit
VerifiedSpringville does not publish a distinct EV-charger/EVSE fee category. Installing electric vehicle charging equipment (EVSE) is electrical work and falls under the city's standalone Electrical Permit — a separate trade permit applied for and paid by the electrical subcontractor, distinct from the building permit. This is confirmed directly by Springville's own electrical-permit entry, which explicitly states EV charger/EVSE installation falls under this standalone Electrical Permit and that the FY2025 Comprehensive Fee Schedule publishes no separate EV-specific line item. Springville's fee schedule also does not publish a distinct dollar figure for the electrical trade permit itself (only the Building Permit Fee and Plan Check Fee, both 'Assessed by Plans Examiner').
Verified 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- Electrical, Plumbing, or Mechanical Permits must be applied for and paid for separately by each Subcontractor, even on new residential building permits
- Governed by the 2023 NEC (Utah statewide) and 2021 IRC
Required documents
- RequiredTrade Permit ApplicationSubmitted via My City Inspector (springville.mycityinspector.com), separately from any building permit.
- OptionalElectrical PlansCircuit/panel documentation for the EVSE installation, particularly if a service upgrade is involved.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | No fixed dollar figure published for a standalone electrical permit was found in Springville's FY2025 Comprehensive Fee Schedule (Exhibit B, Building Fees, lines 395-414), which lists only 'Building Permit Fee' and 'Plan Check Fee,' both 'Assessed by Plans Examiner,' with no separate electrical or EV-specific line item. | Springville City FY2025 Comprehensive Fee Schedule confirms electrical work is billed as a separate trade permit but does not publish a specific flat rate or valuation table for it; omitting the dollar figure rather than estimating it, consistent with the city's own electrical-permit entry. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.