You are viewing the permanent link for the record currently in effect, published 2026-07-08.
Heber City building permits
VerifiedHeber City, Utah — as published 2026-07-08.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family residential construction in Heber City. The Building Permit fee is valuation-based, calculated from the Building Safety Journal fee tables published by the International Code Council (ICC) and updated biannually, per the city's current Consolidated Fee Schedule. A Plan Review fee of 25% of the building permit fee (minimum $60) also applies. Heber City's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — but no distinct EV charger/EVSE line item as of 2026-07-19; a standalone home charger installation would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general ICC-valuation-based Building Permit fee.
Verified 2026-07-07 · Source
Requirements
- New single-family residential construction
- Plans designed to and reflecting the currently adopted code family (2021 IRC/2024 IBC and related codes, effective July 1, 2026 per the city's Building and Safety Division page)
- Complete online application submitted via the MyCityInspector/Online Permit Portal (heber.mycityinspector.com)
- Fully dimensioned floor plans, building elevations, door/window schedules, stair/handrail/guard details, wall sections, roofing/drainage plans, and structural drawings (footing/foundation, wall construction, floor/roof framing, diaphragm connection details)
- Structural calculations sealed, signed, and dated by the engineer of record, using correct design criteria
- Soils report if required by the Building Official (northwest Heber City areas may have problem soils)
- Building energy analysis demonstrating IECC compliance (prescriptive design, or ResCheck and Manual J reports)
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)All residential building permit applications must be applied for, completed, and paid for through Heber City's Online Permit Portal at heber.mycityinspector.com, per the city's official Submitting Permit Requirements page.
- RequiredResidential Plan Submittal Requirements checklistOfficial Heber City checklist (Rev. 03/2022) covering site plans, building plans, electrical plans, mechanical plans, structural calculations, and building energy analysis documentation.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Heber City Consolidated Fee Schedule, § 4 Building: 'The Building Fee valuation figures, as listed in the Building Safety Journal published by the ICC (International Code Council) and updated on a biannual basis are hereby adopted to be included in the Heber City Consolidated Fee Schedule and are subject to update on a biannual basis on the tables and formulas of the ICC.' No flat city-published dollar table exists; the ICC table itself is the governing figure. |
| Plan Review Fee | 25% of building permit fee (residential); 40% of building permit fee (commercial); $60.00 minimum for all projects | Heber City Consolidated Fee Schedule, § 4 Building: 'Plan Review — 40% of building permit fee on Commercial; 25% of building permit fee on residential. Minimum for all projects — $60.00.' |
| Third Party Examination (expedited review, upon request) | 64% of building permit fee, or actual cost of review | Heber City Consolidated Fee Schedule, § 4 Building. |
| Double Fee Penalty (construction without prior Plan Review and Permit) | 2x standard Building Permit fee | Heber City Consolidated Fee Schedule, § 4 Building: 'Double fees for buildings or installation without Plan Review and Permit.' |
| Re-Inspection Fee | $60.00 | Heber City Consolidated Fee Schedule, § 4 Building. |
| County Impact Fee — Culinary Water (Residential, per ERU) | $4,199.00 | Heber City 2026 Impact Fee Summary (effective 1/1/2026), Consolidated Fee Schedule § 11 Impact Fees. |
| County Impact Fee — Sanitary Sewer (per ERU) | $1,562.00 (plus a separate $4,170.00 per ERU Heber Valley Special Service District sewer impact fee, collected by Heber City on the district's behalf) | Heber City 2026 Impact Fee Summary, § 11 Impact Fees: 'In addition to Heber City's impact fees, the City also collects a $4,170.00 per ERU sewer impact fee for the Heber Valley Special Service District.' |
| County Impact Fee — Streets (Single Family Dwelling Unit) | $5,640.00 | Heber City 2026 Impact Fee Summary, § 11 Impact Fees. |
| County Impact Fee — Pressurized Irrigation (Residential, per ERU) | $1,177.00 | Heber City 2026 Impact Fee Summary, § 11 Impact Fees. |
| County Impact Fee — Parks/Trails (Single Family Dwelling Unit) | $6,727.00 | Heber City 2026 Impact Fee Summary, § 11 Impact Fees. |
| County Impact Fee — Public Safety (Single Family Dwelling Unit) | $263.00 | Heber City 2026 Impact Fee Summary, § 11 Impact Fees. |
Residential Basement Finish / Remodel / Deck Permit
VerifiedRequired for finishing a basement, remodeling rooms, or building an attached/detached deck meeting the city's permit-trigger criteria in Heber City. Uses the same Plan Review fee structure (25% of building permit fee) and the same 2-week initial-review timeline as new construction, per the city's dedicated submittal checklist.
Verified 2026-07-07 · Source
Requirements
- Finished basements: fully dimensioned floor plans, identification of load-bearing walls, window/window-well dimensions for bedrooms (escape ladder required if window well exceeds 44" measured to top of well from sill), smoke/CO alarm layout wired in series across all levels, electrical outlet layout and panel location, plumbing fixture locations
- Room remodels: before/after floor plans, bedroom window size and sill heights if affected, smoke/CO alarm upgrades to all bedrooms and each floor where attics/crawl space/unfinished basements exist (required even if the remodel doesn't touch those spaces)
- Decks (attached, supported by dwelling): permit required if floor area exceeds 70 sq ft, any horizontal dimension exceeds 7 ft, stairs to grade have 4+ risers, deck surface is over 30 inches above grade, or deck is roofed/has a pergola; footings must extend below the 36" frost level
- Decks (detached, not supported by dwelling): permit required if area exceeds 200 sq ft or stairs to grade have 4+ risers; engineering required if roofed, has a pergola, and/or is over 30" above grade; decks over 600 sq ft must be engineered
- Decks that are self-supporting, under 200 sq ft, and low to the ground (beam/joist underside less than 12" from grade, using preservative-treated lumber) are NOT required to be permitted
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Submitted via heber.mycityinspector.com, per the city's official Submitting Permit Requirements page.
- RequiredResidential Basement Finish - Remodels - Deck Submittal Requirements checklistOfficial Heber City checklist (Rev. 12/2018) covering finished-basement, room-remodel, and deck-specific plan requirements.
- OptionalDeck Permit Requirement ChecklistOfficial Heber City handout detailing when a deck permit is required, ledger/joist/guard/stair specifications, and footing depth requirements.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Fee (Decks and Basements) | 25% of building permit fee | Heber City Consolidated Fee Schedule, § 4 Building: 'Plan Review (Decks and Basements) — 25% of building permit fee.' |
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Same ICC-referenced valuation structure applies as for new residential construction, per the Consolidated Fee Schedule § 4 Building. |
| Re-Inspection Fee | $60.00 | Heber City Consolidated Fee Schedule, § 4 Building. |
Detached Garage / Accessory Structure Permit
VerifiedRequired for detached garages and other detached accessory structures in Heber City. The Consolidated Fee Schedule splits the Plan Review fee into two tiers by size (under vs. over 1,000 sq ft), both currently set at the same 25%-of-building-permit-fee rate.
Verified 2026-07-07 · Source
Requirements
- Detached garage or accessory structure construction
- Complete online application via the Online Permit Portal (heber.mycityinspector.com)
- Plans meeting the currently adopted code family (2021 IRC/2024 IBC and related codes)
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Submitted via heber.mycityinspector.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Fee (Detached Garage/Buildings under 1,000 square feet) | 25% of building permit fee | Heber City Consolidated Fee Schedule, § 4 Building: 'Plan Review (Detached Garage/Buildings under 1,000 square feet) — 25% of building permit fee.' |
| Plan Review Fee (Detached Garage/Buildings over 1,000 square feet) | 25% of building permit fee | Heber City Consolidated Fee Schedule, § 4 Building: 'Plan Review (Detached Garage/Buildings over 1,000 square feet) — 25% of building permit fee.' Listed as a distinct line item from the under-1,000-sq-ft tier in the fee schedule even though the current published rate is identical. |
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Same ICC-referenced valuation structure applies, per the Consolidated Fee Schedule § 4 Building. |
Solar Panel (PV) Permit
VerifiedRequired for solar panel installations in Heber City. Solar permits follow a distinct multi-party review process: applications are submitted via MyCityInspector, then reviewed by WC-3 (under a WC-3 Plan Review Agreement) and Heber Light & Power before Heber City issues the permit, per the city's official Solar Panel Submittal Requirements and Directions handout.
Verified 2026-07-20 · Source
Requirements
- Solar panel/PV installation
- Complete online application with plans and support documents (e.g. WC-3 Agreement) submitted as PDFs via heber.mycityinspector.com
- Application must go through Heber City first — applicants must NOT send plans directly to WC3
- Heber Light and Power approval required; a copy of that approval must be provided back to the city
- WC3 conducts required inspections directly (scheduled by calling 801-547-8133) once a Heber City permit number has been issued — inspections cannot be scheduled with WC3 before that
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Submitted via heber.mycityinspector.com along with plans and the WC-3 Solar Plan Review Agreement.
- RequiredWC-3 Solar Plan Review Agreement (Heber City Updated)Required supporting document for WC3's review of the solar plans, per the city's official Solar Panel Submittal Requirements and Directions handout.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | The city's Solar Panel Submittal Requirements and Directions handout does not itemize a distinct solar-specific fee; it states only that 'it will then be your responsibility to pay the Heber City permit fee' once WC3 and Heber Light & Power approvals are received, referring to the same ICC-valuation-based Building Permit fee structure as other permit types under the Consolidated Fee Schedule § 4 Building. Payment must be made in person, not by phone. |
| WC-3 Solar Plan Review Fee (standard) | $225.00 | Per Heber City's official WC-3 Solar Plan Review Agreement (Heber City Updated): 'The electrical plan review for this project will be performed for a lump sum fee of $225.00... This considers a standard plan review turn-around of ten (10) business days.' Billed and paid directly to West Coast Code Consultants, Inc. (WC3), separately from the Heber City building permit fee. |
| WC-3 Solar Plan Review Fee (expedited) | $337.50 | Per the same WC-3 Agreement: expedited review is billed at '150% of the standard review fee' ($337.50 lump sum) and 'will be completed within five (5) business days of receiving the construction documents,' if the applicant checks the expedited-review box on the agreement. |
Accessory Dwelling Unit (ADU) Notice / Registration
Required recorded notice for properties containing an Accessory Dwelling Unit (governed under Heber City's Accessory Apartment municipal code) in addition to the building permit for the ADU's construction. The property owner must sign a notarized notice acknowledging land-use compliance conditions, per the city's official Accessory Dwelling Unit Notice form.
Reviewed 2026-07-07 · Source
Requirements
- Proper building permits must be obtained for the ADU construction itself
- Owner must occupy either the main dwelling or the ADU
- No more than one ADU per property
- At least one additional off-street parking space for the ADU (3 total parking spaces on the property)
- All utilities (electric, sewer, gas, water) for both the home and ADU must be in the owner's name
- Landscaping requirements of Heber City Code Ch. 18.76.020 met, including street trees per Ch. 12.20
- External ADUs must be less than 1,500 square feet
- A kitchen and sanitation facility must be provided to the ADU
- An annual business license must be maintained for the ADU if it is rented
- Notice must be signed by the owner and notarized in Wasatch County (or wherever executed) before recording
Required documents
- RequiredAccessory Dwelling Unit NoticeOfficial Heber City recorded notice form requiring property address, parcel number, legal description, and notarized owner signature acknowledging the ADU land-use compliance conditions.
- RequiredAccessory Apartment SeparationAdditional official Heber City document addressing physical separation requirements between the main dwelling and an accessory apartment/ADU.
Fee schedule
| Fee type | Amount | Notes |
|---|
Commercial Building Permit
VerifiedRequired for new commercial construction in Heber City. Applications must be approved by the City Planning Department and City Engineering Department before submittal to the Building Department, per the city's official Commercial Plan Submittal Requirements (Rev. 03/2022). The Building Permit fee is valuation-based per the ICC Building Safety Journal tables (same mechanism as residential), with a Plan Review fee of 40% of the building permit fee (versus 25% for residential).
Verified 2026-07-19 · Source
Requirements
- New commercial construction — must be approved by the City Planning Department and City Engineering Department before submittal to the Building Department
- Plans must have a code analysis summary to current code (building area, height/stories, construction type, sprinkler status, occupancy group(s), occupant loads, area increase calculations if needed, special inspection list)
- Fully dimensioned floor plans, building elevations, door/window/hardware schedules, stair/handrail/guard details, wall sections, roofing/drainage plans, and structural drawings (footing/foundation, wall construction, floor/roof framing, diaphragm connection details)
- Disabled access provisions including ramps, areas of refuge, restrooms, maneuvering clearances, and landings
- Electrical, mechanical, and structural plans sealed, signed, and dated by the engineer of record for complex designs
- Building energy analysis demonstrating compliance with the current adopted IECC
- A soils report may be required for some areas of the City with problem soils
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Applications, plans, and support documents submitted as PDFs via heber.mycityinspector.com, per the city's Commercial Plan Submittal Requirements.
- RequiredCommercial Plan Submittal Requirements checklistOfficial Heber City checklist (Rev. 03/2022) covering site plans, building plans, electrical plans, mechanical plans, structural calculations, material specifications, and building energy analysis.
- RequiredPlanning and Engineering Department ApprovalsAll commercial permit applications must be approved by the City Planning Department and City Engineering Department before submittal to the Building Department.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Heber City Consolidated Fee Schedule, § 4 Building — same ICC-referenced valuation mechanism as residential; no separate commercial valuation table is published, per the Consolidated Fee Schedule's own text ('The Building Fee valuation figures, as listed in the Building Safety Journal published by the ICC... are hereby adopted'). |
| Plan Review Fee | 40% of building permit fee (Commercial); $60.00 minimum for all projects | Heber City Consolidated Fee Schedule, § 4 Building: 'Plan Review — 40% of building permit fee on Commercial; 25% of building permit fee on residential.' The Commercial rate is higher than the 25% residential rate documented for this jurisdiction's residential-building-permit entry. |
| Third Party Examination (expedited review, upon request) | 64% of building permit fee, or actual cost of review | Heber City Consolidated Fee Schedule, § 4 Building — same mechanism applies to commercial as to residential. |
| Double Fee Penalty (construction without prior Plan Review and Permit) | 2x standard Building Permit fee | Heber City Consolidated Fee Schedule, § 4 Building. |
| Re-Inspection Fee | $60.00 | Heber City Consolidated Fee Schedule, § 4 Building. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for tenant improvement and remodel work inside an existing commercial building in Heber City, per the city's official Commercial Remodel and Tenant Finish Submittal Requirements (Rev. 12/2018). Remodeling of spaces over 3,000 sq ft requires a licensed Architect; projects with budgets over $3,000.00 require a general contractor. Uses the same 40%-of-building-permit-fee Commercial Plan Review rate and the same approximately 3-week initial-review timeline as new commercial construction.
Verified 2026-07-19 · Source
Requirements
- Tenant improvement or remodel work within an existing commercial building
- Remodeling of spaces over 3,000 sq ft requires a licensed Architect to do the design work
- Projects with budgets over $3,000.00 require a general contractor
- Floor plan showing what is there and what is changing (before and after)
- Restrooms shown even if not part of the remodel/tenant finish; changes in space occupancy may require restroom accessibility upgrades even if restrooms are not part of the scope
- Structural drawings with engineer's seal, signature, and date for all designs
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Submitted via heber.mycityinspector.com, per the city's Commercial Remodel and Tenant Finish Submittal Requirements.
- RequiredCommercial Remodel and Tenant Finish Submittal Requirements checklistOfficial Heber City checklist (Rev. 12/2018) covering building plans (floor plan before/after, fire partitions/barriers/walls, door/window schedules, restroom accessibility, floor elevation changes, stair/handrail/guard details, structural drawings), electrical plans, and mechanical plans.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Heber City Consolidated Fee Schedule, § 4 Building — same ICC-referenced valuation mechanism as new commercial construction; no distinct tenant-improvement-specific valuation table is published. |
| Plan Review Fee | 40% of building permit fee (Commercial); $60.00 minimum for all projects | Heber City Consolidated Fee Schedule, § 4 Building — the Commercial rate applies; the Consolidated Fee Schedule does not publish a separate, lower rate specific to tenant improvement/remodel work (unlike its distinct 25% 'Decks and Basements' residential line). |
| Re-Inspection Fee | $60.00 | Heber City Consolidated Fee Schedule, § 4 Building. |
Change of Location/Occupancy Business License
VerifiedRequired when an existing business changes its physical location within Heber City, or when a new business moves into an existing building or space without new construction — separate from a Business License Application for a brand-new business at a location that has never been licensed. Submitted online through the city's Civic Review portal. The application requires a Building/Space Evaluation, Fire Inspection Requirements review, and Health Department Requirements review, and specifically asks the applicant to describe both the new and previous use of the building or space.
Verified 2026-07-20 · Source
Requirements
- Applies to a business relocating within Heber City, or a new business/use occupying an existing building or space (no active building permit)
- Applicant must confirm review of Heber City Municipal Code Title 5 (Business Taxes, Licenses and Regulations) before starting the application
- Square footage of the building or space must be disclosed
- Applicant must describe the new use and the previous use of the building or space
- Previous business location address must be disclosed if relocating within the city
- Subject to Fire Inspection Requirements and Health Department Requirements review steps within the same application
Required documents
- RequiredChange of Location/Occupancy Business License application (Civic Review portal)Online multi-step application at app.civicreview.com covering Business Details, Business Owner Details, Building/Space Evaluation, Business Description, Fire Inspection Requirements, Health Department Requirements, Fees, Signature, and Review.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Business License Fee (by use category) | Varies by business/use category — see Heber City Consolidated Fee Schedule, Business License Fees section (e.g. Commercial License Processing Fee $51.50; Processing Fee $50.00; category-specific fees such as Restaurants $349.50, General Services $66.75, Automotive Service and Repair $128.50) | Heber City Consolidated Fee Schedule, Ordinance 2025-15 (effective 8/1/2025), Business License Fees section, p.8-9. The fee schedule does not publish a separate line item specific to a 'change of location/occupancy' filing — the application is a business license filing and is billed under the same category-based Business License Fees table as any other business license. |
Sign Permit
VerifiedRequired to erect, install, or paint most signs (or change a sign face) in Heber City under City Code Chapter 18.103 (Signs), § 18.103.110. The permit is issued by the Community Development Department. The Consolidated Fee Schedule (FY2025-2026, Ordinance 2025-15) sets the Sign application fee at $78.00.
Verified 2026-07-20 · Source
Requirements
- No person may erect, install, or paint any sign, or change the face of any sign — temporary or permanent — without a sign permit from the Community Development Department, except as specifically exempted; this includes new signs, signs added to existing buildings/uses, and existing signs being enlarged, changed, or modified (City Code § 18.103.110)
- Monument and freestanding signs, and wall/attached signs, each have their own required submittal package (see documents below); temporary signs require a plot plan and a stated display period (§ 18.103.130)
- A wide list of signs never needs a permit at all — directional/instructional signs (≤4 sq ft, ≤4 ft height), no trespassing/no dumping signs, small plaques (≤2 sq ft), religious/historical symbols (≤8 sq ft), one 32-sq-ft institutional monument sign for churches/schools/government buildings, small flags, public necessity signs, memorial plaques, and notice bulletin boards (≤32 sq ft) among others (§ 18.103.080)
- Grand opening temporary signs (max 2 per business, ≤60 days, permit must issue within the business's first year of operation) still require a temporary sign permit despite being time-limited (§ 18.103.100)
- Roof signs, snipe signs, wind signs, animated/flashing/rotating signs, and off-premise temporary signs (other than real estate signage) are prohibited outright in every zone; electronic message centers are barred from residential zones entirely (§ 18.103.070)
Required documents
- RequiredSign Permit ApplicationFiled with the Community Development Department (City Code § 18.103.110)
- RequiredPlot Plan (Monument/Freestanding Signs)Shows the sign's relationship to buildings, property lines, setback from public rights-of-way, intersections, easements, and driveways
- RequiredScaled Elevation Drawings (Monument/Freestanding Signs)Two accurately dimensioned drawings showing height, color, square-foot dimensions, landscaping, sign composition, illumination type, and street-view appearance, plus construction details (electrical plan, foundation scheme, and sign value)
- RequiredScaled Drawings (Wall Signs)Two scaled drawings showing the square-foot dimensions of both the building and the sign, sign composition, illumination type, a street/parking-area profile view, and construction/attachment details including the electrical plan
- RequiredBusiness License ProofProof of a current Heber City business license, plus business address and phone number (§ 18.103.130)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit — Planning Fees Schedule | $78.00 | Heber City Consolidated Fee Schedule, FY2025-2026 (Exhibit A, Ordinance 2025-15, effective 8/1/2025), Planning Fees table, line item 'Sign' — Administrative Fee $78.00, no escrow. Read directly from the scanned PDF page (image-based; no text layer) fetched 2026-07-20; unchanged from the prior FY2023-2024 schedule, which listed the same $78.00 figure. |
| Unpermitted Sign Penalty | $100.00, or double the sign permit fee, whichever is greater | City Code § 18.103.110: 'New or existing signs installed or maintained without a permit will be required to be removed or will be charged a penalty fee of $100, or a double sign permit fee, whichever is greater, at the time the owner/operator of the sign makes application for a sign permit.' |
EV Charger / EVSE Permit
Heber City does not publish a distinct EV-charger/EVSE permit or fee line item. The city's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — and prices new-construction building permits on the ICC Building Safety Journal valuation table. A standalone EV charger installation not tied to new construction would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general valuation-based Building Permit fee, but no source explicitly names EV chargers, so this is not asserted as certain.
Reviewed 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Heber City
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Building permit application submitted through Heber City's online permit portal
Required documents
- RequiredBuilding Permit ApplicationSubmitted through Heber City's online web portal per the Building and Safety Division's standard process; no dedicated EV-charger application form is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Other (Electrical, Building, Mechanical, and Plumbing) Inspection | $60.00 | Heber City Consolidated Fee Schedule, Ordinance 2025-15, Exhibit A, Building Fees table. Not explicitly named for EV chargers, but the closest published standalone-electrical-inspection fee category; a standalone charger install not tied to new construction would most likely be billed here. |
| Building Permit Fee (new construction) | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Heber City Consolidated Fee Schedule, § 4 Building. Applies if the EV charger is installed as part of new construction rather than as a standalone retrofit. |
Fire Sprinkler System Permit
VerifiedHeber City does not publish a distinct fire sprinkler system permit or fee line item — a direct text search of the current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' on 2026-07-21 returned only an unrelated Police Section 'Third False Alarm' ($50.00) fee, no Building-fee sprinkler line item. Sprinkler plans (for new construction or tenant improvement) are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set filed with Heber City — those permit types' own code-analysis-summary requirement explicitly calls for disclosing 'sprinkler status.' Fire protection and fire-code plan review for Heber City is provided by Wasatch Fire District (WFD), a separate agency, whose own Exhibit 'A' District Fee Schedule (Resolution 22-04) bills sprinkler review through its general valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) or its flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee, rather than a standalone sprinkler-specific charge.
Verified 2026-07-21 · Source
Requirements
- Installation, modification, or extension of an automatic fire sprinkler system in a building within Heber City
- Reviewed by Wasatch Fire District (WFD) as part of the same plan set submitted for the underlying Commercial Building Permit or Commercial Tenant Improvement Permit — no separate fire-sprinkler-only application form is published by either Heber City or WFD
- Commercial Building Permit and Commercial Tenant Improvement Permit code-analysis summaries must disclose 'sprinkler status,' per Heber City's own Commercial Plan Submittal Requirements checklist
- Sprinkler systems must comply with the 2024 International Fire Code (adopted by Heber City, effective July 1, 2026) and applicable NFPA installation standards
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Fire sprinkler shop drawings/plans are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit application via heber.mycityinspector.com; no separate WFD-specific sprinkler application form is published on wasatchcountyfire.com's permit pages (checked wfd-permits2 and wfd-permits21, 2026-07-21).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| WFD Inspection and Plan Review — Commercial | Valuation x 0.00075 | Wasatch Fire District Exhibit 'A' District Fee Schedule (Resolution 22-04), 'Inspection and Plan Review Fees' table: 'Inspection and Plan Review – Commercial: Valuation x 0.00075.' Read directly from the fee schedule PDF (cdn.sqhk.co/wasatchfd/SNhghjJ/Resolution22-04ExhibitAFeeSchedule) on 2026-07-21. No separate fire-sprinkler-specific line item exists in either the Heber City or WFD fee schedules; this valuation-based fee is the governing charge covering fire-code plan review, including sprinkler system plans, as part of the broader commercial plan set. |
| WFD Inspection and Plan Review — Residential (in WUI) | Valuation x 0.00075 | Same WFD Exhibit 'A' Fee Schedule; applies to residential fire-sprinkler-bearing projects located within the Wildland Urban Interface (WUI). |
| WFD Inspection and Plan Review — Residential (non-WUI) | Valuation x 0.0003 | Same WFD Exhibit 'A' Fee Schedule; applies to residential projects outside the WUI — a lower rate than the Commercial/WUI-Residential tier. |
| WFD Non-Structural Fire & Life Safety / Project Clearance Plan Review | $225.00 flat | Same WFD Exhibit 'A' Fee Schedule, 'Inspection and Plan Review Fees' table: 'Non-Structural Fire & Life Safety/Project Clearance Plan Reviews: $225.' Most likely the applicable WFD fee for a standalone sprinkler retrofit not tied to new construction or a valuation-based building permit, though WFD's fee schedule does not explicitly name sprinkler systems under this line item — reported as the closest-fitting published category rather than asserted as certain. |
| Heber City Building Permit Fee (if bundled with new construction/TI) | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Applies on the Heber City side when the sprinkler system is installed as part of new commercial construction or a tenant improvement project, per the Consolidated Fee Schedule § 4 Building; the sprinkler work itself carries no separate city-side fee line item. |
Fire Alarm and Detection System Permit
VerifiedHeber City does not publish a distinct fire alarm/detection system permit or fee line item — a direct text search of the current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' on 2026-07-21 returned only an unrelated Police Section 'Third False Alarm' ($50.00) fee, no Building-fee fire-alarm line item. Fire alarm system plans (for new construction or tenant improvement) are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set filed with Heber City. Fire protection and fire-code plan review for Heber City is provided by Wasatch Fire District (WFD), a separate agency, whose own Exhibit 'A' District Fee Schedule (Resolution 22-04) bills fire alarm plan review through its general valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) or its flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee, rather than a standalone fire-alarm-specific charge.
Verified 2026-07-21 · Source
Requirements
- Installation, modification, or extension of a fire alarm and detection system (or related equipment) in a building within Heber City
- Reviewed by Wasatch Fire District (WFD) as part of the same plan set submitted for the underlying Commercial Building Permit or Commercial Tenant Improvement Permit — no separate fire-alarm-only application form is published by either Heber City or WFD
- Fire alarm systems must comply with the 2024 International Fire Code (adopted by Heber City, effective July 1, 2026) and applicable NFPA installation standards
Required documents
- RequiredOnline Building Permit Application (MyCityInspector / Online Permit Portal)Fire alarm system plans are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit application via heber.mycityinspector.com; no separate WFD-specific fire alarm application form is published on wasatchcountyfire.com's permit pages (checked wfd-permits2 and wfd-permits21, 2026-07-21).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| WFD Inspection and Plan Review — Commercial | Valuation x 0.00075 | Wasatch Fire District Exhibit 'A' District Fee Schedule (Resolution 22-04), 'Inspection and Plan Review Fees' table: 'Inspection and Plan Review – Commercial: Valuation x 0.00075.' Read directly from the fee schedule PDF (cdn.sqhk.co/wasatchfd/SNhghjJ/Resolution22-04ExhibitAFeeSchedule) on 2026-07-21. No separate fire-alarm-specific line item exists in either the Heber City or WFD fee schedules; this valuation-based fee is the governing charge covering fire-code plan review, including fire alarm system plans, as part of the broader commercial plan set. |
| WFD Inspection and Plan Review — Residential (in WUI) | Valuation x 0.00075 | Same WFD Exhibit 'A' Fee Schedule; applies to residential fire-alarm-bearing projects located within the Wildland Urban Interface (WUI). |
| WFD Inspection and Plan Review — Residential (non-WUI) | Valuation x 0.0003 | Same WFD Exhibit 'A' Fee Schedule; applies to residential projects outside the WUI — a lower rate than the Commercial/WUI-Residential tier. |
| WFD Non-Structural Fire & Life Safety / Project Clearance Plan Review | $225.00 flat | Same WFD Exhibit 'A' Fee Schedule, 'Inspection and Plan Review Fees' table: 'Non-Structural Fire & Life Safety/Project Clearance Plan Reviews: $225.' Most likely the applicable WFD fee for a standalone fire alarm retrofit not tied to new construction or a valuation-based building permit, though WFD's fee schedule does not explicitly name fire alarm systems under this line item — reported as the closest-fitting published category rather than asserted as certain. |
| Heber City Building Permit Fee (if bundled with new construction/TI) | Valuation-based per the ICC Building Safety Journal fee tables, updated biannually | Applies on the Heber City side when the fire alarm system is installed as part of new commercial construction or a tenant improvement project, per the Consolidated Fee Schedule § 4 Building; the fire alarm work itself carries no separate city-side fee line item. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heber City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.