Skip to main content
PermitBase

Heber City building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Heber City, Utah.

Last verified 2026-07-07 · Source · Embed this page’s badge · Version history

Building department

Address
75 N Main Street, Heber City, UT 84032
Phone
(435) 654-6330
Office hours
Monday–Thursday 7:30 a.m.–6:00 p.m.; Inspection Hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page. Heber City Hall is closed Fridays (4/10 workweek).

Inspection guide

See how inspections work in Heber City — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — adopted, effective July 1, 2026 through July 1, 2029, per Heber City's official Building and Safety Division page.
  • 2021 International Residential Code (IRC), including Appendix AQ — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Plumbing Code (IPC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Mechanical Code (IMC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Fuel Gas Code (IFGC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Energy Conservation Code (IECC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Existing Building Code (IEBC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2021 International Swimming Pool and Spa Code (ISPSC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • 2024 International Fire Code (IFC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
  • NOTE: Heber City's own Residential Plan Submittal Requirements handout (heberut.gov/DocumentCenter/View/122, Rev. 03/2022) and Residential Basement Finish/Remodel/Deck Submittal Requirements handout (heberut.gov/DocumentCenter/View/123, Rev. 12/2018) still instruct applicants to design plans to the '2015 IRC' — these are older submittal-checklist documents that have not been revised to reflect the current adopted-code table published on the city's own Building and Safety Division page (2021 IRC/2024 IBC family effective July 1, 2026). Reported verbatim from each official source rather than silently reconciled; applicants should confirm the governing edition with the Building Department directly given this discrepancy between the city's own documents.
  • Current Utah State Amendments apply per Utah Code Title 15A, Chapter 3, referenced directly from the city's own Building and Safety Division page.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
19units

19 buildings · $7.5M valuation

Trailing 12 months
610units

12 of 12 months reported · #16 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
134units

133 buildings · $50.2M valuation

5 month(s) reported to Census

Full year 2025
602units

290 buildings · $185.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Heber City's Building and Safety Division is open Monday–Thursday, 7:30 a.m.–6:00 p.m. (closed Fridays, on a 4/10 workweek); inspections are conducted Monday–Thursday, 7:30 a.m.–4:30 p.m.
  • UNLIKE Highland City and unincorporated Wasatch County (both documented elsewhere in this corpus), Heber City does NOT require a permit for a residential fence at all, per the city's own official FAQ — do not assume a fence permit type exists here.
  • Heber City pegs its Building Permit fee directly to the ICC's own Building Safety Journal valuation tables (updated every two years), the same approach used by Highland City, rather than publishing a flat self-contained dollar table.
  • Plan Review fee is a flat 25% of the building permit fee for ALL residential permit types in this file (new construction, basement/remodel/deck, and detached garage under/over 1,000 sq ft) — with a $60 minimum — per the city's current Consolidated Fee Schedule, § 4 Building. Commercial Plan Review is 40% instead of 25%.
  • Building or installing without first completing Plan Review and obtaining a permit DOUBLES the standard fee, per the same fee schedule section — a meaningful deterrent against starting work before permit issuance.
  • The city's own Residential Plan Submittal Requirements handout (Rev. 03/2022) and Basement Finish/Remodel/Deck handout (Rev. 12/2018) still reference the older '2015 IRC' in their text, even though the Building and Safety Division's own current codes-adopted table lists the 2021 IRC and 2024 IBC family (effective July 1, 2026–July 1, 2029) — flagged verbatim rather than silently reconciled; these submittal-requirement PDFs appear not to have been revised to match the current adopted-code table.
  • The same official handouts are the ONLY source found for a plan-review turnaround time: 'The initial review process can take 2 weeks to complete based on work load at the time of being submitted.' This 2-week figure is explicitly for the INITIAL review pass only (first come, first served), not a guarantee of total time to permit issuance once correction cycles are included.
  • Solar permits require a three-party sequence (Heber City → WC3 and Heber Light & Power → back to Heber City for permit issuance and payment in person) — applicants must never send plans directly to WC3, and WC3 will not schedule inspections until a Heber City permit number exists.
  • County Impact Fees (Culinary Water, Sanitary Sewer plus a separate Heber Valley SSD sewer impact fee, Streets, Pressurized Irrigation, Parks/Trails, and Public Safety) apply in addition to the city's own Building Permit and Plan Review fees, and are adjusted every January 1st based on the ENR 20-City Construction Cost Index.
  • ADUs are legally termed 'Accessory Apartments' in Heber City's own municipal code and FAQ — a recorded, notarized ADU Notice is required in addition to the building permit for the ADU's construction itself; no distinct ADU application fee was found published anywhere in the current Consolidated Fee Schedule.
  • Heber City's Consolidated Fee Schedule is hosted on a JavaScript-rendered municipal code platform (heber.municipalcodeonline.com) that does not serve its content to standard page-fetch tools; the fee data in this file was extracted from that platform's browser 'print preview' endpoint (book/print?type=fees), which does render server-side and was cross-checked as the same governing document referenced from the city's own Fee-Schedule page (heberut.gov/272/Fee-Schedule, which redirects to the municipal code site).

Comparable nearby cities

Park City
9 shared permit types~10 mi away
Compare fees →
Unincorporated Wasatch County
Both in Wasatch County7 shared permit types
Compare fees →
Alpine
9 shared permit types~21 mi away
Compare fees →