Heber City building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Heber City, Utah.
Last verified 2026-07-07 · Source · Embed this page’s badge · Version history
Building department
- Address
- 75 N Main Street, Heber City, UT 84032
- Phone
- (435) 654-6330
- Office hours
- Monday–Thursday 7:30 a.m.–6:00 p.m.; Inspection Hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page. Heber City Hall is closed Fridays (4/10 workweek).
- Website
- Official site
- Permit portal
- Apply online at Heber City's portal
Inspection guide
See how inspections work in Heber City — sequence, scheduling & re-inspection fees.
Codes adopted
Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.
- 2024 International Building Code (IBC), including Appendices C and J — adopted, effective July 1, 2026 through July 1, 2029, per Heber City's official Building and Safety Division page.
- 2021 International Residential Code (IRC), including Appendix AQ — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Plumbing Code (IPC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Mechanical Code (IMC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Fuel Gas Code (IFGC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Energy Conservation Code (IECC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Existing Building Code (IEBC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2021 International Swimming Pool and Spa Code (ISPSC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- 2024 International Fire Code (IFC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.
- NOTE: Heber City's own Residential Plan Submittal Requirements handout (heberut.gov/DocumentCenter/View/122, Rev. 03/2022) and Residential Basement Finish/Remodel/Deck Submittal Requirements handout (heberut.gov/DocumentCenter/View/123, Rev. 12/2018) still instruct applicants to design plans to the '2015 IRC' — these are older submittal-checklist documents that have not been revised to reflect the current adopted-code table published on the city's own Building and Safety Division page (2021 IRC/2024 IBC family effective July 1, 2026). Reported verbatim from each official source rather than silently reconciled; applicants should confirm the governing edition with the Building Department directly given this discrepancy between the city's own documents.
- Current Utah State Amendments apply per Utah Code Title 15A, Chapter 3, referenced directly from the city's own Building and Safety Division page.
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family residential construction in Heber City. The Building Permit fee is valuation-based, calculated from the Building Safety Journal fee tables published by the International Code Council (ICC) and updated biannually, per the city's current Consolidated Fee Schedule. A Plan Review fee of 25% of the building permit fee (minimum $60) also applies. Heber City's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — but no distinct EV charger/EVSE line item as of 2026-07-19; a standalone home charger installation would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general ICC-valuation-based Building Permit fee.
Residential Basement Finish / Remodel / Deck Permit
Required for finishing a basement, remodeling rooms, or building an attached/detached deck meeting the city's permit-trigger criteria in Heber City. Uses the same Plan Review fee structure (25% of building permit fee) and the same 2-week initial-review timeline as new construction, per the city's dedicated submittal checklist.
Detached Garage / Accessory Structure Permit
Required for detached garages and other detached accessory structures in Heber City. The Consolidated Fee Schedule splits the Plan Review fee into two tiers by size (under vs. over 1,000 sq ft), both currently set at the same 25%-of-building-permit-fee rate.
Solar Panel (PV) Permit
Required for solar panel installations in Heber City. Solar permits follow a distinct multi-party review process: applications are submitted via MyCityInspector, then reviewed by WC-3 (under a WC-3 Plan Review Agreement) and Heber Light & Power before Heber City issues the permit, per the city's official Solar Panel Submittal Requirements and Directions handout.
Accessory Dwelling Unit (ADU) Notice / Registration
Required recorded notice for properties containing an Accessory Dwelling Unit (governed under Heber City's Accessory Apartment municipal code) in addition to the building permit for the ADU's construction. The property owner must sign a notarized notice acknowledging land-use compliance conditions, per the city's official Accessory Dwelling Unit Notice form.
Commercial Building Permit
Required for new commercial construction in Heber City. Applications must be approved by the City Planning Department and City Engineering Department before submittal to the Building Department, per the city's official Commercial Plan Submittal Requirements (Rev. 03/2022). The Building Permit fee is valuation-based per the ICC Building Safety Journal tables (same mechanism as residential), with a Plan Review fee of 40% of the building permit fee (versus 25% for residential).
Commercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and remodel work inside an existing commercial building in Heber City, per the city's official Commercial Remodel and Tenant Finish Submittal Requirements (Rev. 12/2018). Remodeling of spaces over 3,000 sq ft requires a licensed Architect; projects with budgets over $3,000.00 require a general contractor. Uses the same 40%-of-building-permit-fee Commercial Plan Review rate and the same approximately 3-week initial-review timeline as new commercial construction.
Change of Location/Occupancy Business License
Required when an existing business changes its physical location within Heber City, or when a new business moves into an existing building or space without new construction — separate from a Business License Application for a brand-new business at a location that has never been licensed. Submitted online through the city's Civic Review portal. The application requires a Building/Space Evaluation, Fire Inspection Requirements review, and Health Department Requirements review, and specifically asks the applicant to describe both the new and previous use of the building or space.
Sign Permit
Required to erect, install, or paint most signs (or change a sign face) in Heber City under City Code Chapter 18.103 (Signs), § 18.103.110. The permit is issued by the Community Development Department. The Consolidated Fee Schedule (FY2025-2026, Ordinance 2025-15) sets the Sign application fee at $78.00.
EV Charger / EVSE Permit
Heber City does not publish a distinct EV-charger/EVSE permit or fee line item. The city's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — and prices new-construction building permits on the ICC Building Safety Journal valuation table. A standalone EV charger installation not tied to new construction would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general valuation-based Building Permit fee, but no source explicitly names EV chargers, so this is not asserted as certain.
Fire Sprinkler System Permit
Heber City does not publish a distinct fire sprinkler system permit or fee line item — a direct text search of the current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' on 2026-07-21 returned only an unrelated Police Section 'Third False Alarm' ($50.00) fee, no Building-fee sprinkler line item. Sprinkler plans (for new construction or tenant improvement) are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set filed with Heber City — those permit types' own code-analysis-summary requirement explicitly calls for disclosing 'sprinkler status.' Fire protection and fire-code plan review for Heber City is provided by Wasatch Fire District (WFD), a separate agency, whose own Exhibit 'A' District Fee Schedule (Resolution 22-04) bills sprinkler review through its general valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) or its flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee, rather than a standalone sprinkler-specific charge.
Fire Alarm and Detection System Permit
Heber City does not publish a distinct fire alarm/detection system permit or fee line item — a direct text search of the current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' on 2026-07-21 returned only an unrelated Police Section 'Third False Alarm' ($50.00) fee, no Building-fee fire-alarm line item. Fire alarm system plans (for new construction or tenant improvement) are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set filed with Heber City. Fire protection and fire-code plan review for Heber City is provided by Wasatch Fire District (WFD), a separate agency, whose own Exhibit 'A' District Fee Schedule (Resolution 22-04) bills fire alarm plan review through its general valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) or its flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee, rather than a standalone fire-alarm-specific charge.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 19units
19 buildings · $7.5M valuation
- Trailing 12 months
- 610units
12 of 12 months reported · #16 in Utah coverage by units
- Year to date (2026 YTD through 2026-05)
- 134units
133 buildings · $50.2M valuation
5 month(s) reported to Census
- Full year 2025
- 602units
290 buildings · $185.2M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity
Tips & gotchas
- Heber City's Building and Safety Division is open Monday–Thursday, 7:30 a.m.–6:00 p.m. (closed Fridays, on a 4/10 workweek); inspections are conducted Monday–Thursday, 7:30 a.m.–4:30 p.m.
- UNLIKE Highland City and unincorporated Wasatch County (both documented elsewhere in this corpus), Heber City does NOT require a permit for a residential fence at all, per the city's own official FAQ — do not assume a fence permit type exists here.
- Heber City pegs its Building Permit fee directly to the ICC's own Building Safety Journal valuation tables (updated every two years), the same approach used by Highland City, rather than publishing a flat self-contained dollar table.
- Plan Review fee is a flat 25% of the building permit fee for ALL residential permit types in this file (new construction, basement/remodel/deck, and detached garage under/over 1,000 sq ft) — with a $60 minimum — per the city's current Consolidated Fee Schedule, § 4 Building. Commercial Plan Review is 40% instead of 25%.
- Building or installing without first completing Plan Review and obtaining a permit DOUBLES the standard fee, per the same fee schedule section — a meaningful deterrent against starting work before permit issuance.
- The city's own Residential Plan Submittal Requirements handout (Rev. 03/2022) and Basement Finish/Remodel/Deck handout (Rev. 12/2018) still reference the older '2015 IRC' in their text, even though the Building and Safety Division's own current codes-adopted table lists the 2021 IRC and 2024 IBC family (effective July 1, 2026–July 1, 2029) — flagged verbatim rather than silently reconciled; these submittal-requirement PDFs appear not to have been revised to match the current adopted-code table.
- The same official handouts are the ONLY source found for a plan-review turnaround time: 'The initial review process can take 2 weeks to complete based on work load at the time of being submitted.' This 2-week figure is explicitly for the INITIAL review pass only (first come, first served), not a guarantee of total time to permit issuance once correction cycles are included.
- Solar permits require a three-party sequence (Heber City → WC3 and Heber Light & Power → back to Heber City for permit issuance and payment in person) — applicants must never send plans directly to WC3, and WC3 will not schedule inspections until a Heber City permit number exists.
- County Impact Fees (Culinary Water, Sanitary Sewer plus a separate Heber Valley SSD sewer impact fee, Streets, Pressurized Irrigation, Parks/Trails, and Public Safety) apply in addition to the city's own Building Permit and Plan Review fees, and are adjusted every January 1st based on the ENR 20-City Construction Cost Index.
- ADUs are legally termed 'Accessory Apartments' in Heber City's own municipal code and FAQ — a recorded, notarized ADU Notice is required in addition to the building permit for the ADU's construction itself; no distinct ADU application fee was found published anywhere in the current Consolidated Fee Schedule.
- Heber City's Consolidated Fee Schedule is hosted on a JavaScript-rendered municipal code platform (heber.municipalcodeonline.com) that does not serve its content to standard page-fetch tools; the fee data in this file was extracted from that platform's browser 'print preview' endpoint (book/print?type=fees), which does render server-side and was cross-checked as the same governing document referenced from the city's own Fee-Schedule page (heberut.gov/272/Fee-Schedule, which redirects to the municipal code site).