Required for new single-family residential construction in Heber City. The Building Permit fee is valuation-based, calculated from the Building Safety Journal fee tables published by the International Code Council (ICC) and updated biannually, per the city's current Consolidated Fee Schedule. A Plan Review fee of 25% of the building permit fee (minimum $60) also applies. Heber City's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — but no distinct EV charger/EVSE line item as of 2026-07-19; a standalone home charger installation would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general ICC-valuation-based Building Permit fee.

Verified 2026-07-07 · Source

When you need this permit

  • New single-family residential construction
  • Plans designed to and reflecting the currently adopted code family (2021 IRC/2024 IBC and related codes, effective July 1, 2026 per the city's Building and Safety Division page)
  • Complete online application submitted via the MyCityInspector/Online Permit Portal (heber.mycityinspector.com)
  • Fully dimensioned floor plans, building elevations, door/window schedules, stair/handrail/guard details, wall sections, roofing/drainage plans, and structural drawings (footing/foundation, wall construction, floor/roof framing, diaphragm connection details)
  • Structural calculations sealed, signed, and dated by the engineer of record, using correct design criteria
  • Soils report if required by the Building Official (northwest Heber City areas may have problem soils)
  • Building energy analysis demonstrating IECC compliance (prescriptive design, or ResCheck and Manual J reports)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeHeber City Consolidated Fee Schedule, § 4 Building: 'The Building Fee valuation figures, as listed in the Building Safety Journal published by the ICC (International Code Council) and updated on a biannual basis are hereby adopted to be included in the Heber City Consolidated Fee Schedule and are subject to update on a biannual basis on the tables and formulas of the ICC.' No flat city-published dollar table exists; the ICC table itself is the governing figure.
Valuation-based per the ICC Building Safety Journal fee tables, updated biannually
Plan Review FeeHeber City Consolidated Fee Schedule, § 4 Building: 'Plan Review — 40% of building permit fee on Commercial; 25% of building permit fee on residential. Minimum for all projects — $60.00.'
25% of building permit fee (residential); 40% of building permit fee (commercial); $60.00 minimum for all projects
Third Party Examination (expedited review, upon request)Heber City Consolidated Fee Schedule, § 4 Building.
64% of building permit fee, or actual cost of review
Double Fee Penalty (construction without prior Plan Review and Permit)Heber City Consolidated Fee Schedule, § 4 Building: 'Double fees for buildings or installation without Plan Review and Permit.'
2x standard Building Permit fee
Re-Inspection FeeHeber City Consolidated Fee Schedule, § 4 Building.
$60.00
County Impact Fee — Culinary Water (Residential, per ERU)Heber City 2026 Impact Fee Summary (effective 1/1/2026), Consolidated Fee Schedule § 11 Impact Fees.
$4,199.00
County Impact Fee — Sanitary Sewer (per ERU)Heber City 2026 Impact Fee Summary, § 11 Impact Fees: 'In addition to Heber City's impact fees, the City also collects a $4,170.00 per ERU sewer impact fee for the Heber Valley Special Service District.'
$1,562.00 (plus a separate $4,170.00 per ERU Heber Valley Special Service District sewer impact fee, collected by Heber City on the district's behalf)
County Impact Fee — Streets (Single Family Dwelling Unit)Heber City 2026 Impact Fee Summary, § 11 Impact Fees.
$5,640.00
County Impact Fee — Pressurized Irrigation (Residential, per ERU)Heber City 2026 Impact Fee Summary, § 11 Impact Fees.
$1,177.00
County Impact Fee — Parks/Trails (Single Family Dwelling Unit)Heber City 2026 Impact Fee Summary, § 11 Impact Fees.
$6,727.00
County Impact Fee — Public Safety (Single Family Dwelling Unit)Heber City 2026 Impact Fee Summary, § 11 Impact Fees.
$263.00

Review timeline

Plan reviewHeber City’s published plan-review target
14–14 business days

How long did your Residential Building Permit (New Construction) permit actually take in Heber City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Scheduled Inspections (Building/Electrical/Mechanical/Plumbing)

    Scheduled via MyCityInspector; inspection hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page.

See the full Heber City inspection guide — scheduling & re-inspection fees →

Tips

  • Heber City's Building Department is open Monday–Thursday 7:30 a.m.–6:00 p.m. (closed Fridays); inspections run Monday–Thursday 7:30 a.m.–4:30 p.m.
  • The Building Permit fee itself is not a flat city table — it is pegged directly to the ICC's own Building Safety Journal valuation tables, updated every two years by the ICC.
  • Building or installing without first completing Plan Review and obtaining a Permit doubles the standard fee under the city's own Consolidated Fee Schedule.
  • Northwest Heber City may require a soils report due to problem soils in that area — confirm with the Building Department if your parcel is in that section of town.
  • Heber City's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A 'Building Fees' table, checked 2026-07-19) lists a flat $60.00 fee for 'Other (Electrical, Building, Mechanical, and Plumbing)' work and for Temporary Power Pedestal / Electrical Service Change-Out inspections, but no separate EV charger/EVSE line item.

Frequently asked questions

Heber City requires a residential building permit (new construction) for: New single-family residential construction; Plans designed to and reflecting the currently adopted code family (2021 IRC/2024 IBC and related codes, effective July 1, 2026 per the city's Building and Safety Division page); Complete online application submitted via the MyCityInspector/Online Permit Portal (heber.mycityinspector.com); Fully dimensioned floor plans, building elevations, door/window schedules, stair/handrail/guard details, wall sections, roofing/drainage plans, and structural drawings (footing/foundation, wall construction, floor/roof framing, diaphragm connection details); Structural calculations sealed, signed, and dated by the engineer of record, using correct design criteria; Soils report if required by the Building Official (northwest Heber City areas may have problem soils); Building energy analysis demonstrating IECC compliance (prescriptive design, or ResCheck and Manual J reports). If your project isn't listed, confirm with Heber City Building and Safety Division at (435) 654-6330 before starting work.

Per the city's current Consolidated Fee Schedule, the Building Permit fee is valuation-based, calculated from the ICC's Building Safety Journal tables (updated biannually) rather than a flat city dollar amount. A Plan Review fee of 25% of the building permit fee (minimum $60) also applies, plus applicable County Impact Fees (Culinary Water, Sewer, Streets, Pressurized Irrigation, Parks/Trails, and Public Safety).

Per the city's own Residential Plan Submittal Requirements handout, the initial plan review process can take approximately 2 weeks, depending on workload at the time of submittal. Plans are reviewed first come, first served regardless of complexity.

You'll need: Online Building Permit Application (MyCityInspector / Online Permit Portal); Residential Plan Submittal Requirements checklist. See the required-documents checklist on this page for details on each.

Heber City requires 1 inspection(s) for a residential building permit (new construction), in order: Scheduled Inspections (Building/Electrical/Mechanical/Plumbing). Schedule each through Heber City Building and Safety Division ((435) 654-6330).

Apply through Heber City Building and Safety Division at 75 N Main Street, Heber City, UT 84032. Phone: (435) 654-6330, email: hcbuilding@heberut.gov. Office hours: Monday–Thursday 7:30 a.m.–6:00 p.m.; Inspection Hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page. Heber City Hall is closed Fridays (4/10 workweek).. Official information: https://www.heberut.gov/148/Building-and-Safety-Division.

Heber City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — adopted, effective July 1, 2026 through July 1, 2029, per Heber City's official Building and Safety Division page.; 2021 International Residential Code (IRC), including Appendix AQ — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Plumbing Code (IPC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Mechanical Code (IMC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fuel Gas Code (IFGC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Energy Conservation Code (IECC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Existing Building Code (IEBC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2021 International Swimming Pool and Spa Code (ISPSC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fire Code (IFC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; NOTE: Heber City's own Residential Plan Submittal Requirements handout (heberut.gov/DocumentCenter/View/122, Rev. 03/2022) and Residential Basement Finish/Remodel/Deck Submittal Requirements handout (heberut.gov/DocumentCenter/View/123, Rev. 12/2018) still instruct applicants to design plans to the '2015 IRC' — these are older submittal-checklist documents that have not been revised to reflect the current adopted-code table published on the city's own Building and Safety Division page (2021 IRC/2024 IBC family effective July 1, 2026). Reported verbatim from each official source rather than silently reconciled; applicants should confirm the governing edition with the Building Department directly given this discrepancy between the city's own documents.; Current Utah State Amendments apply per Utah Code Title 15A, Chapter 3, referenced directly from the city's own Building and Safety Division page.. Local amendments apply — see the Heber City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heber City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.