Skip to main content
PermitBase

EV Charger / EVSE Permit in Heber City, Utah

Heber City does not publish a distinct EV-charger/EVSE permit or fee line item. The city's Consolidated Fee Schedule (Ordinance 2025-15, Exhibit A, Building Fees table) lists standalone electrical inspection fees — 'Temporary Power Pedestal Inspection' ($60.00), 'Electrical Service Change-Out Inspection' ($60.00), and 'Other (Electrical, Building, Mechanical, and Plumbing)' ($60.00) — and prices new-construction building permits on the ICC Building Safety Journal valuation table. A standalone EV charger installation not tied to new construction would most likely fall under the $60.00 'Other (Electrical...)' inspection fee or the general valuation-based Building Permit fee, but no source explicitly names EV chargers, so this is not asserted as certain.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Heber City
  • Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
  • Building permit application submitted through Heber City's online permit portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Other (Electrical, Building, Mechanical, and Plumbing) InspectionHeber City Consolidated Fee Schedule, Ordinance 2025-15, Exhibit A, Building Fees table. Not explicitly named for EV chargers, but the closest published standalone-electrical-inspection fee category; a standalone charger install not tied to new construction would most likely be billed here.
$60.00
Building Permit Fee (new construction)Heber City Consolidated Fee Schedule, § 4 Building. Applies if the EV charger is installed as part of new construction rather than as a standalone retrofit.
Valuation-based per the ICC Building Safety Journal fee tables, updated biannually

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Heber City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Field inspection of the EV charger circuit and installation, scheduled through the Heber City Building and Safety Division, (435) 654-6330.

See the full Heber City inspection guide — scheduling & re-inspection fees →

Tips

  • Heber City has no EV-charger-specific permit or fee line item — the closest published category for a standalone electrical job is the $60.00 'Other (Electrical, Building, Mechanical, and Plumbing)' inspection fee (Ordinance 2025-15, Exhibit A).
  • If the EV charger is installed as part of new construction, it is instead covered by the general ICC-valuation-based Building Permit fee rather than a standalone inspection fee.
  • Confirm which fee category applies with the Building and Safety Division, (435) 654-6330, before applying, since no source explicitly names EV chargers.

Frequently asked questions

Heber City requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Heber City; Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)); Building permit application submitted through Heber City's online permit portal. If your project isn't listed, confirm with Heber City Building and Safety Division at (435) 654-6330 before starting work.

No distinct EV-charger line item is published. Heber City's Consolidated Fee Schedule (Ordinance 2025-15) lists a $60.00 'Other (Electrical, Building, Mechanical, and Plumbing)' inspection fee that a standalone charger install would likely fall under, or the general valuation-based Building Permit fee if installed with new construction — confirm with the Building and Safety Division.

Heber City does not publish a plan-review timeline for this permit. Contact Heber City Building and Safety Division at (435) 654-6330 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Heber City requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Heber City Building and Safety Division ((435) 654-6330).

Apply through Heber City Building and Safety Division at 75 N Main Street, Heber City, UT 84032. Phone: (435) 654-6330, email: hcbuilding@heberut.gov. Office hours: Monday–Thursday 7:30 a.m.–6:00 p.m.; Inspection Hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page. Heber City Hall is closed Fridays (4/10 workweek).. Official information: https://www.heberut.gov/148/Building-and-Safety-Division.

Heber City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — adopted, effective July 1, 2026 through July 1, 2029, per Heber City's official Building and Safety Division page.; 2021 International Residential Code (IRC), including Appendix AQ — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Plumbing Code (IPC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Mechanical Code (IMC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fuel Gas Code (IFGC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Energy Conservation Code (IECC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Existing Building Code (IEBC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2021 International Swimming Pool and Spa Code (ISPSC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fire Code (IFC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; NOTE: Heber City's own Residential Plan Submittal Requirements handout (heberut.gov/DocumentCenter/View/122, Rev. 03/2022) and Residential Basement Finish/Remodel/Deck Submittal Requirements handout (heberut.gov/DocumentCenter/View/123, Rev. 12/2018) still instruct applicants to design plans to the '2015 IRC' — these are older submittal-checklist documents that have not been revised to reflect the current adopted-code table published on the city's own Building and Safety Division page (2021 IRC/2024 IBC family effective July 1, 2026). Reported verbatim from each official source rather than silently reconciled; applicants should confirm the governing edition with the Building Department directly given this discrepancy between the city's own documents.; Current Utah State Amendments apply per Utah Code Title 15A, Chapter 3, referenced directly from the city's own Building and Safety Division page.. Local amendments apply — see the Heber City overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heber City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.