Skip to main content
PermitBase

Fire Alarm and Detection System Permit in Heber City, Utah

Heber City does not publish a distinct fire alarm/detection system permit or fee line item — a direct text search of the current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' on 2026-07-21 returned only an unrelated Police Section 'Third False Alarm' ($50.00) fee, no Building-fee fire-alarm line item. Fire alarm system plans (for new construction or tenant improvement) are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set filed with Heber City. Fire protection and fire-code plan review for Heber City is provided by Wasatch Fire District (WFD), a separate agency, whose own Exhibit 'A' District Fee Schedule (Resolution 22-04) bills fire alarm plan review through its general valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) or its flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee, rather than a standalone fire-alarm-specific charge.

Verified 2026-07-21 · Source

When you need this permit

  • Installation, modification, or extension of a fire alarm and detection system (or related equipment) in a building within Heber City
  • Reviewed by Wasatch Fire District (WFD) as part of the same plan set submitted for the underlying Commercial Building Permit or Commercial Tenant Improvement Permit — no separate fire-alarm-only application form is published by either Heber City or WFD
  • Fire alarm systems must comply with the 2024 International Fire Code (adopted by Heber City, effective July 1, 2026) and applicable NFPA installation standards

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

WFD Inspection and Plan Review — CommercialWasatch Fire District Exhibit 'A' District Fee Schedule (Resolution 22-04), 'Inspection and Plan Review Fees' table: 'Inspection and Plan Review – Commercial: Valuation x 0.00075.' Read directly from the fee schedule PDF (cdn.sqhk.co/wasatchfd/SNhghjJ/Resolution22-04ExhibitAFeeSchedule) on 2026-07-21. No separate fire-alarm-specific line item exists in either the Heber City or WFD fee schedules; this valuation-based fee is the governing charge covering fire-code plan review, including fire alarm system plans, as part of the broader commercial plan set.
Valuation x 0.00075
WFD Inspection and Plan Review — Residential (in WUI)Same WFD Exhibit 'A' Fee Schedule; applies to residential fire-alarm-bearing projects located within the Wildland Urban Interface (WUI).
Valuation x 0.00075
WFD Inspection and Plan Review — Residential (non-WUI)Same WFD Exhibit 'A' Fee Schedule; applies to residential projects outside the WUI — a lower rate than the Commercial/WUI-Residential tier.
Valuation x 0.0003
WFD Non-Structural Fire & Life Safety / Project Clearance Plan ReviewSame WFD Exhibit 'A' Fee Schedule, 'Inspection and Plan Review Fees' table: 'Non-Structural Fire & Life Safety/Project Clearance Plan Reviews: $225.' Most likely the applicable WFD fee for a standalone fire alarm retrofit not tied to new construction or a valuation-based building permit, though WFD's fee schedule does not explicitly name fire alarm systems under this line item — reported as the closest-fitting published category rather than asserted as certain.
$225.00 flat
Heber City Building Permit Fee (if bundled with new construction/TI)Applies on the Heber City side when the fire alarm system is installed as part of new commercial construction or a tenant improvement project, per the Consolidated Fee Schedule § 4 Building; the fire alarm work itself carries no separate city-side fee line item.
Valuation-based per the ICC Building Safety Journal fee tables, updated biannually

Review timeline

Plan review
Not published — contact the department

How long did your Fire Alarm and Detection System Permit permit actually take in Heber City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Wasatch Fire District Fire Alarm Rough-In / Final Inspection

    Fire alarm system inspections are conducted by Wasatch Fire District (251 E 1200 S, Heber City, (435) 940-9636) as part of the same commercial construction/tenant-improvement inspection sequence, in addition to Heber City's own Building/Electrical/Mechanical/Plumbing inspections.

See the full Heber City inspection guide — scheduling & re-inspection fees →

Tips

  • Heber City has no standalone fire alarm permit or fee — fire alarm plans travel inside the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set, and the fire-code review portion is billed through Wasatch Fire District's own valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) rather than a separate city line item.
  • If a fire alarm system is installed as a standalone retrofit (not tied to new construction), WFD's flat $225.00 'Non-Structural Fire & Life Safety/Project Clearance Plan Review' fee most likely applies, though WFD's own fee schedule does not explicitly name fire alarm systems under that line item — confirm directly with WFD, (435) 940-9636.
  • Fire protection for Heber City is provided by Wasatch Fire District, a separate agency from the Heber City Building Department — budget contact time with both agencies for a fire alarm project.

Frequently asked questions

Heber City requires a fire alarm and detection system permit for: Installation, modification, or extension of a fire alarm and detection system (or related equipment) in a building within Heber City; Reviewed by Wasatch Fire District (WFD) as part of the same plan set submitted for the underlying Commercial Building Permit or Commercial Tenant Improvement Permit — no separate fire-alarm-only application form is published by either Heber City or WFD; Fire alarm systems must comply with the 2024 International Fire Code (adopted by Heber City, effective July 1, 2026) and applicable NFPA installation standards. If your project isn't listed, confirm with Heber City Building and Safety Division at (435) 654-6330 before starting work.

No. A direct search of Heber City's current Consolidated Fee Schedule for 'fire,' 'sprinkler,' and 'alarm' (2026-07-21) found no Building-fee fire-alarm line item. Fire alarm plans are submitted as part of the same Commercial Building Permit or Commercial Tenant Improvement Permit plan set and reviewed by Wasatch Fire District (WFD), which bills its portion under its own valuation-based 'Inspection and Plan Review' fee (Commercial: valuation x 0.00075) rather than a distinct fire-alarm charge.

Heber City does not publish a plan-review timeline for this permit. Contact Heber City Building and Safety Division at (435) 654-6330 for current turnaround.

You'll need: Online Building Permit Application (MyCityInspector / Online Permit Portal). See the required-documents checklist on this page for details on each.

Heber City requires 1 inspection(s) for a fire alarm and detection system permit, in order: Wasatch Fire District Fire Alarm Rough-In / Final Inspection. Schedule each through Heber City Building and Safety Division ((435) 654-6330).

Apply through Heber City Building and Safety Division at 75 N Main Street, Heber City, UT 84032. Phone: (435) 654-6330, email: hcbuilding@heberut.gov. Office hours: Monday–Thursday 7:30 a.m.–6:00 p.m.; Inspection Hours Monday–Thursday 7:30 a.m.–4:30 p.m., per the city's official Building and Safety Division page. Heber City Hall is closed Fridays (4/10 workweek).. Official information: https://www.heberut.gov/148/Building-and-Safety-Division.

Heber City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — adopted, effective July 1, 2026 through July 1, 2029, per Heber City's official Building and Safety Division page.; 2021 International Residential Code (IRC), including Appendix AQ — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Plumbing Code (IPC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Mechanical Code (IMC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fuel Gas Code (IFGC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Energy Conservation Code (IECC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Existing Building Code (IEBC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2021 International Swimming Pool and Spa Code (ISPSC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; 2024 International Fire Code (IFC) — adopted, effective July 1, 2026 through July 1, 2029, per the same official page.; NOTE: Heber City's own Residential Plan Submittal Requirements handout (heberut.gov/DocumentCenter/View/122, Rev. 03/2022) and Residential Basement Finish/Remodel/Deck Submittal Requirements handout (heberut.gov/DocumentCenter/View/123, Rev. 12/2018) still instruct applicants to design plans to the '2015 IRC' — these are older submittal-checklist documents that have not been revised to reflect the current adopted-code table published on the city's own Building and Safety Division page (2021 IRC/2024 IBC family effective July 1, 2026). Reported verbatim from each official source rather than silently reconciled; applicants should confirm the governing edition with the Building Department directly given this discrepancy between the city's own documents.; Current Utah State Amendments apply per Utah Code Title 15A, Chapter 3, referenced directly from the city's own Building and Safety Division page.. Local amendments apply — see the Heber City overview page for the full list.

Wasatch Fire District (WFD), headquartered at 251 E 1200 S, Heber City, (435) 940-9636 — a separate agency from the Heber City Building Department — reviews fire alarm plans and performs fire-alarm-related inspections as part of the overall commercial construction or tenant improvement inspection sequence.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heber City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.