This is PermitBase’s published record for Ivins as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Ivins building permits

Verified

Ivins, Utah — as published 2026-07-19.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC) — adopted via Ivins City Ordinance No. 2025-08 amending Title 14 'Buildings and Construction' (which adopts the state construction code by reference, per Ivins City Code Title 14, Ch.1, and so auto-tracks statutory changes); Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; Ivins charges a distinct Pool Permit Fee ($300, per its Consolidated Fee Schedule)NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force. Because Ivins Ordinance No. 2025-08 adopts the state code by reference rather than restating specific editions, Ivins is not expected to have a separate city-document lag of the kind seen in some sibling cities — this was not independently re-verified against the amlegal-hosted Ivins Code text this session (that site's full ordinance text is not renderable via automated fetch, per the localAmendments entry above).

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction and any work regulated by the adopted 2021 IRC/IBC in Ivins City. Fee is valuation-based per Ivins' Consolidated Fee Schedule (Ordinance No. 2024-12, eff. 07/01/2024), using the city's 1997 Valuation Code, plus a 10% Plan Check surcharge and 1% State Permit Tax.

Verified 2026-07-08 · Source

Requirements

  • New single-family or two-family residential construction
  • Any work regulated by the adopted 2021 IRC/IBC (per Ordinance No. 2025-08, Title 14)
  • Contractor-Owner-Builder Certification Agreement for owner-builder projects
  • Verification of Geotechnical Services (IC Form, geotechnical report required per Geotechnical Report Check List IC Form 7039)
  • Water Service Application (New Construction) and Acknowledgement of Water Supply
  • SWPPP (Storm Water Pollution Prevention Plan) application for applicable disturbance area

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted through Ivins City's 'City Inspect' online permitting system, linked from the Building Department page (ivinsutah.gov/building-department/).
  • RequiredContractor – Owner – Builder Certification AgreementOfficial Ivins City form required to certify contractor-of-record or owner-builder status.
  • RequiredVerification of Geotechnical ServicesOfficial Ivins City form (Geotechnical-Form1.pdf) confirming a geotechnical report has been performed for the site.
  • RequiredCommon Plan Permit / SWPPP TemplateStorm Water Pollution Prevention Plan application template published by Ivins City for applicable construction disturbance.
  • RequiredCity Water Service Application (New Construction)Required for new water service connection; published as 'City-Water-Form.pdf' on Ivins City's Forms page.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Based on Valuation, using the City's 1997 Valuation CodeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024), 'BUILDING PERMIT FEES > Permit Fees > Building Permit: Based on Valuation using 1997 Valuation Code.'
Plan Check Fee10% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'Plan Check: 10% of Building Permit.'
State Permit Tax1% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'State Permit Tax: 1% of Building Permit.' This is the statewide Uniform Building Standard Act fee passed through by municipalities.
Impact Fees (single-family home)Public Safety $1,232.77; Water $3,331.85; Sewer $551.61; Sewer-Regional Plant (pass-through to St. George) $1,379.00; Parks & Recreation $5,224.00; Streets $2,278.00; Storm Drain $1,701.11 (low density) / $1,407.28 (medium density) / $1,005.20 (high density); Habitat 0.2% of valuationIvins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024), 'BUILDING PERMIT FEES > Impact Fees (only shown for Single Family Home).'
SWPPP Fee$200.00Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'SWPPP: $200.00.'

Swimming Pool Permit

Verified

Required for residential swimming pool construction in Ivins City, regulated under the adopted 2021 International Swimming Pool and Spa Code (ISPSC) residential provisions. Ivins publishes a dedicated Swimming Pool Packet and charges a flat Pool Permit Fee separate from the general valuation-based Building Permit fee.

Verified 2026-07-08 · Source

Requirements

  • New in-ground or above-ground residential swimming pool construction
  • Compliance with adopted 2024 ISPSC residential provisions (effective July 1, 2026, superseded the 2021 edition; barrier/fencing, drain safety per Utah's adoption of federal VGB Pool and Spa Safety Act standards)
  • Swimming Pool Packet submittal per Ivins City's published checklist

Required documents

  • RequiredSwimming Pool PacketIvins City's official pool-permit submittal packet, published on the Ivins City Forms page.
  • RequiredBuilding Permit Application (City Inspect online portal)Submitted through Ivins City's 'City Inspect' online permitting system.

Fee schedule

Fee typeAmountNotes
Pool Permit Fee$300.00Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024): 'Pool Permit Fee: $300.00.'

Solar Panel (PV) Permit

Verified

Required for residential rooftop or ground-mounted solar photovoltaic installations in Ivins City. Fee differs based on whether the system includes a battery energy storage apparatus.

Verified 2026-07-08 · Source

Requirements

  • New solar PV installation (roof-mounted or ground-mounted)
  • Building Permit Application via City Inspect online portal
  • Compliance with adopted 2023 NEC for electrical interconnection

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted through Ivins City's 'City Inspect' online permitting system.

Fee schedule

Fee typeAmountNotes
Solar Permit Fee — no battery apparatus$300.00Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024): 'Solar Permit Fee – no battery apparatus: $300.00.'
Solar Permit Fee — with battery apparatus$400.00Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024): 'Solar Permit Fee – with battery apparatus: $400.00.'

Commercial Building Permit

Required for new commercial construction in Ivins, regulated by the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026). Ivins City's Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024) publishes a single, generic 'Building Permit Fees' section that is Based on Valuation using the City's 1997 Valuation Code, with no separate residential/commercial split or dedicated commercial-specific fee line — the same section that governs the Residential Building Permit entry in this file applies here.

Reviewed 2026-07-19 · Source

Requirements

  • New commercial construction regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Application submitted through the Ivins City Inspect online portal (utah.cityinspect.com)
  • Project valuation stated on the application, used to calculate the Building Permit fee under the city's 1997 Valuation Code

Required documents

  • RequiredBuilding Permit Application (CityInspect)Submitted online via Ivins City's CityInspect portal. No commercial-specific application checklist document was located on ivinsutah.gov as of 2026-07-19 — the Building Department page and Forms page (ivinsutah.gov/ivins-city-forms/) do not list a dedicated commercial submittal checklist distinct from the general Building Permit Packet.
  • RequiredConstruction Plans and EngineeringFull architectural, structural, electrical, mechanical, and plumbing plans reflecting the 2024 IBC and related Utah-adopted codes.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Based on Valuation, using the City's 1997 Valuation Code
Ivins City Consolidated Fee Schedule (Ordinance No. Show full citation

Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024), 'BUILDING PERMIT FEES > Permit Fees > Building Permit: Based on Valuation using 1997 Valuation Code.' This line is not split by residential vs. commercial in the published schedule — it is the same fee mechanism cited on the Residential Building Permit entry in this file.

Plan Check Fee10% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'Plan Check: 10% of Building Permit.' No commercial-specific plan check percentage is separately published.
State Permit Tax1% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'State Permit Tax: 1% of Building Permit.'
SWPPP Fee$200.00Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'SWPPP: $200.00.' Not stated as residential-only, so presumed to apply to qualifying commercial disturbance as well.

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement and tenant finish work in existing commercial buildings in Ivins. No dedicated tenant-improvement checklist, application category, or fee line was found published on ivinsutah.gov as of 2026-07-19 — the same generic 'Building Permit Fees' section of the Consolidated Fee Schedule (Ordinance No. 2024-12) that governs all other building permit types in this file is the only identified fee mechanism.

Reviewed 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant improvement work in an existing commercial structure
  • Application submitted through the Ivins City Inspect online portal (utah.cityinspect.com)
  • Project valuation stated on the application, used to calculate the fee under the city's 1997 Valuation Code

Required documents

  • RequiredBuilding Permit Application (CityInspect)Submitted online via Ivins City's CityInspect portal. No tenant-improvement-specific checklist document was located on ivinsutah.gov or on the Forms page (ivinsutah.gov/ivins-city-forms/) as of 2026-07-19.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based), inferred mechanismBased on Valuation, using the City's 1997 Valuation Code
Ivins City Consolidated Fee Schedule (Ordinance No. Show full citation

Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12) publishes only one generic 'Building Permit' valuation line with no tenant-improvement-specific rate. This entry assumes the same mechanism applies to TI work based on the schedule's general framing, but that has not been independently confirmed against a TI-specific line item.

Plan Check Fee10% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'Plan Check: 10% of Building Permit' — no tenant-improvement-specific rate is separately published.
State Permit Tax1% of the Building Permit feeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'State Permit Tax: 1% of Building Permit.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ivins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →