Version history — Washington City, Utah
This is PermitBase’s own verified record for Washington City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Washington City’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-21Superseded
- 2026-07-22Superseded
- 2026-07-20Superseded
- Washington City, Utah — EV Charger / EVSE Permit record added
- Washington City, Utah — Sign Permit record added
- Washington City, Utah — Sign Permit fee record added: Sign Permit (Planning Review Fee) ($35.00)
- Washington City, Utah — Sign Permit fee record added: Conditional Use Permit - Signs ($100.00)
- Washington City, Utah — Sign Permit fee record added: Building Permit Fee Table (if the sign also requires a building permit) (Per the city's duly adopted Building Permit Fee Table (see the residential/commercial building permit entries in this file), plus a 45% plan review fee)
- Washington City, Utah — Sign Permit fee record removed: Sign Permit Fee
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-04Initial record — coverage of Washington City began