Skip to main content
PermitBase

Version history — Washington City, Utah

This is PermitBase’s own verified record for Washington City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Washington City’s actual law was at that time.

Permanent link to today’s record

/utah/washington-county/washington-city/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-25Superseded
  • 2026-08-21Superseded
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Washington City, Utah — EV Charger / EVSE Permit record added
    • Washington City, Utah — Sign Permit record added
    • Washington City, Utah — Sign Permit fee record added: Sign Permit (Planning Review Fee) ($35.00)
    • Washington City, Utah — Sign Permit fee record added: Conditional Use Permit - Signs ($100.00)
    • Washington City, Utah — Sign Permit fee record added: Building Permit Fee Table (if the sign also requires a building permit) (Per the city's duly adopted Building Permit Fee Table (see the residential/commercial building permit entries in this file), plus a 45% plan review fee)
    • Washington City, Utah — Sign Permit fee record removed: Sign Permit Fee
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-04Initial record — coverage of Washington City began