Skip to main content
PermitBase

This is PermitBase’s published record for North Ogden as of 2026-07-21. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

North Ogden building permits

Verified

North Ogden, Utah — as published 2026-07-21.

Verified 2026-07-13 · Source

Codes adopted

North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).Statewide framework per Utah Code § 15A-2-103: as of the code cycle effective July 1, 2026 (confirmed current as of this 2026-07-16 re-verification), the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle, § 15A-2-103(1)(b)), the 2024 International Building Code (IBC, § 15A-2-103(1)(a)), the 2023 National Electrical Code (NEC, continuing from the prior cycle, § 15A-2-103(1)(g)), and other 2024 International Codes (IPC, IMC, IFGC, IEBC, IECC, and the residential provisions of the ISPSC, per § 15A-2-103(1)(d)/(e)/(f)/(i)/(h)/(n)) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows ('recognizes the current adopted Utah State Building Code'), without asserting North Ogden has separately re-published each edition/year. This entry was already correctly stated in present tense as of the prior verification and required no substantive correction on this pass.Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'

Permit types & fees

Residential/Commercial Building Permit

Verified

Required for new construction, additions, remodels, repairs, re-roofing/siding, electrical remodeling, plumbing replacement, and furnace/AC replacement in North Ogden. Both the Single-Family Residential Permit and Commercial Building Permit fee are valuation-based, calculated per the 1997 Uniform Building Code Section 107.2 Table 1-A plus 20%, per the city's official Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026 — the current edition; the previously-cited Resolution 03-2026 PDF link went dead and was confirmed superseded on 2026-07-13).

Verified 2026-07-19 · Source

Requirements

  • New construction, additions, remodels, and repairs including re-roofing/siding, electrical remodeling, plumbing replacement, furnace/AC replacement
  • Commercial structures, additions to or structural remodels of commercial buildings, and non-structural commercial remodels over 3,000 sq ft require a stamp/seal by a State-licensed professional
  • Residential Plan Check Fee Deposit of $500.00, or Commercial Plan Check Fee Deposit of $1,000.00, due at submittal

Required documents

  • RequiredBuilding Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal (cityofnorthogden.portal.iworq.net).

Fee schedule

Fee typeAmountNotes
Single-Family Residential Permit and Commercial Building Permit FeeValuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Department § Building Permit… Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and Commercial Building Permit Fees ... 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%.' North Ogden does not publish its own flat valuation table; the 1997 UBC Table 1-A (plus a 20% surcharge) is the governing figure. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Residential Plan Check Fee Deposit$500.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Commercial Plan Check Fee Deposit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Single-Family Residential Plan Check50% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Commercial Building Plan Check65% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
State Fee1% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Minimum Building Permit Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Re-inspection Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
After-Hours/Emergency Inspection$125.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Temporary Power Inspection$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Stop Work (Red Tag) — Failure to Obtain a Building Permit$250.00 first offense, $1,000.00 each additional offense (regardless of project type, unless emergency-related)North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Deposit for Off-Site Improvements (all new construction)$1,500.00
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition). Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition). SUPERSEDED FIGURE: Resolution 03-2026 (adopted January 13, 2026) published this deposit at $1,000.00; confirmed via direct page-3 comparison of both editions (03-2026 recovered via Wayback Machine snapshot dated 2026-01-17, since its live PDF now 404s) that Resolution 05-2026 raised it to $1,500.00. Genuine fee increase, not a citation error. Change identified and figure updated 2026-07-13.

Impact Fees (single-family residential, illustrative components)Storm Water $2,186.49; Water $6,273.70; Sewer $873.20; Sewer (CWSID) $3,575.00 (effective July 1, 2026; $3,537.00 prior to that date); Parks $6,017.26; Public Safety $388.93; Transportation $2,297.37; Fire $477.85
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Impact Fee Summary (page 13-14). Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Impact Fee Summary (page 13-14). All figures unchanged from the 03-2026 edition except the Central Weber Improvement Sewer District (CWSID) single-family sewer impact fee: the Impact Fee Summary table itself publishes a scheduled step-up from $3,537.00 to $3,575.00 'effective July 1, 2026.' As of this 2026-07-13 verification, that effective date has passed, so $3,575.00 is now the governing figure; $3,537.00 is retained parenthetically as the pre-July-1-2026 rate for historical reference. Multi-family and 'Additional Dwelling Unit (ADU)' rows in the same table publish different, lower per-unit or per-square-foot rates (e.g., ADU Water $4,893.50, ADU Sewer $681.10, ADU Fire $236.53, ADU Transportation $915.19) — these are impact-fee-schedule tiers by dwelling type, not a separate 'ADU permit' application fee.

Land Use Permit

North Ogden's Consolidated Fee Schedule publishes a single flat 'Land Use Permits' fee under the Planning Department section, distinct from the valuation-based Building Permit Fee. The city's official published sources do not break this category down into named sub-types (e.g., fence, shed, deck, retaining wall) the way some neighboring Utah cities' fee schedules do — it is published as one line item.

Reviewed 2026-07-13 · Source

Requirements

  • Applies to land-use-related permits reviewed by the Planning Department, submitted via the iWorQ online portal (cityofnorthogdenhome.portal.iworq.net)
  • The city's official Applications and Forms pages route all Planning and Zoning permit types through the iWorQ portal rather than publishing individually named PDF applications for accessory structures

Required documents

  • RequiredLand Use Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal for Planning and Zoning (cityofnorthogdenhome.portal.iworq.net/portalhome/cityofnorthogdenhome).

Fee schedule

Fee typeAmountNotes
Land Use Permits$40.00
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Planning Department section: 'Land Use Permits ... Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Planning Department section: 'Land Use Permits ... $40.00.' This is the only Planning-Department-level permit fee published as a flat, non-valuation-based amount besides the Zoning Verification Letter ($25.00) and Re-build Letter ($25.00). Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Excavation, Grading, and Road Cut Permits

Verified

North Ogden requires separate permits and fees for excavation, grading, blasting, and road cuts, published in the Building Department section of the Consolidated Fee Schedule. These are distinct from the general Building Permit Fee.

Verified 2026-07-13 · Source

Requirements

  • Excavation work requires an Excavation Permit
  • Grading work requires a Grading Permit
  • Blasting requires a Blasting Permit
  • Cutting into a public road/right-of-way requires a Road Cut Fee payment plus bonding

Required documents

  • RequiredExcavation/Grading Permit Application (iWorQ portal or Building Department)Submitted through North Ogden's iWorQ portal or directly through the Building Department.

Fee schedule

Fee typeAmountNotes
Excavation Permit$75.00 + Road Cut Fee ($2.50 per sq ft) — shares the Road Cut Fee formula below; no separate flat Excavation Permit fee is published
CORRECTED 2026-07-13: this entry previously listed a standalone 'Excavation Permit' fee of $1,000.00, but that figure does not appear in either the Resolution 03-2026 or Resolution 05-2026 (current,… Show full citation

CORRECTED 2026-07-13: this entry previously listed a standalone 'Excavation Permit' fee of $1,000.00, but that figure does not appear in either the Resolution 03-2026 or Resolution 05-2026 (current, adopted May 12, 2026, effective May 13, 2026) editions of the Consolidated Fee Schedule. Direct visual inspection of the Building Permit Fees table (page 3) in both editions shows 'Excavation Permit' and 'Road Cut Fee' sharing a single merged fee cell — '$75.00 + Road Cut Fee' / '$2.50 per Sq Ft' — with no distinct dollar figure for Excavation Permit alone. The $1,000.00 previously recorded here most likely came from a mis-mapped extraction (the same $1,000.00 value that correctly belongs to the separate 'Mining/Crushing Permit' line item). Corrected to match the actual published fee structure rather than carrying forward an unsupported figure, per the zero-fabrication policy.

Grading Permit$150.00
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Grading Permit ... Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Grading Permit ... $150.00.' Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Blasting Permit$50.00
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Blasting Permit ... Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Blasting Permit ... $50.00.' Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Road Cut Fee$75.00 + Road Cut Fee ($2.50 per sq ft); Taxing Entities (Special Districts & Government) pay 75% of standard fee; Cash Bond $300.00; Performance Bond $2,000.00; New Road Cut Additional Fee $500.00 (roads two years old or less)
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees and North Ogden… Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees and North Ogden City Street Cuts Fee sections. Fee applies to rights-of-way 60 feet or less; 66-foot rights-of-way are 15% more; 80-foot-plus rights-of-way are 30% more. All figures unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Mining/Crushing Permit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Commercial Building Permit

Verified

Required for new commercial construction in North Ogden. North Ogden's Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026) titles its valuation fee line 'Single-Family Residential Permit and Commercial Building Permit Fees' — one shared table (1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%) governs both residential and commercial construction, but commercial carries its own higher Plan Check Fee Deposit ($1,000 vs. $500) and Plan Check percentage (65% vs. 50%).

Verified 2026-07-19 · Source

Requirements

  • New commercial construction, additions to commercial buildings, or structural remodels of commercial buildings
  • All plans for new commercial structures, additions to or structural remodels of commercial buildings, and non-structural remodels over 3,000 square feet in area, require a stamp or seal by a State-licensed professional, per North Ogden's official Building Codes page
  • Commercial Plan Check Fee Deposit of $1,000.00 due at submittal

Required documents

  • RequiredBuilding Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal (cityofnorthogden.portal.iworq.net).

Fee schedule

Fee typeAmountNotes
Single-Family Residential Permit and Commercial Building Permit FeeValuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%
North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and… Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and Commercial Building Permit Fees ... 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%.' Same shared table used for the Residential Building Permit — North Ogden does not publish a separate commercial valuation table.

Commercial Plan Check Fee Deposit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Commercial Building Plan Check65% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section — higher than the 50% Single-Family Residential Plan Check rate on the same table.
State Fee1% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Minimum Building Permit Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Re-inspection Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
After-Hours/Emergency Inspection$125.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Deposit for Off-Site Improvements (all new construction)$1,500.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section; applies to 'all new construction,' including commercial. Raised from $1,000.00 under the prior Resolution 03-2026 edition.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement and structural or non-structural remodels of existing commercial buildings in North Ogden. Uses the same shared 1997 UBC Table 1-A (plus 20%) valuation fee table and commercial Plan Check rate as new commercial construction — a full review of the Building Department section of the Consolidated Fee Schedule (Resolution 05-2026) found no dedicated tenant-improvement fee line.

Verified 2026-07-19 · Source

Requirements

  • Structural remodels of commercial buildings, or non-structural commercial remodels over 3,000 square feet, require a stamp or seal by a State-licensed professional, per North Ogden's official Building Codes page
  • Most repairs or alterations require a building permit, including remodeling, per the Building Codes page's general permit-trigger language
  • Commercial Plan Check Fee Deposit of $1,000.00 due at submittal

Required documents

  • RequiredBuilding Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal (cityofnorthogden.portal.iworq.net).

Fee schedule

Fee typeAmountNotes
Single-Family Residential Permit and Commercial Building Permit Fee (applies to tenant improvement/remodel work)Valuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%
North Ogden City Consolidated Fee Schedule, Resolution 05-2026. Show full citation

North Ogden City Consolidated Fee Schedule, Resolution 05-2026. No dedicated tenant-improvement fee line exists in the Building Department section (confirmed via full review, 2026-07-19) — tenant improvement/remodel work is billed on the same shared valuation table used for new commercial construction.

Commercial Plan Check Fee Deposit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Commercial Building Plan Check65% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
State Fee1% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Minimum Building Permit Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Re-inspection Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.

EV Charger / EVSE Permit

Verified

North Ogden has no distinct EV charger/EVSE permit type or fee line item — installing electric vehicle charging equipment is electrical work billed under the city's single integrated Building Permit Fee (1997 Uniform Building Code, Section 107.2 Table 1A, plus a 20% surcharge), the same valuation-based schedule used for all building, electrical, plumbing, and mechanical work in North Ogden (there is no separate 'Electrical Permit' type in the city's own permit catalog). A direct review of the city's current Consolidated Fee Schedule (Resolution 05-2026, effective document '05-2026 Consolidated Fee Schedule - Permanent.pdf') found no 'EV,' 'electric vehicle,' or 'EVSE' line item anywhere in the document.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in North Ogden
  • New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
  • Building Permit Application submitted through North Ogden's Building Department (iworq portal, cityofnorthogden.portal.iworq.net)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via North Ogden's online building permit portal (cityofnorthogden.portal.iworq.net) or in person with the Building Department.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, covers electrical/EVSE scope)1997 Uniform Building Code, Section 107.2 Table 1A, plus 20%; Minimum Building Permit Fee $56.40
North Ogden Consolidated Fee Schedule (Resolution 05-2026, '05-2026 Consolidated Fee Schedule - Permanent.pdf'), 'Building Permit Fees' section: 'Single-Family Residential Permit and Commercial… Show full citation

North Ogden Consolidated Fee Schedule (Resolution 05-2026, '05-2026 Consolidated Fee Schedule - Permanent.pdf'), 'Building Permit Fees' section: 'Single-Family Residential Permit and Commercial Building Permit Fees — 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%' and 'Minimum Building Permit Fee $56.40.' No distinct EV-charger or standalone electrical-permit fee line exists; a related 'Temporary Power Inspection' fee of $56.40 is separately listed under the same Building Permit Fees section.

Plan Check FeeResidential: 50% of Permit Fee; Commercial: 65% of Permit FeeNorth Ogden Consolidated Fee Schedule, Building Permit Fees section.
State Fee1% of Permit FeeNorth Ogden Consolidated Fee Schedule, Building Permit Fees section.

Solar / Solar PV Installation Permit

Verified

North Ogden has no distinct solar or solar PV installation permit type or fee line item — rooftop and ground-mount solar installations are processed under the city's single integrated Building Permit Fee (1997 Uniform Building Code, Section 107.2 Table 1A, plus a 20% surcharge), the same valuation-based schedule used for all building, electrical, plumbing, and mechanical work in North Ogden. The city's own Building Department index page (northogdencity.com/departments/building/index.php) explicitly names this activity, stating: 'The Building Department issues permits for new constructions, additions, remodels, repairs, and solar installations for existing structures.' A direct, full page-by-page review of the current 15-page Consolidated Fee Schedule (Resolution 05-2026, effective May 13, 2026) found zero mentions of 'solar,' 'photovoltaic,' 'PV,' or 'renewable energy' anywhere in the document.

Verified 2026-07-21 · Source

Requirements

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system on an existing residential or commercial structure in North Ogden
  • Compliance with the statewide-adopted 2024 International Building Code and 2023 National Electrical Code structural and electrical provisions (Utah Code § 15A-2-103), since North Ogden does not publish separate solar-specific structural or fire-setback standards
  • Building Permit Application submitted through North Ogden's Building Department (iWorQ portal, cityofnorthogden.portal.iworq.net)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via North Ogden's online building permit portal (cityofnorthogden.portal.iworq.net) or in person with the Building Department.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, covers solar PV installation scope)1997 Uniform Building Code, Section 107.2 Table 1A, plus 20%; Minimum Building Permit Fee $56.40
North Ogden Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026, '05-2026 Consolidated Fee Schedule - Permanent.pdf'), Building Permit Fees section:… Show full citation

North Ogden Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026, '05-2026 Consolidated Fee Schedule - Permanent.pdf'), Building Permit Fees section: 'Single-Family Residential Permit and Commercial Building Permit Fees — 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%' and 'Minimum Building Permit Fee $56.40.' No distinct solar-specific fee line exists anywhere in the 15-page document (confirmed via direct full-document review, 2026-07-21).

Plan Check FeeResidential: 50% of Permit Fee; Commercial: 65% of Permit FeeNorth Ogden Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
State Fee1% of Permit FeeNorth Ogden Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-07-22) →View current record →All versions →

Permalink: /utah/weber-county/north-ogden/as-of/2026-07-21/

Snapshot date: 2026-07-21

Commit: c9b89ef

Reproducible from PermitBase’s version-controlled dataset, commit c9b89ef.