Skip to main content
PermitBase

North Ogden building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for North Ogden, Utah.

Last verified 2026-07-13 · Source · Embed this page’s badge · Version history

Building department

Address
505 E 2600 North, North Ogden, UT 84414
Phone
(801) 737-9837 or (801) 737-2218
Office hours
Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 1:00 PM, per the city's official Building Codes page and Finance Department contact block (consistent hours published city-wide).

Inspection guide

See how inspections work in North Ogden — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).
  • Statewide framework per Utah Code § 15A-2-103: as of the code cycle effective July 1, 2026 (confirmed current as of this 2026-07-16 re-verification), the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle, § 15A-2-103(1)(b)), the 2024 International Building Code (IBC, § 15A-2-103(1)(a)), the 2023 National Electrical Code (NEC, continuing from the prior cycle, § 15A-2-103(1)(g)), and other 2024 International Codes (IPC, IMC, IFGC, IEBC, IECC, and the residential provisions of the ISPSC, per § 15A-2-103(1)(d)/(e)/(f)/(i)/(h)/(n)) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows ('recognizes the current adopted Utah State Building Code'), without asserting North Ogden has separately re-published each edition/year. This entry was already correctly stated in present tense as of the prior verification and required no substantive correction on this pass.
  • Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
8units

4 buildings · $1.9M valuation

Trailing 12 months
86units

8 of 12 months reported · #54 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
59units

14 buildings · $10.9M valuation

5 month(s) reported to Census

Full year 2025
105units

66 buildings · $25.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • North Ogden's official Building Codes page (northogdencity.gov/departments/building/building_codes.php) does not name specific code edition years the way Highland's does — it states only that the city 'recognizes the current adopted Utah State Building Code.' The statewide framework (effective July 1, 2026) is the 2021 IRC, 2024 IBC, 2023 NEC, and other 2024 I-Codes, but this entry does not claim North Ogden has separately re-published each title by name.
  • North Ogden's Building Permit Fee is calculated from the 1997 Uniform Building Code, Section 107.2, Table 1-A, plus a 20% surcharge — an older reference table than the current-ICC-schedule approach used by Highland and some other Wasatch Front cities.
  • No dedicated fence, retaining wall, pool, solar, or ADU-specific permit application fee is published anywhere in North Ogden's Resolution 05-2026 Consolidated Fee Schedule (current edition, effective May 13, 2026; confirmed via review of the Building, Business Licenses, Civil Penalties, and Planning Department sections on 2026-07-13, consistent with the prior full 15-page line-by-line review of the now-superseded Resolution 03-2026 edition). The closest analog is a flat $40.00 'Land Use Permits' fee under the Planning Department — always confirm the exact scope of that fee directly with the Building Department before assuming it covers a specific project type.
  • Stop Work (Red Tag) penalties for building without a permit escalate sharply: $250 first offense, $1,000 for each additional offense, regardless of project type unless emergency-related.
  • Impact fees vary significantly by dwelling classification — the Consolidated Fee Schedule publishes separate per-unit rates for single-family, multi-family, and 'Additional Dwelling Unit (ADU)' categories across Storm Water, Water, Sewer, Parks, Public Safety, Transportation, and Fire.
  • No jurisdiction-published plan-review turnaround time (in business or calendar days) was located for any North Ogden permit type in official static sources as of 2026-07-13. The city's online iWorQ permitting portal requires login and was not treated as a citable static public source under the grounded-extraction policy; all permit-type reviewTimelineDays fields are honestly null with a note rather than estimated.
  • 2026-07-13 data-integrity update: the Resolution 03-2026 Consolidated Fee Schedule PDF previously cited throughout this entry returned HTTP 404 (confirmed dead link). North Ogden's Finance Department page now links a superseding Resolution 05-2026 Consolidated Fee Schedule (adopted May 12, 2026, effective May 13, 2026), which was located, downloaded, and compared line-by-line against a Wayback Machine snapshot of the old 03-2026 PDF (captured 2026-01-17) covering the Building Permit Fees and Impact Fee Summary tables. Two genuine fee changes were found: the Deposit for Off-Site Improvements rose from $1,000.00 to $1,500.00, and the CWSID single-family sewer impact fee stepped up from $3,537.00 to $3,575.00 effective July 1, 2026 (now in effect). All citation URLs throughout this entry were updated to the current 05-2026 PDF. Separately, a pre-existing data error was also found and corrected: the 'Excavation Permit' fee had been recorded as a standalone $1,000.00, but neither the old nor the new PDF publishes such a figure — 'Excavation Permit' actually shares the same '$75.00 + Road Cut Fee' formula as the Road Cut Fee line item in both editions.

Comparable nearby cities

Farr West
Both in Weber County9 shared permit types~4 mi away
Compare fees →
Plain City
Both in Weber County9 shared permit types~7 mi away
Compare fees →
Roy
Both in Weber County9 shared permit types~11 mi away
Compare fees →