Skip to main content
PermitBase

Plain City building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Plain City, Utah.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
4160 W 2200 N, Plain City, UT 84404
Phone
(801) 731-4908
Email
Office hours
Mon–Thurs 8:00 AM – 5:00 PM; Fri 8:00 AM – 12:00 PM noon; closed Saturday and Sunday

Inspection guide

See how inspections work in Plain City — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • International Building Code (IBC) — adopted per Plain City Code § 9-1-1(A) pursuant to Utah Code Annotated § 58-56-4(2) and Utah Administrative Code R156-56-701, as modified by chapter 11 of the supplement to the IBC promulgated by the International Code Council, and amended per statewide amendments in Utah Administrative Code R156-56-704 (automatically updated per § 9-1-1(C) whenever the Division of Occupational and Professional Licensing/Uniform Building Code Commission adopts new statewide amendments). Per Utah Code § 15A-2-103 (re-verified live 2026-07-23), the statewide-adopted edition is now the 2024 IBC (including Appendices C and J), which took effect July 1, 2026 and supersedes the prior 2021 IBC edition (effective July 1, 2023 through June 30, 2026) — Plain City's automatic-adoption clause carries this forward without any local ordinance action required.
  • International Residential Code (IRC) — adopted by reference within IBC standards per Plain City Code § 9-1-1(A) ('...together with standards incorporated into the IBC by reference, including...the international residential code (IRC) promulgated by the International Code Council'). Statewide-adopted edition is the 2021 IRC per Utah Code § 15A-2-103 — re-verified live 2026-07-23; the 2026-07-01 statewide IBC transition to the 2024 edition did NOT carry the IRC forward, so 2021 remains current.
  • International Energy Conservation Code (IECC) — adopted by reference within IBC standards per Plain City Code § 9-1-1(A). Utah Code § 15A-2-103(1)(h) specifies the current statewide-adopted edition as the 2024 IECC (re-verified live 2026-07-23). Plain City's Residential Building Permit Plan Submittal Requirements (Doc 475) additionally requires a REScheck energy analysis report showing compliance with the model energy code, passing by a minimum of 3% if using the Utah Energy Conservation Method.
  • Statewide plumbing, mechanical, and electrical codes (IPC/IMC/NEC) apply uniformly across Utah municipalities under the State Construction Code (Utah Code Title 15A) but are not separately codified in Plain City's own municipal code sections located during this research; Plain City's plan submittal checklists (Docs 475, Accessory Building Doc) require electrical, plumbing, and mechanical plans as part of the IRC-governed construction drawings, consistent with statewide adoption rather than a distinct local ordinance.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
11units

11 buildings · $5.6M valuation

Trailing 12 months
30units

12 of 12 months reported · #76 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
19units

19 buildings · $10.1M valuation

5 month(s) reported to Census

Full year 2025
39units

39 buildings · $21M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Plain City has its own independent Building Department (Building Inspector Trent Meyerhoffer) — it is NOT contracted out to Weber County, though the county appears on notarization/affidavit lines in city forms since Plain City sits within Weber County.
  • Plain City Building Department office hours: Mon–Thurs 8:00 AM–5:00 PM, Fri 8:00 AM–12:00 PM noon, closed Saturday/Sunday — note the shortened Friday hours, unlike Murray (UT) which has no Friday closure.
  • Building permits expire 180 days after issuance or 180 days after the last inspection; a progress inspection is required at least every 180 days to keep a permit active, per Plain City's official Required Inspections document.
  • Despite an exhaustive search (Building Department page, general Fee Schedule Resolution #2024-07, both residential and accessory plan submittal checklists, Required Inspections list, and the amlegal municipal code), no dollar-figure valuation-based building permit fee table was located for Plain City as of 2026-07-08 — this is a genuine publication gap, not an omission by this dataset; the residential-building-permit entry is honestly marked confidence:"partial" with fees:[] rather than fabricated.
  • Plain City's general Fee Schedule (Resolution #2024-07) does list concrete new-construction impact fees for single-family dwellings: Parks/Recreation/Trails Impact Fee $1,920.32, Sewer Connection $300.00, Sewer Impact Fee (Central Weber-set, as of 07/01/2024) $3,537.00, Transportation Impact Fee $575.00, Storm Sewer Fee $790.00, Public Safety Impact Fee $90.00, and Garbage Cans $133.39 — these are impact/utility fees, separate from any building-permit valuation fee.
  • No jurisdiction-published plan-review turnaround time was located for any Plain City permit type in official sources as of 2026-07-08 — the residential-building-permit entry applies the Utah Code § 10-20-909 statutory floor (3-business-day completeness screening + 14-business-day plan review = 17 business days total) since it is a genuine one-/two-family dwelling permit; this statutory floor is NOT extended to the DADU permit type, which is left null with an explanatory note.
  • Plain City adopts the IBC/IRC/IECC via Plain City Code § 9-1-1 by direct reference to Utah's statewide code and its statewide amendments (Utah Administrative Code R156-56-704), automatically updating whenever the state adopts new amendments — this differs structurally from Murray's IBC/IRC ordinance language but reaches the same statewide-current edition. As of a 2026-07-23 re-verification against Utah Code § 15A-2-103, the 2024 IBC took effect July 1, 2026 and is now the current statewide edition (superseding the 2021 IBC); the IRC remains the 2021 edition and the NEC remains the 2023 edition — neither moved forward in the July 2026 transition.
  • A 2026-07-23 exhaustive re-chase of this file's remaining fee gaps found that Plain City Municipal Code § 9-1-4 ('FEE SCHEDULE,' Title 9, Building Code) adopts Table 1-A of the 1997 Uniform Building Code as the valuation-based fee table governing 'fees authorized in the IBC for inspections, permits, certificates and other purposes' citywide — a fee mechanism first discovered for the Solar PV Permit entry on 2026-07-21 but never previously cross-applied to the base Residential, Commercial, Commercial Tenant Improvement, or EV Charger Building Permit entries in this file. All four of those entries were closed on 2026-07-23 using this same governing citation. The Sign Permit entry's fee gap was specifically tested against this mechanism and does NOT close the same way — § 9-1-4 is textually scoped to fees 'authorized in the IBC' (Title 9), while Plain City's sign permit requirement lives in the separate Title 10 zoning code (Chapter 12, Sign Regulations) under its own unquantified fee-authorization clause (§ 10-1-5(L)) — so the Sign Permit fee remains genuinely unpublished and confidence:"partial".

Comparable nearby cities

Farr West
Both in Weber County9 shared permit types~3 mi away
Compare fees →
North Ogden
Both in Weber County9 shared permit types~7 mi away
Compare fees →
Roy
Both in Weber County9 shared permit types~10 mi away
Compare fees →