EV Charger / EVSE Permit — Plain City, Utah · Requirements sheet
Verified 2026-07-23 · Source: https://www.plaincityutah.gov/1268/Building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Plain City, Utah
Plain City has no distinct EV charger/EVSE permit type, and no dedicated Electrical Permit type either — EV charger/EVSE installation is electrical work that falls under the city's general Residential Building Permit, submitted through the same Online Building Permit Portal. A fresh check of Plain City's Fee Schedule (Resolution #2024-07, Exhibit A) found no 'EV,' 'electric vehicle,' or 'EVSE' mention anywhere in the document, and no base building-permit fee is restated there at all. A 2026-07-23 re-chase closed this gap the same way it was closed for the underlying Residential Building Permit entry in this file: Plain City Municipal Code § 9-1-4, 'FEE SCHEDULE,' adopts Table 1-A of the 1997 Uniform Building Code as the valuation-based fee table governing all IBC-authorized building permits citywide, and since an EV charger permit is issued as that same Building Permit, the same fee mechanism applies — see the fees array for the full table.
Verified 2026-07-23 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Plain City
- New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
- Building Permit Application submitted via Plain City's Online Building Permit Portal (plaincity_permit.portal.iworq.net)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Power-To-Panel / Electrical
Electrical inspection of the new EV charger circuit, done when wiring is complete enough for circuits to function once the power company energizes the meter base; all grounding systems must be in place, per Plain City's official Required Inspections list.
See the full Plain City inspection guide — scheduling & re-inspection fees →
Tips
- EV charger/EVSE installation is electrical work that falls under this same general Residential Building Permit — a check of Plain City's Fee Schedule (Resolution #2024-07, Exhibit A) on 2026-07-20 found no 'EV,' 'electric vehicle,' or 'EVSE' mention anywhere in the document, consistent with the city's broader gap in publishing a base building-permit fee table in that specific resolution.
- No base building-permit fee table is restated in Plain City's Consolidated Fee Schedule — but a 2026-07-23 re-chase found Plain City Municipal Code § 9-1-4 adopts Table 1-A of the 1997 Uniform Building Code as the actual governing valuation-based fee table for all IBC-authorized building permits citywide, EV charger work included since it is issued as a standard Building Permit. Submit your project's estimated valuation to the Building Department at (801) 731-4908 for the calculated figure.
- Temporary power requires no city inspection — contact Rocky Mountain Power directly, per Plain City's Required Inspections list.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Plain City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Plain City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Plain City project checklist
Describe your project once and get every permit, document, and fee it triggers in Plain City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →