Skip to main content
PermitBase

Roy building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Roy, Utah.

Last verified 2026-07-03 · Source · Embed this page’s badge · Version history

Building department

Address
5051 South 1900 West, Roy, UT 84067
Phone
801-774-1040
Office hours
Monday–Thursday 8:00 a.m. to 5:00 p.m.; Friday 8:00 a.m. to Noon, per Roy City's own Building Official page (royutah.gov/_T21_R4.php), fetched 2026-07-03.

Inspection guide

See how inspections work in Roy — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Roy City's Building Permits & Inspections page still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the earlier fetch: 'Roy City has adopted minimum design and construction requirements found in the state amended 2021 IBC, IPC, IMC, IFGC and IRC, as well as the 2020 NEC.' State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale or omitted) text.
  • 2024 International Building Code (IBC), state-amended — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Roy City's Building Permits & Inspections page still lists 'the state amended 2021 IBC' (live re-check 2026-07-16).
  • 2021 International Residential Code (IRC), state-amended, including Appendix AQ — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Roy City's page, which lists 'the state amended ... IRC' as 2021 (live re-check 2026-07-16).
  • 2024 International Plumbing Code (IPC), state-amended — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IPC' (live re-check 2026-07-16).
  • 2024 International Mechanical Code (IMC), state-amended — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IMC' (live re-check 2026-07-16).
  • 2024 International Fuel Gas Code (IFGC), state-amended — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IFGC' (live re-check 2026-07-16).
  • 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip. Roy City's page still lists 'the 2020 NEC' (live re-check 2026-07-16) — this is a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip (the 2023 NEC has been state law since before this project's original review), of the same kind documented for American Fork's Solar Checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.
  • 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Not mentioned anywhere on Roy City's Building Permits & Inspections page, its permit-information handouts, or its Consolidated Fee Schedule as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.
  • 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16, despite the city offering a Residential Swimming Pools permit info page; added as a statute-sourced omission.
  • Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.
  • No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — it is separately governed under Title 15A Chapter 5, outside the scope of this section. Roy City's page does not list an IFC edition either, so there is no mis-citation to correct here.
  • Roy City Design Criteria (site-specific structural values published alongside the adopted-codes statement on the same Building Permits & Inspections page): Ground Snow Load 40 psf; Wind Speed 120 mph, Exposure B or C; Seismic Design Category D0; Frost Depth 30 inches below grade.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
14units

14 buildings · $4.6M valuation

Trailing 12 months
149units

12 of 12 months reported · #43 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
74units

64 buildings · $23.4M valuation

5 month(s) reported to Census

Full year 2025
174units

50 buildings · $46.7M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Roy City requires 100% online permit applications through the CityInspect / My City Inspector portal (roycity.cityinspect.com or roycity.mycityinspector.com — both domains appear across different Roy City handouts) — no in-person or paper application path is described in any city handout reviewed.
  • Roy City's own published initial plan-review turnaround is 14 business days after acceptance for review, stated identically for both new one/two-family dwelling permits and additions/remodels — this is the only jurisdiction-published review-timeline figure found for Roy as of 2026-07-04; all other permit types in this file are honestly null with a note rather than estimated.
  • Roy City's Building Permit fee is calculated using Table 1-A of the 1997 Uniform Building Code applied against current ICC Building Valuation Data — an unusual combination (1997 fee table + current valuation data) worth flagging distinctly from neighboring cities that use fully modern fee tables (e.g., Murray's 2026 valuation-based table).
  • Roy City's own Building Permits & Inspections page currently states 2020 NEC as the adopted electrical code, even though Utah Code § 15A-2-103 mandates the 2023 NEC statewide — a PRE-EXISTING discrepancy (predates the 7/1/2026 code-cycle flip) of the same kind found in American Fork's and Provo's building documents.
  • As of Utah Code § 15A-2-103's 7/1/2026 code-cycle flip (Ch. 47, 2026 General Session), the state-mandated editions are 2024 IBC/IPC/IMC/IFGC/IECC/IEBC, residential provisions of the 2024 ISPSC, and MBI 1200/1205, while the 2021 IRC and 2023 NEC did not change. Roy City's page still displays the pre-flip 2021 IBC/IPC/IMC/IFGC list (live re-check 2026-07-16, unchanged since original review) and does not mention IECC, IEBC, ISPSC, or MBI at all — state law governs regardless.
  • Detached accessory buildings up to 200 sq ft and 10 ft tall do not require a permit in Roy City, provided setbacks are met and no runoff crosses onto adjacent property.
  • Attached decks under 30 inches above grade, under 200 sq ft, and not serving a primary egress are exempt from permitting — but any attached deck 30 inches or higher above grade, or serving an exit, does require one.
  • Roy City's Design Criteria (published on the same page as its adopted-codes statement): 40 psf ground snow load, 120 mph wind (Exposure B or C), Seismic Design Category D0, 30-inch frost depth — verify against neighboring Weber County jurisdictions before assuming uniformity, as these are Roy-specific structural design values.
  • No jurisdiction-published plan-review or permit-issuance turnaround time beyond the 14-business-day initial-review figure was found for any Roy City permit type as of 2026-07-04 — reviewTimelineDays is null with an explanatory note for every permitType except the two general residential permits.

Comparable nearby cities

Ogden
Both in Weber County10 shared permit types~6 mi away
Compare fees →
Unincorporated Weber County
Both in Weber County11 shared permit types
Compare fees →
Farr West
Both in Weber County9 shared permit types~9 mi away
Compare fees →