Roy building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Roy, Utah.
Verified 2026-07-03 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 5051 South 1900 West, Roy, UT 84067
- Phone
- 801-774-1040
- ced@royutah.gov
- Office hours
- Monday–Thursday 8:00 a.m. to 5:00 p.m.; Friday 8:00 a.m. to Noon, per Roy City's own Building Official page (royutah.gov/_T21_R4.php), fetched 2026-07-03.
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit
- 1
Footing / Foundation
Before concrete pour, per standard IBC inspection sequence enforced by Roy City; scheduled through the CityInspect / My City Inspector portal.
- 2
Underground / Under-Slab MEP
Plumbing, electrical, and mechanical rough-in below slab, before fill or pour.
- 3
Framing / Four-Way Rough-In
After framing, sheathing, roof, and MEP rough-in complete.
- 4
Insulation
After insulation installed, before drywall/wall coverings.
- 5
Final / Certificate of Occupancy
All work complete; scheduled via the online portal prior to occupancy.
Applies to: Residential Building Permit (One & Two Family Dwellings)
- 1
Footing / Foundation
Standard sequence per adopted 2021 IBC/IRC inspection points; scheduled through the CityInspect / My City Inspector portal.
- 2
Framing
After framing, sheathing, and MEP rough-in complete.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final
All work complete; scheduled via the online portal prior to occupancy.
Applies to: Fire Sprinkler System Permit
- 1
Flow Test
One of the included inspections for a Fire Sprinkler System Permit.
- 2
Hydrostatic Test
One of the included inspections for a Fire Sprinkler System Permit.
- 3
Final Inspection
Final inspection of the installed fire sprinkler system.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Rough-In
Wall framing and MEP rough-in for the TI/remodel scope, before closing walls.
- 2
Final / Certificate of Occupancy
Completed TI/remodel work verified before occupancy sign-off.
Applies to: Electrical / Plumbing / Mechanical Permit
- 1
Rough-In
Trade-specific rough-in inspection before closing walls.
- 2
Final
Final trade inspection scheduled via the CityInspect portal.
Applies to: Residential Addition / Remodel Permit
- 1
Framing
Wall framing and MEP rough-in for the addition/remodel area.
- 2
Final
Completed addition/remodel work verified before close-out.
Applies to: Residential Deck Permit
- 1
Footing
Before concrete pour for deck footings.
- 2
Framing/Final
Deck framing and guardrail/handrail compliance verified before final sign-off.
Applies to: Residential Reroof Permit
- 1
Deck/Substrate
After tear-off, before underlayment.
- 2
Final
Completed reroof inspection scheduled via the CityInspect portal.
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing.
- 2
Solar Final
Completed solar installation inspection scheduled via the CityInspect portal.
Final inspection only: Change of Use / Change of Occupancy Review, EV Charger / EVSE Permit, Fire Alarm System Permit, Sign Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Roy building permits
Get alerts for Roy
We'll email you when Roy's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.