Residential Building Permit (One & Two Family Dwellings) — Roy, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://www.royutah.gov/departments/building_permits___inspections/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (One & Two Family Dwellings) in Roy, Utah
Required for new one- and two-family residential dwelling construction in Roy City, regulated by the state-mandated 2024 IBC and 2021 IRC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged). Fees are calculated from ICC Building Valuation Data applied to the 1997 UBC Table 1-A fee structure.
Verified 2026-07-03 · Source
When you need this permit
- New one- or two-family residential dwelling construction
- All permits must be applied for and processed online via the CityInspect / My City Inspector portal
- Any work regulated by the state-mandated 2024 IBC and 2021 IRC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 10 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing / Foundation
Standard sequence per adopted 2021 IBC/IRC inspection points; scheduled through the CityInspect / My City Inspector portal.
- 2
Framing
After framing, sheathing, and MEP rough-in complete.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final
All work complete; scheduled via the online portal prior to occupancy.
See the full Roy inspection guide — scheduling & re-inspection fees →
Tips
- Roy City requires ALL permits to be applied for online — there is no paper/in-person application path described in any of the city's own permit-information handouts.
- Initial plan review is completed within 14 business days of acceptance for review, per Roy City's own published handout language (repeated identically for both new dwellings and additions/remodels).
- Contact the Building Official (Gaile Supp, 801-774-1031, gaile.supp@royutah.gov) or City Planner (Steve Parkinson, 801-774-1027, sparkinson@royutah.gov) for plan-specific questions, per Roy City's permit information handouts.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Roy
Residential Building Permit (One & Two Family Dwellings) in other cities
Compare residential building permit (one & two family dwellings) fees across Utah →
Look up this fee in a different city →
Now live
Build your Roy project checklist
Describe your project once and get every permit, document, and fee it triggers in Roy — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →