Commercial Building Permit in Roy, Utah
Required for new commercial (primary structure) construction in Roy City, regulated by the state-mandated 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026). The Building Permit Fee uses the same Table 1-A (1997 Uniform Building Code) valuation formula as residential permits; Roy's Master Consolidated Fee Schedule publishes a dedicated 'Commercial Plan Check Fees' table charging 65% of the Building Fee for the primary structure.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction (primary structure)
- All permits must be applied for and processed online via the CityInspect / My City Inspector portal
- Any work regulated by the state-mandated 2024 IBC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
- Contractor license number (Utah DOPL) for all licensed-trade work Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Roy City Corporation Master Consolidated Fee Schedule (Ordinance No. Show full citationHide
Roy City Corporation Master Consolidated Fee Schedule (Ordinance No. 25-13), Community Development / Building Permit Fees: 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council... Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' Same formula used for both residential and commercial permits; no separate commercial dollar table is published.Review timeline
Inspection process
- 1
Footing / Foundation
Before concrete pour, per standard IBC inspection sequence enforced by Roy City; scheduled through the CityInspect / My City Inspector portal.
- 2
Underground / Under-Slab MEP
Plumbing, electrical, and mechanical rough-in below slab, before fill or pour.
- 3
Framing / Four-Way Rough-In
After framing, sheathing, roof, and MEP rough-in complete.
- 4
Insulation
After insulation installed, before drywall/wall coverings.
- 5
Final / Certificate of Occupancy
All work complete; scheduled via the online portal prior to occupancy.
See the full Roy inspection guide — scheduling & re-inspection fees →
Tips
- Roy's 'Commercial Plan Check Fees' table charges the identical 65% rate for both 'Primary Structure' (new commercial building permit) and 'TI's, Remodels, Accessory Buildings' — the plan-check percentage does not change based on whether the work is new construction or a tenant improvement.
- No commercial-specific plan-review turnaround time is published by Roy City; only the 14-business-day residential figure is confirmed in the city's handouts.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Roy.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Roy's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Roy yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Roy lands. Privacy.
Other permits in Roy
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Roy project checklist
Describe your project once and get every permit, document, and fee it triggers in Roy — in one checklist. Free, for any city and any number of projects.