Commercial Building Permit in Roy, Utah
Required for new commercial (primary structure) construction in Roy City, regulated by the state-mandated 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026). The Building Permit Fee uses the same Table 1-A (1997 Uniform Building Code) valuation formula as residential permits; Roy's Master Consolidated Fee Schedule publishes a dedicated 'Commercial Plan Check Fees' table charging 65% of the Building Fee for the primary structure.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction (primary structure)
- All permits must be applied for and processed online via the CityInspect / My City Inspector portal
- Any work regulated by the state-mandated 2024 IBC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
- Contractor license number (Utah DOPL) for all licensed-trade work Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing / Foundation
Before concrete pour, per standard IBC inspection sequence enforced by Roy City; scheduled through the CityInspect / My City Inspector portal.
- 2
Underground / Under-Slab MEP
Plumbing, electrical, and mechanical rough-in below slab, before fill or pour.
- 3
Framing / Four-Way Rough-In
After framing, sheathing, roof, and MEP rough-in complete.
- 4
Insulation
After insulation installed, before drywall/wall coverings.
- 5
Final / Certificate of Occupancy
All work complete; scheduled via the online portal prior to occupancy.
See the full Roy inspection guide — scheduling & re-inspection fees →
Tips
- Roy's 'Commercial Plan Check Fees' table charges the identical 65% rate for both 'Primary Structure' (new commercial building permit) and 'TI's, Remodels, Accessory Buildings' — the plan-check percentage does not change based on whether the work is new construction or a tenant improvement.
- No commercial-specific plan-review turnaround time is published by Roy City; only the 14-business-day residential figure is confirmed in the city's handouts.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Roy.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Roy
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Roy project checklist
Describe your project once and get every permit, document, and fee it triggers in Roy — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →