Electrical / Plumbing / Mechanical Permit — Roy, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://cms7files1.revize.com/roycityut/Government/transparency/Consolidated%20Fee%20Schedule.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical / Plumbing / Mechanical Permit in Roy, Utah
Required for standalone electrical, plumbing, or mechanical work in Roy City not part of a larger valuation-based building permit. Roy City bundles these three trades under a single flat fee line in its Master Consolidated Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; a direct text search of Roy City's full Master Consolidated Fee Schedule PDF found no EV-, EVSE-, or electric-vehicle-specific line item — the standard $50.00 + State Fee combined trade-permit fee applies.
Verified 2026-07-03 · Source
When you need this permit
- New electrical circuits/wiring, plumbing fixture work, or mechanical (HVAC) installation not covered under a separate building permit
- All permits applied for online via CityInspect / My City Inspector
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Roy City Master Consolidated Fee Schedule (Ordinance No. Show full citationHide
Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Mechanical, Plumbing, and Electrical Permits — $50.00 + State Fee ($25+$25 inspection fee).' Confirmed against the source PDF's table layout via direct page-image review (page 4 of the consolidated fee schedule PDF).Review timeline
Inspection process
- 1
Rough-In
Trade-specific rough-in inspection before closing walls.
- 2
Final
Final trade inspection scheduled via the CityInspect portal.
See the full Roy inspection guide — scheduling & re-inspection fees →
Tips
- Roy City bundles electrical, plumbing, and mechanical permits under one combined $50 + State Fee line item in its fee schedule rather than pricing each trade separately.
- Installing an EV charger (Level 2, 240V circuit) on an existing home is billed under this combined Electrical / Plumbing / Mechanical Permit — Roy City does not publish a separate EV-specific permit or fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fee schedules
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Roy's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Roy yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Roy lands. Privacy.
Other permits in Roy
Electrical / Plumbing / Mechanical Permit in other cities
Compare electrical / plumbing / mechanical permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Roy project checklist
Describe your project once and get every permit, document, and fee it triggers in Roy — in one checklist. Free, for any city and any number of projects.
Get started →