EV Charger / EVSE Permit — North Ogden, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://cms3.revize.com/revize/northogdencity/Documents/Departments/Finance%20Department/05-2026%20Consolidated%20Fee%20Schedule%20-%20Permanent.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in North Ogden, Utah
North Ogden has no distinct EV charger/EVSE permit type or fee line item — installing electric vehicle charging equipment is electrical work billed under the city's single integrated Building Permit Fee (1997 Uniform Building Code, Section 107.2 Table 1A, plus a 20% surcharge), the same valuation-based schedule used for all building, electrical, plumbing, and mechanical work in North Ogden (there is no separate 'Electrical Permit' type in the city's own permit catalog). A direct review of the city's current Consolidated Fee Schedule (Resolution 05-2026, effective document '05-2026 Consolidated Fee Schedule - Permanent.pdf') found no 'EV,' 'electric vehicle,' or 'EVSE' line item anywhere in the document.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in North Ogden
- New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
- Building Permit Application submitted through North Ogden's Building Department (iworq portal, cityofnorthogden.portal.iworq.net)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Temporary Power / Electrical Inspection
Electrical inspection of the new circuit and charger connection, administered by the Building Department; billed at the same rate as the city's Temporary Power Inspection ($56.40) where applicable.
See the full North Ogden inspection guide — scheduling & re-inspection fees →
Tips
- North Ogden does not have a separate 'Electrical Permit' permit type at all — building, electrical, plumbing, and mechanical work (including EV charger installation) are all billed under the single valuation-based Building Permit Fee (1997 UBC Table 1A + 20%).
- The Minimum Building Permit Fee is $56.40 — a low-valuation scope like a single EV charger circuit would likely be billed at or near this minimum, but confirm with the Building Department (801-737-9800) before applying.
- A 1% state surcharge and a Plan Check Fee (50% residential / 65% commercial of the permit fee) apply on top of the base valuation-based fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in North Ogden
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →