Residential/Commercial Building Permit in North Ogden, Utah

Required for new construction, additions, remodels, repairs, re-roofing/siding, electrical remodeling, plumbing replacement, and furnace/AC replacement in North Ogden. Both the Single-Family Residential Permit and Commercial Building Permit fee are valuation-based, calculated per the 1997 Uniform Building Code Section 107.2 Table 1-A plus 20%, per the city's official Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026 — the current edition; the previously-cited Resolution 03-2026 PDF link went dead and was confirmed superseded on 2026-07-13).

Verified 2026-07-19 · Source

When you need this permit

  • New construction, additions, remodels, and repairs including re-roofing/siding, electrical remodeling, plumbing replacement, furnace/AC replacement
  • Commercial structures, additions to or structural remodels of commercial buildings, and non-structural commercial remodels over 3,000 sq ft require a stamp/seal by a State-licensed professional Contractor
  • Residential Plan Check Fee Deposit of $500.00, or Commercial Plan Check Fee Deposit of $1,000.00, due at submittal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single-Family Residential Permit and Commercial Building Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and Commercial Building Permit Fees ... 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%.' North Ogden does not publish its own flat valuation table; the 1997 UBC Table 1-A (plus a 20% surcharge) is the governing figure. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Valuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%
Residential Plan Check Fee DepositNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$500.00
Commercial Plan Check Fee DepositNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$1,000.00
Single-Family Residential Plan CheckNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
50% of Permit Fee
Commercial Building Plan CheckNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
65% of Permit Fee
State FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
1% of Permit Fee
Minimum Building Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$56.40
Re-inspection FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$56.40
After-Hours/Emergency InspectionNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$125.00
Temporary Power InspectionNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$56.40
Stop Work (Red Tag) — Failure to Obtain a Building PermitNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$250.00 first offense, $1,000.00 each additional offense (regardless of project type, unless emergency-related)
Deposit for Off-Site Improvements (all new construction)North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition). SUPERSEDED FIGURE: Resolution 03-2026 (adopted January 13, 2026) published this deposit at $1,000.00; confirmed via direct page-3 comparison of both editions (03-2026 recovered via Wayback Machine snapshot dated 2026-01-17, since its live PDF now 404s) that Resolution 05-2026 raised it to $1,500.00. Genuine fee increase, not a citation error. Change identified and figure updated 2026-07-13.
$1,500.00
Impact Fees (single-family residential, illustrative components)North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Impact Fee Summary (page 13-14). All figures unchanged from the 03-2026 edition except the Central Weber Improvement Sewer District (CWSID) single-family sewer impact fee: the Impact Fee Summary table itself publishes a scheduled step-up from $3,537.00 to $3,575.00 'effective July 1, 2026.' As of this 2026-07-13 verification, that effective date has passed, so $3,575.00 is now the governing figure; $3,537.00 is retained parenthetically as the pre-July-1-2026 rate for historical reference. Multi-family and 'Additional Dwelling Unit (ADU)' rows in the same table publish different, lower per-unit or per-square-foot rates (e.g., ADU Water $4,893.50, ADU Sewer $681.10, ADU Fire $236.53, ADU Transportation $915.19) — these are impact-fee-schedule tiers by dwelling type, not a separate 'ADU permit' application fee.
Storm Water $2,186.49; Water $6,273.70; Sewer $873.20; Sewer (CWSID) $3,575.00 (effective July 1, 2026; $3,537.00 prior to that date); Parks $6,017.26; Public Safety $388.93; Transportation $2,297.37; Fire $477.85

Review timeline

Plan review
Not published — contact the department

How long did your Residential/Commercial Building Permit permit actually take in North Ogden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building/Electrical/Mechanical/Plumbing Inspections

    Scheduled through the Building Department, (801) 737-9837 or (801) 737-2218, Monday–Thursday 8:00 AM–5:00 PM and Friday 8:00 AM–1:00 PM. No published minimum advance-notice window was found (unlike Highland's 24-hour requirement).

See the full North Ogden inspection guide — scheduling & re-inspection fees →

Tips

  • North Ogden calculates its Building Permit Fee off the 1997 Uniform Building Code Table 1-A (plus a 20% surcharge) rather than a current-edition ICC valuation table or its own self-published flat schedule — an older reference standard than several neighboring Utah cities use.
  • A Stop Work (Red Tag) for building without a permit carries a steep escalation: $250 for a first offense, jumping to $1,000 for each additional offense.
  • Impact fees differ significantly by dwelling classification (single-family vs. multi-family vs. ADU) — always confirm which tier applies before budgeting for a project.
  • The Deposit for Off-Site Improvements (all new construction) rose from $1,000.00 to $1,500.00 when Resolution 05-2026 superseded Resolution 03-2026 in May 2026 — budget for the higher figure.
  • Residential rooftop and ground-mount solar PV installations fall under this same general valuation-based Building/Electrical Permit — a full review of the Resolution 05-2026 Consolidated Fee Schedule's Building Department section (2026-07-19) and North Ogden's official Building Codes page found no distinct solar-specific permit type, fee line item, or process description; confirm current requirements directly with the Building Department, (801) 737-9837, before applying.
  • North Ogden has no distinct EV charger / EVSE permit type or fee either: the same Resolution 05-2026 Consolidated Fee Schedule PDF was re-checked directly (fetched and searched 2026-07-20) and contains zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' A residential EV charger install is expected to fall under this same general valuation-based Building/Electrical Permit as standard electrical work; confirm directly with the Building Department, (801) 737-9837, before applying.

Frequently asked questions

North Ogden requires a residential/commercial building permit for: New construction, additions, remodels, and repairs including re-roofing/siding, electrical remodeling, plumbing replacement, furnace/AC replacement; Commercial structures, additions to or structural remodels of commercial buildings, and non-structural commercial remodels over 3,000 sq ft require a stamp/seal by a State-licensed professional; Residential Plan Check Fee Deposit of $500.00, or Commercial Plan Check Fee Deposit of $1,000.00, due at submittal. If your project isn't listed, confirm with North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 before starting work.

Per North Ogden City's official Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026), both the Single-Family Residential Permit and Commercial Building Permit fees are calculated using the 1997 version of the Uniform Building Code, Section 107.2, Table 1-A, plus a 20% surcharge. A $500 Residential (or $1,000 Commercial) Plan Check Fee Deposit is due at submittal, plus a 1% State Fee on the permit fee.

North Ogden does not publish a plan-review timeline for this permit. Contact North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 for current turnaround.

You'll need: Building Permit Application (iWorQ portal). See the required-documents checklist on this page for details on each.

North Ogden requires 1 inspection(s) for a residential/commercial building permit, in order: Building/Electrical/Mechanical/Plumbing Inspections. Schedule each through North Ogden City Building Department ((801) 737-9837 or (801) 737-2218).

Apply through North Ogden City Building Department at 505 E 2600 North, North Ogden, UT 84414. Phone: (801) 737-9837 or (801) 737-2218, email: building@northogdencity.gov. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 1:00 PM, per the city's official Building Codes page and Finance Department contact block (consistent hours published city-wide).. Official information: https://northogdencity.gov/departments/building/building_codes.php.

North Ogden, Utah has adopted: North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).; Statewide framework per Utah Code § 15A-2-103: as of the code cycle effective July 1, 2026 (confirmed current as of this 2026-07-16 re-verification), the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle, § 15A-2-103(1)(b)), the 2024 International Building Code (IBC, § 15A-2-103(1)(a)), the 2023 National Electrical Code (NEC, continuing from the prior cycle, § 15A-2-103(1)(g)), and other 2024 International Codes (IPC, IMC, IFGC, IEBC, IECC, and the residential provisions of the ISPSC, per § 15A-2-103(1)(d)/(e)/(f)/(i)/(h)/(n)) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows ('recognizes the current adopted Utah State Building Code'), without asserting North Ogden has separately re-published each edition/year. This entry was already correctly stated in present tense as of the prior verification and required no substantive correction on this pass.; Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'. Local amendments apply — see the North Ogden overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.