Solar / Solar PV Installation Permit in North Ogden, Utah

North Ogden has no distinct solar or solar PV installation permit type or fee line item — rooftop and ground-mount solar installations are processed under the city's single integrated Building Permit Fee (1997 Uniform Building Code, Section 107.2 Table 1A, plus a 20% surcharge), the same valuation-based schedule used for all building, electrical, plumbing, and mechanical work in North Ogden. The city's own Building Department index page (northogdencity.com/departments/building/index.php) explicitly names this activity, stating: 'The Building Department issues permits for new constructions, additions, remodels, repairs, and solar installations for existing structures.' A direct, full page-by-page review of the current 15-page Consolidated Fee Schedule (Resolution 05-2026, effective May 13, 2026) found zero mentions of 'solar,' 'photovoltaic,' 'PV,' or 'renewable energy' anywhere in the document.

Verified 2026-07-21 · Source

When you need this permit

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system on an existing residential or commercial structure in North Ogden
  • Compliance with the statewide-adopted 2024 International Building Code and 2023 National Electrical Code structural and electrical provisions (Utah Code § 15A-2-103), since North Ogden does not publish separate solar-specific structural or fire-setback standards
  • Building Permit Application submitted through North Ogden's Building Department (iWorQ portal, cityofnorthogden.portal.iworq.net)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, covers solar PV installation scope)North Ogden Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026, '05-2026 Consolidated Fee Schedule - Permanent.pdf'), Building Permit Fees section: 'Single-Family Residential Permit and Commercial Building Permit Fees — 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%' and 'Minimum Building Permit Fee $56.40.' No distinct solar-specific fee line exists anywhere in the 15-page document (confirmed via direct full-document review, 2026-07-21).
1997 Uniform Building Code, Section 107.2 Table 1A, plus 20%; Minimum Building Permit Fee $56.40
Plan Check FeeNorth Ogden Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
Residential: 50% of Permit Fee; Commercial: 65% of Permit Fee
State FeeNorth Ogden Consolidated Fee Schedule, Resolution 05-2026, Building Permit Fees section.
1% of Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Solar / Solar PV Installation Permit permit actually take in North Ogden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building/Electrical Inspection

    Inspection of the mounting/structural attachment and electrical interconnection, administered by the Building Department, (801) 737-9837 or (801) 737-2218, Monday–Thursday 8:00 AM–5:00 PM and Friday 8:00 AM–1:00 PM.

See the full North Ogden inspection guide — scheduling & re-inspection fees →

Tips

  • North Ogden's own Building Department index page lists 'solar installations for existing structures' among the activities it issues permits for, in the same sentence as new construction, additions, remodels, and repairs — confirming solar goes through the same general Building Permit intake rather than a separate solar-specific application.
  • There is no separate 'Electrical Permit' or 'Solar Permit' type in North Ogden's permit catalog — a solar PV installation is billed under the single valuation-based Building Permit Fee (1997 UBC Table 1A + 20%, minimum $56.40), the same schedule used for all trades citywide.
  • A 1% state surcharge and a Plan Check Fee (50% residential / 65% commercial of the permit fee) apply on top of the base valuation-based fee.
  • Confirm project-specific scope (e.g., whether a structural stamp/seal is required for the roof-mount attachment) directly with the Building Department, (801) 737-9837 or building@northogdencity.gov, before applying.

Frequently asked questions

North Ogden requires a solar / solar pv installation permit for: Installation of a rooftop or ground-mount solar photovoltaic (PV) system on an existing residential or commercial structure in North Ogden; Compliance with the statewide-adopted 2024 International Building Code and 2023 National Electrical Code structural and electrical provisions (Utah Code § 15A-2-103), since North Ogden does not publish separate solar-specific structural or fire-setback standards; Building Permit Application submitted through North Ogden's Building Department (iWorQ portal, cityofnorthogden.portal.iworq.net). If your project isn't listed, confirm with North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 before starting work.

No. North Ogden's Consolidated Fee Schedule (Resolution 05-2026) has no distinct solar, photovoltaic, PV, or renewable-energy fee line item. The city's Building Department index page states it issues permits for 'new constructions, additions, remodels, repairs, and solar installations for existing structures' — solar work is billed under the same integrated Building Permit Fee (1997 UBC Section 107.2 Table 1A plus 20%, minimum $56.40) used for all other building and electrical work.

North Ogden does not publish a plan-review timeline for this permit. Contact North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

North Ogden requires 1 inspection(s) for a solar / solar pv installation permit, in order: Building/Electrical Inspection. Schedule each through North Ogden City Building Department ((801) 737-9837 or (801) 737-2218).

Apply through North Ogden City Building Department at 505 E 2600 North, North Ogden, UT 84414. Phone: (801) 737-9837 or (801) 737-2218, email: building@northogdencity.gov. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 1:00 PM, per the city's official Building Codes page and Finance Department contact block (consistent hours published city-wide).. Official information: https://northogdencity.gov/departments/building/building_codes.php.

North Ogden, Utah has adopted: North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).; Statewide framework per Utah Code § 15A-2-103: as of the code cycle effective July 1, 2026 (confirmed current as of this 2026-07-16 re-verification), the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle, § 15A-2-103(1)(b)), the 2024 International Building Code (IBC, § 15A-2-103(1)(a)), the 2023 National Electrical Code (NEC, continuing from the prior cycle, § 15A-2-103(1)(g)), and other 2024 International Codes (IPC, IMC, IFGC, IEBC, IECC, and the residential provisions of the ISPSC, per § 15A-2-103(1)(d)/(e)/(f)/(i)/(h)/(n)) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows ('recognizes the current adopted Utah State Building Code'), without asserting North Ogden has separately re-published each edition/year. This entry was already correctly stated in present tense as of the prior verification and required no substantive correction on this pass.; Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'. Local amendments apply — see the North Ogden overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.