Skip to main content
PermitBase

Land Use Permit in North Ogden, Utah

North Ogden's Consolidated Fee Schedule publishes a single flat 'Land Use Permits' fee under the Planning Department section, distinct from the valuation-based Building Permit Fee. The city's official published sources do not break this category down into named sub-types (e.g., fence, shed, deck, retaining wall) the way some neighboring Utah cities' fee schedules do — it is published as one line item.

Reviewed 2026-07-13 · Source

When you need this permit

  • Applies to land-use-related permits reviewed by the Planning Department, submitted via the iWorQ online portal (cityofnorthogdenhome.portal.iworq.net)
  • The city's official Applications and Forms pages route all Planning and Zoning permit types through the iWorQ portal rather than publishing individually named PDF applications for accessory structures

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Land Use PermitsNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Planning Department section: 'Land Use Permits ... $40.00.' This is the only Planning-Department-level permit fee published as a flat, non-valuation-based amount besides the Zoning Verification Letter ($25.00) and Re-build Letter ($25.00). Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
$40.00

Review timeline

Plan review
Not published — contact the department

How long did your Land Use Permit permit actually take in North Ogden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full North Ogden inspection guide — scheduling & re-inspection fees →

    Tips

    • Unlike Highland City (which separately itemizes fence, retaining wall, pool, and ADU fees), North Ogden's official fee schedule bundles Planning-Department-level land-use approvals for accessory features into one $40.00 'Land Use Permits' line — always confirm with the Building/Planning Department by phone which specific project types this covers before assuming it applies to a given accessory structure.
    • Contact the Planning Department directly at (801) 782-7211 or planning@northogdencity.gov to confirm whether a specific project (e.g., a fence or shed) requires this Land Use Permit, a Building Permit, or both.
    • Signs are not broken out as a separate permit type or fee in North Ogden's official Consolidated Fee Schedule (Resolution 05-2026) — the Planning Department fee section lists only the flat $40.00 'Land Use Permits' line, with no distinct sign-permit fee found. Confirm with the Building/Planning Department whether a specific sign falls under this Land Use Permit or a separate process.

    Frequently asked questions

    North Ogden requires a land use permit for: Applies to land-use-related permits reviewed by the Planning Department, submitted via the iWorQ online portal (cityofnorthogdenhome.portal.iworq.net); The city's official Applications and Forms pages route all Planning and Zoning permit types through the iWorQ portal rather than publishing individually named PDF applications for accessory structures. If your project isn't listed, confirm with North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 before starting work.

    North Ogden's official Consolidated Fee Schedule (Resolution 05-2026, current edition) does not publish a fence-specific, shed-specific, or ADU-specific permit fee. The closest published category is a flat $40.00 'Land Use Permits' fee under the Planning Department section. Applicants should confirm the applicable permit type directly with the Building Department at (801) 737-9837.

    North Ogden does not publish a plan-review timeline for this permit. Contact North Ogden City Building Department at (801) 737-9837 or (801) 737-2218 for current turnaround.

    You'll need: Land Use Permit Application (iWorQ portal). See the required-documents checklist on this page for details on each.

    Apply through North Ogden City Building Department at 505 E 2600 North, North Ogden, UT 84414. Phone: (801) 737-9837 or (801) 737-2218, email: building@northogdencity.gov. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 1:00 PM, per the city's official Building Codes page and Finance Department contact block (consistent hours published city-wide).. Official information: https://northogdencity.gov/departments/building/building_codes.php.

    North Ogden, Utah has adopted: North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).; Statewide framework per Utah Code § 15A-2-103: as of the code cycle effective July 1, 2026 (confirmed current as of this 2026-07-16 re-verification), the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle, § 15A-2-103(1)(b)), the 2024 International Building Code (IBC, § 15A-2-103(1)(a)), the 2023 National Electrical Code (NEC, continuing from the prior cycle, § 15A-2-103(1)(g)), and other 2024 International Codes (IPC, IMC, IFGC, IEBC, IECC, and the residential provisions of the ISPSC, per § 15A-2-103(1)(d)/(e)/(f)/(i)/(h)/(n)) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows ('recognizes the current adopted Utah State Building Code'), without asserting North Ogden has separately re-published each edition/year. This entry was already correctly stated in present tense as of the prior verification and required no substantive correction on this pass.; Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'. Local amendments apply — see the North Ogden overview page for the full list.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-07-13.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.