Skip to main content
PermitBase

This is PermitBase’s published record for Riverdale as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Riverdale building permits

Verified

Riverdale, Utah — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 International Residential Code (IRC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 International Mechanical Code (IMC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 International Plumbing Code (IPC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 International Fuel Gas Code (IFGC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 International Energy Conservation Code (IECC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.2024 National Electrical Code (NEC) — effective July 1, 2026, per Riverdale City's official Building Inspections page.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction and any work regulated by the adopted 2024 IRC/IBC (effective July 1, 2026) in Riverdale City. Applications are submitted through the city's cityinspect.com online portal. Fees are calculated from Riverdale's own valuation-based Building and Sign Permit Fee Schedule, plus a 65% Plan Check Fee and a 1% State of Utah Fee.

Verified 2026-07-08 · Source

Requirements

  • New single-family or two-family residential construction
  • Any work regulated by the adopted 2024 IRC
  • Structural modifications regulated by the adopted 2024 IBC/IRC
  • Submission through the city's online portal (utah.cityinspect.com) with project valuation, site/parcel information, and owner information
  • Owner-Builder Affidavit required if the property owner is acting as their own contractor (per Riverdale's official Owner-Builder Form, acknowledging Utah Construction Trades Licensing Act liability)

Required documents

  • RequiredBuilding Permit ApplicationRiverdale City's official Building Permit form, capturing job site information (address, subdivision/lot, parcel number, zone, setbacks), owner information, valuation, square footage, occupancy group, construction type, and flood plain status. Submitted via the cityinspect.com online portal.
  • RequiredSite PlanSite plan showing lot dimensions, setbacks, and structure placement, referenced on the Building Permit application form (Minimum Setbacks F/S/S/R field).
  • OptionalOwner-Builder AffidavitRequired only when the property owner is pulling the permit as their own general contractor rather than using a licensed contractor; the signed form acknowledges $2,000/day liability for violating the Utah Construction Trades Licensing Act.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Riverdale City Building and Sign Permit Fee Schedule)$1–$1,100: $48.36. Scales up through published valuation brackets (e.g., $23,001–$25,000: $469.50; $50,000: $773.10; $99,001–$100,000: $1,192.50). $100,000–$500,000: $1,192.50 for the first $100,000 plus $6.75 per additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction thereof. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.40 per additional $1,000 or fraction thereof.Riverdale City Building and Sign Permit Fee Schedule (official PDF, Community Development Department). Full valuation table retrieved directly from the city's own fee-schedule document.
Plan Check Fee65% of the Building Permit FeeRiverdale City Building and Sign Permit Fee Schedule: 'Plan Check Fee: 65% of Permit Fee.'
State of Utah Fee1% of the Building Permit FeeRiverdale City Building and Sign Permit Fee Schedule: 'State of Utah Fee: 1% of Permit Fee.' This is the statewide Uniform Building Standards Act surcharge collected by all Utah municipalities.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/weber-county/riverdale/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 7722fee

Reproducible from PermitBase’s version-controlled dataset, commit 7722fee.