Riverdale building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Riverdale, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
4600 South Weber River Drive, Riverdale, Utah 84405
Phone
(801) 394-5541 ext. 1276
Office hours

Inspection guide

See how inspections work in Riverdale — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a). Consistent with Riverdale City's official Building Inspections page, which states: '2024 International Building Code (IBC) (Effective July 1, 2026, the 2024 codes will be required).'
  • 2021 International Residential Code (IRC) — CORRECTED. Utah Code § 15A-2-103(1)(b) did NOT change the IRC edition in the 7/1/2026 statewide amendment; the IRC REMAINS the 2021 edition. Riverdale City's own official Building Inspections page (live-checked 2026-07-16, HTTP 200, 51531 bytes) states verbatim: '2024 International Residential Code (IRC)' — this is factually WRONG; no provision of § 15A-2-103 adopts a 2024 IRC. This entry previously repeated the City's incorrect 2024 figure; the statute controls and the correct current edition is 2021. The City's incorrect claim is preserved here as a recorded conflict, not deleted — see the dated note below and the matching sibling defect on syracuse-ut's page, which similarly asserts an incorrect 2024/unchanged-2024 IRC.
  • Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Riverdale's own Building Inspections page, added here per statute.
  • 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e). Consistent with Riverdale's official Building Inspections page: '2024 International Mechanical Code (IMC) (Effective July 1, 2026, the 2024 codes will be required).'
  • 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d). Consistent with Riverdale's official Building Inspections page: '2024 International Plumbing Code (IPC) (Effective July 1, 2026, the 2024 codes will be required).'
  • 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f). Consistent with Riverdale's official Building Inspections page, which lists it (with an apparent typo, 'IG' rather than 'IFGC') as: '2024 International Fuel Gas Code (IG) (Effective July 1, 2026, the 2024 codes will be required).'
  • 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h). Consistent with Riverdale's official Building Inspections page: '2024 International Energy Conservation Code (IECC) (Effective July 1, 2026, the 2024 codes will be required).'
  • 2023 National Electrical Code (NEC) — CORRECTED. Utah Code § 15A-2-103(1)(g) did NOT change the NEC edition in the 7/1/2026 statewide amendment; the NEC REMAINS the 2023 edition (unchanged since before this cycle). Riverdale City's own official Building Inspections page (live-checked 2026-07-16, HTTP 200, 51531 bytes) states verbatim: '2024 National Electrical Code (NEC) remains in effect' — this is factually WRONG on two counts: no provision of § 15A-2-103 adopts a 2024 NEC, and the word 'remains' is itself incorrect since the statewide NEC has never been the 2024 edition. This entry previously repeated the City's incorrect 2024 figure; the statute controls and the correct current edition is 2023. The City's incorrect claim is preserved here as a recorded conflict, not deleted — see the dated note below and the matching sibling defect on syracuse-ut's page.
  • 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.
  • MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.
  • NOTE (2026-07-16 re-verification — City page vs. statute conflict): Riverdale City's official Building Inspections page (riverdaleutah.gov/business/building_inspections/index.php, live-checked 2026-07-16, HTTP 200, 51531 bytes) is headed 'Building Code Changes - Effective July 1, 2026' and states verbatim: 'Effective July 1, 2026, the State of Utah adopted the following statewide codes: 2024 International Building Code (IBC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Residential Code (IRC) / 2024 International Mechanical Code (IMC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Plumbing Code (IPC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Fuel Gas Code (IG) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Energy Conservation Code (IECC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 National Electrical Code (NEC) remains in effect.' Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027, read live 2026-07-16) does NOT adopt a 2024 IRC or a 2024 NEC — the statute keeps the IRC at 2021 (§(1)(b), unchanged) and the NEC at 2023 (§(1)(g), unchanged). Riverdale's own page is simply incorrect on these two codes (the IBC/IMC/IPC/IFGC/IECC entries at 2024 are all correct and consistent with the statute). This mirrors a documented pattern on sibling jurisdiction syracuse-ut, whose own page similarly misstates the IRC. The statute governs; the City's page text is quoted above and preserved as the recorded conflict, not deleted or silently corrected without explanation.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
4units

4 buildings · $2.3M valuation

Trailing 12 months
20units

11 of 12 months reported · #82 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
9units

9 buildings · $4.8M valuation

5 month(s) reported to Census

Full year 2025
69units

39 buildings · $14.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Riverdale City's official domain is now riverdaleutah.gov — the legacy riverdalecity.com domain 301/302-redirects to it (e.g., riverdalecity.com/permits--applications.html redirects to riverdaleutah.gov/permits--applications.html). Use riverdaleutah.gov going forward.
  • Riverdale's Community Development Department is an independent city department (not contracted to Weber County) located at 4600 South Weber River Drive in the Riverdale Civic Center, directed by Brandon Cooper (bcooper@riverdaleutah.gov).
  • All building, sign, and Right-of-Way permit applications go through the cityinspect.com portal (utah.cityinspect.com) — the city no longer accepts paper-only submissions as the primary intake method.
  • Riverdale's fee structure stacks three charges: base valuation-based Building Permit Fee, + 65% Plan Check Fee, + 1% State of Utah Fee — total cost is roughly 1.66x the base table figure.
  • WARNING — CITY PAGE ERROR: Riverdale's own Building Inspections page (live-checked 2026-07-16) incorrectly states a '2024 International Residential Code (IRC)' and that the '2024 National Electrical Code (NEC) remains in effect.' Neither is correct: Utah Code § 15A-2-103 keeps the IRC at 2021 (§(1)(b), unchanged by the 7/1/2026 amendment) and the NEC at 2023 (§(1)(g), also unchanged) — there is no 2024 NEC edition and the statute has never adopted one. Riverdale's IBC, IMC, IPC, IFGC, and IECC entries at 2024 ARE correct and consistent with the statute. See the codesAdopted NOTE for the exact quoted city-page text and full statutory citation.
  • No Riverdale-specific published plan-review turnaround time was located in official sources as of 2026-07-08 — the residential-building-permit entry's 14-business-day reviewTimelineDays is grounded in the statutory floor, Utah Code 10-20-909(4)(a), rather than a city-published SLA.
  • Riverdale's own Building Inspections page notes that its inspection schedule generally fills up one to two days ahead of time, and that Utah Code 10-20-909(2)(b) entitles applicants to a third-party inspector if the city cannot inspect within three business days of a request (written notice to the Building Official required first).

Comparable nearby cities

Washington Terrace
Both in Weber County8 shared permit types~1 mi away
Compare fees →
Ogden
Both in Weber County8 shared permit types~4 mi away
Compare fees →
South Ogden
Both in Weber County7 shared permit types~2 mi away
Compare fees →