Residential Building Permit — Riverdale, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.riverdaleutah.gov/Documents/Department/Community%20Development/Forms%20and%20Permits/%20Community%20Development/building_permit_fee_schedule.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Riverdale, Utah
Required for new single-family and two-family residential construction and any work regulated by the adopted 2024 IBC / 2021 IRC in Riverdale City (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b) — Riverdale's own Building Inspections page incorrectly states a 2024 IRC, see codesAdopted note). Applications are submitted through the city's cityinspect.com online portal. Fees are calculated from Riverdale's own valuation-based Building and Sign Permit Fee Schedule, plus a 65% Plan Check Fee and a 1% State of Utah Fee.
Verified 2026-07-20 · Source
When you need this permit
- New single-family or two-family residential construction
- Any work regulated by the adopted 2021 IRC (statute-current edition; Riverdale's own page incorrectly states 2024 — see codesAdopted note)
- Structural modifications regulated by the adopted 2024 IBC / 2021 IRC
- Submission through the city's online portal (utah.cityinspect.com) with project valuation, site/parcel information, and owner information
- Owner-Builder Affidavit required if the property owner is acting as their own contractor (per Riverdale's official Owner-Builder Form, acknowledging Utah Construction Trades Licensing Act liability) Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Required inspection prior to placing concrete, per Riverdale's official Building Inspections page list of typical required inspections.
- 2
Underground Plumbing
Required inspection of underground plumbing lines before backfill, per Riverdale's official Building Inspections page.
- 3
Framing / Electrical / Plumbing / Mechanical
Combined rough-in inspection of framing and MEP trades, per Riverdale's official Building Inspections page.
- 4
Insulation
Required inspection of insulation installation prior to covering, per Riverdale's official Building Inspections page.
- 5
Final
Final site inspection required for occupancy, per Riverdale's official Building Inspections page. Scheduled via the cityinspect.com portal or by calling ext. 1276; the city notes its inspection schedule generally fills up one to two days ahead of time.
See the full Riverdale inspection guide — scheduling & re-inspection fees →
Tips
- Building, sign, and Right-of-Way permits are submitted online through Riverdale's cityinspect.com portal (utah.cityinspect.com) — first-time users must register with email, name, and phone number.
- Riverdale's inspection schedule generally fills up one to two days ahead of time, per the city's own Building Inspections page — schedule early.
- If the city cannot complete a requested building inspection within three business days, Utah Code 10-20-909(2)(b) allows the permit applicant to engage a third-party inspection firm from the state's approved list — Riverdale's Building Inspections page requires written notification to the City Building Official before doing so.
- Only the licensed general contractor is generally required to pull the building permit; regulated subcontractors (electrical, plumbing, mechanical) are typically covered under the general contractor's permit rather than pulling separate ones. Contractor
- Total permit cost is the base valuation-based Building Permit Fee, plus a 65% Plan Check Fee, plus a 1% State of Utah Fee — budget for roughly 66% above the base table figure.
- Riverdale does not publish a distinct solar/photovoltaic permit, checklist, or fee — the city's Community Development forms list (30+ documents) and Building Permit Fee Schedule contain no solar-specific line item, so a rooftop or ground-mounted solar PV installation is priced and processed under this general valuation-based Building Permit like any other electrical/structural work. No solar-specific mention was found on riverdaleutah.gov after a direct check (2026-07-19).
- Riverdale does not publish a distinct EV-charger/EVSE permit, checklist, or fee either — the city's Community Development forms list and Building Permit Fee Schedule (a purely valuation-based table with no trade-specific breakout) contain no EV-specific line item (re-checked 2026-07-20), so installing a home or commercial EV charger is priced and processed under this general valuation-based Building Permit, the same as solar PV above.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverdale
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →