Sign Permit in Riverdale, Utah

Required for erecting, adding to, moving, repairing, or changing the face of a sign in Riverdale City. Riverdale uses a dedicated Sign Permit Application, but charges the fee off the same valuation-based table as building permits — the city's official fee document is titled the 'Building and Sign Permit Fee Schedule.'

Verified 2026-07-20 · Source

When you need this permit

  • Site address, zone, name of business, and sign contractor with State license number
  • Type of sign and type of construction — explain if the work is a repair, addition, move, or face change
  • Valuation of the sign, used to calculate the fee off the same table used for building permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Fee (valuation-based)Riverdale City 'Building and Sign Permit Fee Schedule' (official PDF) — titled and structured as a single combined valuation table for both building and sign permits.
Same valuation table as building permits — e.g. $48.36 for the first $1,100 of valuation, rising in brackets (e.g. $773.10 at $50,000; $1,192.50 at $100,000), then $1,192.50 for the first $100,000 plus $6.75 per additional $1,000 (up to $500,000), $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 (up to $1,000,000), and $6,730.50 for the first $1,000,000 plus $4.40 per additional $1,000 above that.
Plan Check FeeRiverdale City 'Building and Sign Permit Fee Schedule': 'Plan Check Fee: 65% of Permit Fee.'
65% of Permit Fee
State of Utah FeeRiverdale City 'Building and Sign Permit Fee Schedule': 'State of Utah Fee: 1% of Permit Fee.'
1% of Permit Fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Riverdale building department
~1–10 business days

How long did your Sign Permit permit actually take in Riverdale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verification of installed sign against the approved permit and valuation-based scope.

See the full Riverdale inspection guide — scheduling & re-inspection fees →

Tips

  • Riverdale's fee schedule is literally titled the 'Building and Sign Permit Fee Schedule' — signs use the exact same valuation brackets as building permits, plus the same 65% plan check and 1% state fee add-ons.
  • The Sign Permit Application is a separate one-page form from the general Building Permit Application — apply for it specifically, listing sign valuation so staff can calculate the fee off the shared table.
  • Contact Riverdale City Community Development at 801-394-5541 ext. 1276 to confirm current valuation on your specific sign before applying.

Frequently asked questions

Riverdale requires a sign permit for: Site address, zone, name of business, and sign contractor with State license number; Type of sign and type of construction — explain if the work is a repair, addition, move, or face change; Valuation of the sign, used to calculate the fee off the same table used for building permits. If your project isn't listed, confirm with Riverdale City Community Development Department (Building Inspections Division) at (801) 394-5541 ext. 1276 before starting work.

Riverdale charges sign permits off the same valuation table as building permits, published as the 'Building and Sign Permit Fee Schedule.' For example, a $10,000 sign valuation falls at $217.50, plus a 65% plan check fee and 1% State of Utah fee. Contact Community Development at 801-394-5541 ext. 1276 for your project's specific valuation-based fee.

Plan review for a sign permit in Riverdale typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with Riverdale City Community Development Department (Building Inspections Division) at (801) 394-5541 ext. 1276.

You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

Riverdale requires 1 inspection(s) for a sign permit, in order: Final. Schedule each through Riverdale City Community Development Department (Building Inspections Division) ((801) 394-5541 ext. 1276).

Apply through Riverdale City Community Development Department (Building Inspections Division) at 4600 South Weber River Drive, Riverdale, Utah 84405. Phone: (801) 394-5541 ext. 1276, email: permits@riverdalecity.com. Official information: https://www.riverdaleutah.gov/department/community_development/index.php.

Riverdale, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a). Consistent with Riverdale City's official Building Inspections page, which states: '2024 International Building Code (IBC) (Effective July 1, 2026, the 2024 codes will be required).'; 2021 International Residential Code (IRC) — CORRECTED. Utah Code § 15A-2-103(1)(b) did NOT change the IRC edition in the 7/1/2026 statewide amendment; the IRC REMAINS the 2021 edition. Riverdale City's own official Building Inspections page (live-checked 2026-07-16, HTTP 200, 51531 bytes) states verbatim: '2024 International Residential Code (IRC)' — this is factually WRONG; no provision of § 15A-2-103 adopts a 2024 IRC. This entry previously repeated the City's incorrect 2024 figure; the statute controls and the correct current edition is 2021. The City's incorrect claim is preserved here as a recorded conflict, not deleted — see the dated note below and the matching sibling defect on syracuse-ut's page, which similarly asserts an incorrect 2024/unchanged-2024 IRC.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Riverdale's own Building Inspections page, added here per statute.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e). Consistent with Riverdale's official Building Inspections page: '2024 International Mechanical Code (IMC) (Effective July 1, 2026, the 2024 codes will be required).'; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d). Consistent with Riverdale's official Building Inspections page: '2024 International Plumbing Code (IPC) (Effective July 1, 2026, the 2024 codes will be required).'; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f). Consistent with Riverdale's official Building Inspections page, which lists it (with an apparent typo, 'IG' rather than 'IFGC') as: '2024 International Fuel Gas Code (IG) (Effective July 1, 2026, the 2024 codes will be required).'; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h). Consistent with Riverdale's official Building Inspections page: '2024 International Energy Conservation Code (IECC) (Effective July 1, 2026, the 2024 codes will be required).'; 2023 National Electrical Code (NEC) — CORRECTED. Utah Code § 15A-2-103(1)(g) did NOT change the NEC edition in the 7/1/2026 statewide amendment; the NEC REMAINS the 2023 edition (unchanged since before this cycle). Riverdale City's own official Building Inspections page (live-checked 2026-07-16, HTTP 200, 51531 bytes) states verbatim: '2024 National Electrical Code (NEC) remains in effect' — this is factually WRONG on two counts: no provision of § 15A-2-103 adopts a 2024 NEC, and the word 'remains' is itself incorrect since the statewide NEC has never been the 2024 edition. This entry previously repeated the City's incorrect 2024 figure; the statute controls and the correct current edition is 2023. The City's incorrect claim is preserved here as a recorded conflict, not deleted — see the dated note below and the matching sibling defect on syracuse-ut's page.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on Riverdale's own Building Inspections page, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification — City page vs. statute conflict): Riverdale City's official Building Inspections page (riverdaleutah.gov/business/building_inspections/index.php, live-checked 2026-07-16, HTTP 200, 51531 bytes) is headed 'Building Code Changes - Effective July 1, 2026' and states verbatim: 'Effective July 1, 2026, the State of Utah adopted the following statewide codes: 2024 International Building Code (IBC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Residential Code (IRC) / 2024 International Mechanical Code (IMC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Plumbing Code (IPC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Fuel Gas Code (IG) (Effective July 1, 2026, the 2024 codes will be required) / 2024 International Energy Conservation Code (IECC) (Effective July 1, 2026, the 2024 codes will be required) / 2024 National Electrical Code (NEC) remains in effect.' Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027, read live 2026-07-16) does NOT adopt a 2024 IRC or a 2024 NEC — the statute keeps the IRC at 2021 (§(1)(b), unchanged) and the NEC at 2023 (§(1)(g), unchanged). Riverdale's own page is simply incorrect on these two codes (the IBC/IMC/IPC/IFGC/IECC entries at 2024 are all correct and consistent with the statute). This mirrors a documented pattern on sibling jurisdiction syracuse-ut, whose own page similarly misstates the IRC. The statute governs; the City's page text is quoted above and preserved as the recorded conflict, not deleted or silently corrected without explanation.. Local amendments apply — see the Riverdale overview page for the full list.

Yes — Riverdale has a dedicated one-page Sign Permit Application (separate from the general Building Permit Application), covering site address, zone, business name, sign contractor and State license number, type of sign, and valuation.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.