Skip to main content
PermitBase

Deck Permit in Clarkston, Washington

Decks are a named category in Clarkston's permit fee matrix, listed separately as covered and uncovered. Residential decks fall under the 2021 IRC as adopted at CMC 15.05.010.

Reviewed 2026-09-16 · Source

When you need this permit

  • Built to the International Residential Code, 2021 Edition, as adopted by CMC 15.05.010
  • Design to a wind speed of 110 mph - CMC 15.05.010 inserts "Wind speed to 110 mph." at IRC Section R301.2(1)
  • Covered and uncovered decks are separate lines in the city's fee matrix

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building permit fee
FEE AMOUNTS ARE NOT PRINTED IN THIS GUIDE FOR CLARKSTON, AND THE REASON IS SPECIFIC. Show full citationFEE AMOUNTS ARE NOT PRINTED IN THIS GUIDE FOR CLARKSTON, AND THE REASON IS SPECIFIC. The fee matrix published in the online code at CMC 15.40.010 is attributed to "(Ord. 1735 Sec. 1 (Exh. A), 2025)". Ordinance No. 1744, adopted 10 August 2026, amends CMC 15.40 and repeals Ord. 1735. The code site's own banner reads "Includes legislation through 02-09-2026", so the matrix on display predates the amendment. The replacement amounts live in Exhibit A of the ordinance PDF, and that exhibit does not survive mechanical reading - its rows and its dollar figures come apart, so a real amount would be shown against the wrong kind of work. Ask the Building and Planning Department for the current matrix, or ask for Ordinance 1744 Exhibit A by name.
Not stated in this guide - see notes

Review timeline

Plan review
Not published — contact the department

How long did your Deck Permit permit actually take in Clarkston?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Clarkston states its wind speed without a gust label; a figure from a neighbouring city may be measured differently
    • Clarkston's code states no ground snow load, seismic design category or frost line depth in its IRC adoption - ask the city for those before you draw

    Frequently asked questions

    Clarkston requires a deck permit for: Built to the International Residential Code, 2021 Edition, as adopted by CMC 15.05.010; Design to a wind speed of 110 mph - CMC 15.05.010 inserts "Wind speed to 110 mph." at IRC Section R301.2(1); Covered and uncovered decks are separate lines in the city's fee matrix. If your project isn't listed, confirm with City of Clarkston - Building and Planning at (509) 758-1662 before starting work.

    In Clarkston, the published Building permit fee is: Not stated in this guide - see notes. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Clarkston does not publish a plan-review timeline for this permit. Contact City of Clarkston - Building and Planning at (509) 758-1662 for current turnaround.

    You'll need: Building permit application. See the required-documents checklist on this page for details on each.

    Apply through City of Clarkston - Building and Planning at Clarkston City Hall, 829 5th Street, Clarkston, WA 99403. Phone: (509) 758-1662, email: permits@clarkston-wa.com. Office hours: 8:00 a.m. - 5:00 p.m., Monday through Friday. Official information: https://clarkston-wa.com/departments/building-and-planning/.

    Clarkston, Washington has adopted: INTERNATIONAL BUILDING CODE, 2021 EDITION. CMC 15.04.010 adopts "the International Building Code, 2021 Edition, including Appendix Chapters E and I, as published by the International Code Council". (Ord. 1442, 2008; Ord. 1594, 2018; Ord. 1646, 2021; Ord. 1716, 2024); INTERNATIONAL RESIDENTIAL CODE, 2021 EDITION, WITH CHAPTERS CARVED OUT. CMC 15.05.010 adopts "the International Residential Code, 2021 Edition, including Appendix Chapters E, G and H, and specifically excluding Chapters 11 and 25 through 43". The exclusions matter: Chapter 11 is energy and Chapters 25 through 43 are the plumbing, mechanical and electrical provisions, and Clarkston adopts those separately. (Ord. 1441, 2008; Ord. 1598, 2018; Ord. 1650, 2021; Ord. 1712, 2024); Clarkston adopts each code in its own chapter rather than in one omnibus section: CMC 15.04 IBC, 15.05 IRC, 15.06 IEBC, 15.08 Electrical, 15.12 Uniform Plumbing, 15.28 IPMC, 15.32 IMC and 15.36 Energy Code.; RCW 19.27 - the Washington State Building Code applies statewide.. Local amendments apply — see the Clarkston overview page for the full list.

    CMC 15.05.010 revises IRC Section R301.2(1) to insert "Wind speed to 110 mph." That is the only one of the four design criteria the section states - it gives no ground snow load, seismic category or frost depth, so ask the city for those.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkston building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Clarkston's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Clarkston yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Clarkston lands. Privacy.

    Compare deck permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Clarkston project checklist

    Describe your project once and get every permit, document, and fee it triggers in Clarkston — in one checklist. Free, for any city and any number of projects.

    Get started →