Skip to main content
PermitBase

This is PermitBase’s published record for Snoqualmie as of 2026-09-15. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Snoqualmie building permits

Snoqualmie, Washington — as published 2026-09-15.

Reviewed 2026-09-15 · Source

Codes adopted

2021 International Building Code — adopted at SMC 15.04A.010: "The 2021 Edition of the International Building Code (IBC), including the adoption of ICC/ANSI A117.1-2021, requirements for Accessible and Usable Buildings and Facilities, as published by the International Code Council, as adopted by RCW 19.27.031 and as it may hereafter be adopted and/or amended by the State Building Code Council in Chapter 51-50 WAC".2021 International Residential Code — adopted at SMC 15.04A.020: "The 2021 Edition of the International Residential Code (IRC), as published by the International Code Council, as adopted by RCW 19.27.031 and as it may hereafter be adopted and/or amended by the State Building Code Council in Chapter 51-51 WAC".2021 International Mechanical Code — adopted at SMC 15.04A.030.2021 International Fire Code — adopted at SMC 15.04A.040.2021 Uniform Plumbing Code — adopted at SMC 15.04A.050.2021 International Energy Conservation Code — adopted at SMC 15.04A.060.2021 International Existing Building Code — adopted in SMC Chapter 15.04A.2021 International Fuel Gas Code — adopted in SMC Chapter 15.04A.2021 International Property Maintenance Code — adopted in SMC Chapter 15.04A.RCW 19.27 — the Washington State Building Code, the statewide instrument each of the above is adopted under.

Permit types & fees

Building Permit

Required for construction, alteration and repair work in Snoqualmie, reviewed against the 2021 International Building Code as adopted at SMC 15.04A.010.

Reviewed 2026-09-15 · Source

Requirements

  • A building permit is required before beginning regulated construction
  • Commercial and multifamily work is reviewed under the IBC (Chapter 51-50 WAC); one- and two-family dwellings under the IRC (Chapter 51-51 WAC)

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Snoqualmie does not issue it.

Reviewed 2026-09-15 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-15.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Snoqualmie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-09-16) →View current record →All versions →

Permalink: /washington/king-county/snoqualmie/as-of/2026-09-15/

Snapshot date: 2026-09-15

Commit: 73884a5

Reproducible from PermitBase’s version-controlled dataset, commit 73884a5.