Marysville building permits

Marysville, Washington — as published 2026-09-16.

Reviewed 2026-09-16 · Source

Codes adopted

THE 2021 EDITIONS, NAMED, WITH THE COPIES ON FILE. MMC 16.04.010 adopts "Certain documents, copies of which are on file in the office of the building official of the city of Marysville, being marked and designated as the "2021 International Building Code" and the "2021 International Residential Code," and the "2021 International Building Code Standards," published by the International Code Council".AND FUTURE AMENDMENTS ARRIVE AUTOMATICALLY. MMC 16.04.020: "All amendments or supplements to the 2021 International Building Code and 2021 International Residential Code hereinafter adopted by the International Code Council and by the state of Washington as part of the State Building Code shall become a part of this code in all respects insofar as it is applied and enforced within the jurisdictional boundaries of the city of Marysville." Named edition plus an explicit rolling clause.THE APPENDIX SECTION CUTS BOTH WAYS IN ONE SENTENCE. MMC 16.04.030: "Appendices AF, AQ and AU of the 2021 International Residential Code, Chapter 11 and Chapters 25 through 43 are not adopted. Appendix E of the 2021 International Building Code is adopted". So the IRC appendices AF, AQ (Tiny Homes) and AU are NOT adopted here - unlike Camas and Yakima, which specifically adopt Appendix Q - and IRC Chapter 11 and Chapters 25 through 43 are out too.RCW 19.27 - the Washington State Building Code applies statewide.

Permit types & fees

Building Permit

Required for construction in Marysville. The city names the 2021 editions, takes future state and ICC amendments automatically, and publishes its fee table in the code.

Reviewed 2026-09-16 · Source

Requirements

  • Built to the 2021 International Building Code and 2021 International Residential Code
  • Future amendments by the ICC and the state become part of the code automatically
  • IRC Appendices AF, AQ and AU and Chapters 11 and 25 through 43 are NOT adopted
  • IBC Appendix E IS adopted
  • Plan review is 65% of the building permit fee, payable when plans are submitted

Required documents

  • RequiredBuilding permit applicationApplication with plans; a plan review fee is payable when plans are submitted (MMC 16.04.050).

Fee schedule

Fee typeAmountNotes
Building permit fee (valuation-based)From $50.00 - see notes for caveats
MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. Show full citation

MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. FIRST, THE PRINTED FIGURES ARE NOT THE AMOUNT PAYABLE: the table's note says "Fees are based on February 2023 Building Valuation Data, published by the ICC, including a cost modifier of 1.03 applied each year starting in 2025", so a compounding annual modifier sits on top of what is printed. SECOND, THE TABLE DOES NOT AGREE WITH ITSELF AT TWO BOUNDARIES. A tiered table should be continuous - each bracket's base equalling the previous base plus its rate across the bracket. Four of the six boundaries here are exact to the penny. Two are not: at $2,000 the table computes to $95.75 but the next bracket starts at $69.25, and at $1,000,000 it computes to $5,608.75 but the next bracket starts at $5,680.75. THIS GUIDE DOES NOT ADJUDICATE which figure the city applies - ask Marysville. PLAN REVIEW IS A RATIO AND IS UNAFFECTED: "said plan review fee shall be 65 percent (65%) of the building permit fee", and a plan established as a "basic" plan for repeated use within a subdivision is reviewed at 35 percent.

Water and Sewer Service for Occupancy

Marysville makes occupying a property without water and sewer service unlawful, with a posting, securing and abatement process attached.

Reviewed 2026-09-16 · Source

Requirements

  • A premises "may only be occupied by a person if the premises has sewer service and water service"
  • Occupying without them, or occupying a premises posted "Unfit for Occupancy - No Trespassing", is a nuisance and a violation
  • Removing or defacing the posted notice is itself a violation
  • After a final determination, every structure must be secured within five business days

Required documents

  • RequiredEvidence of compliance for reoccupancySatisfactory evidence that the premises complies with MMC 16.24.030, plus written approval from the building official (MMC 16.24.100).

Fee schedule

Fee typeAmountNotes
Building permit fee (valuation-based)From $50.00 - see notes for caveats
MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. Show full citation

MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. FIRST, THE PRINTED FIGURES ARE NOT THE AMOUNT PAYABLE: the table's note says "Fees are based on February 2023 Building Valuation Data, published by the ICC, including a cost modifier of 1.03 applied each year starting in 2025", so a compounding annual modifier sits on top of what is printed. SECOND, THE TABLE DOES NOT AGREE WITH ITSELF AT TWO BOUNDARIES. A tiered table should be continuous - each bracket's base equalling the previous base plus its rate across the bracket. Four of the six boundaries here are exact to the penny. Two are not: at $2,000 the table computes to $95.75 but the next bracket starts at $69.25, and at $1,000,000 it computes to $5,608.75 but the next bracket starts at $5,680.75. THIS GUIDE DOES NOT ADJUDICATE which figure the city applies - ask Marysville. PLAN REVIEW IS A RATIO AND IS UNAFFECTED: "said plan review fee shall be 65 percent (65%) of the building permit fee", and a plan established as a "basic" plan for repeated use within a subdivision is reviewed at 35 percent.

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Marysville does not issue it.

Reviewed 2026-09-16 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • OptionalNo city document requiredNo city document - check the state register.

Fee schedule

Fee typeAmountNotes
Building permit fee (valuation-based)From $50.00 - see notes for caveats
MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. Show full citation

MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. FIRST, THE PRINTED FIGURES ARE NOT THE AMOUNT PAYABLE: the table's note says "Fees are based on February 2023 Building Valuation Data, published by the ICC, including a cost modifier of 1.03 applied each year starting in 2025", so a compounding annual modifier sits on top of what is printed. SECOND, THE TABLE DOES NOT AGREE WITH ITSELF AT TWO BOUNDARIES. A tiered table should be continuous - each bracket's base equalling the previous base plus its rate across the bracket. Four of the six boundaries here are exact to the penny. Two are not: at $2,000 the table computes to $95.75 but the next bracket starts at $69.25, and at $1,000,000 it computes to $5,608.75 but the next bracket starts at $5,680.75. THIS GUIDE DOES NOT ADJUDICATE which figure the city applies - ask Marysville. PLAN REVIEW IS A RATIO AND IS UNAFFECTED: "said plan review fee shall be 65 percent (65%) of the building permit fee", and a plan established as a "basic" plan for repeated use within a subdivision is reviewed at 35 percent.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-16.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Marysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/snohomish-county/marysville/as-of/2026-09-16/

Snapshot date: 2026-09-16