This is PermitBase’s published record for Unincorporated Campbell County as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Campbell County building permits

Verified

Unincorporated Campbell County, Wyoming — as published 2026-07-20.

Verified 2026-07-01 · Source

Codes adopted

2024 International Building Code (IBC) — including Appendices C and J, adopted by Campbell County Chapter 4 Rules Regulating Construction, Section 3 (Amended June 2026)2024 International Residential Code (IRC) — including Appendices A, B, C and E, adopted Chapter 4 Section 4 (Amended June 2026)2024 International Mechanical Code (IMC) — including Appendix A, adopted Chapter 4 Section 52024 International Plumbing Code (IPC) — including Appendices A and B, adopted Chapter 4 Section 6 — NOTE: Campbell County uses the IPC, not the Uniform Plumbing Code2024 International Fuel Gas Code (IFGC) — all appendices, adopted Chapter 4 Section 72024 International Fire Code (IFC), adopted Chapter 4 Section 8 (enforced by Campbell County Fire Department for Fire Code permits)2024 International Existing Building Code (IEBC), adopted Chapter 4 Section 9National Electrical Code (NFPA 70), 2026 Edition — including Informative Annex H, adopted Chapter 4 Section 10Liquefied Petroleum Gas Code (NFPA 58), 2020 Edition, adopted Chapter 4 Section 11Wyoming DEQ Water Quality Rules and Regulations Chapter 25 (Septic Tanks, Soil Absorption Systems, and Other Small Wastewater Systems) — adopted as Chapter 4 Appendix 1, administered by Campbell County under delegated authority from Wyoming DEQ (W.S. 35-11-304)

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwellings located INSIDE a Platted Subdivision in unincorporated Campbell County, governed by the 2024 IRC per Chapter 4 Section 4. Building Permits are NOT required for one- or two-family dwellings built OUTSIDE a platted subdivision (Chapter 4 Section 1.4.A.3) — see 'Building a Home on Rural Property' guidance — though electrical, mechanical, plumbing, and septic permits still apply in that case.

Verified 2026-07-01 · Source

Requirements

  • Inside a platted subdivision: Building Permit required; outside a platted subdivision: Building Permit is EXEMPT (Chapter 4 § 1.4.A.3), but electrical/mechanical/plumbing/septic permits are still required
  • Completed Building Permit & Zoning Certificate Application
  • Site plan drawn to scale showing setbacks, easements, septic tank/leach field, water/electric service lines, and (for new construction outside a subdivision) driveway mileage to access point
  • Verification of potable water source: on-lot well permit (WY State Engineer's Office), Shared Well Agreement (signed, notarized, recorded) plus well permit, or Centralized Water System connection letter
  • Approved Small Wastewater System (septic) permit if not on public sewer
  • Zoning Certificate (no fee) approved prior to permit issuance for zoned parcels
  • Inside a platted subdivision: two 24”x36” sets of building plans, plus foundation plans prepared by a Wyoming-licensed Professional Engineer with a soils report
  • Valid Campbell County-issued address posted before any inspection will be performed
  • Wyoming 811 (One Call) contacted prior to excavation

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationCampbell County Dept. of Public Works application form covering building/site info, applicant info, zoning info, construction info, water source, and sewage disposal method
  • RequiredSite PlanDrawn to scale or clearly dimensioned; shows north arrow, property lines, structures, wells, septic tank/leach field and future replacement field location, easements/rights-of-way, and utility lines
  • OptionalFoundation Plans and Soils Report (platted subdivisions)Foundation plan stamped by a Wyoming-licensed Professional Engineer, with a soils report verifying footing/foundation type
  • RequiredWater Well Permit or Shared Well AgreementCopy of the State Engineer's Office well permit for the intended use, or a signed/notarized/recorded Shared Well Agreement plus well permit

Fee schedule

Fee typeAmountNotes
Residential Building PermitNo feeCampbell County Chapter 4 Rules Regulating Construction, Section 1.8.E 'All Other Permits: No fees.' (Amended June 2026) — applies to one- and two-family residential building permits; only Commercial Building Permits carry the $250 fee under Section 1.8.A.
Zoning CertificateNo feeChapter 7 Zoning Regulations, Section 10.25(7)(a)(i)
Work commenced before obtaining required permit$60.00Chapter 4 Section 1.8.D

Residential Addition / Remodel Permit

Verified

Required for additions, alterations, and remodels to existing one- and two-family dwellings in unincorporated Campbell County. Governed by the 2024 IRC per Chapter 4 Section 4. Same no-fee structure and exemption logic as new construction applies (the platted-subdivision Building Permit requirement, and the rural-property exemption, both govern additions/remodels the same way they govern new construction).

Verified 2026-07-01 · Source

Requirements

  • Building Permit & Zoning Certificate Application, marked 'Update/Expansion of Existing Structure' or 'Interior Remodel Only'
  • Site plan showing the existing structure(s), proposed addition footprint, and setbacks
  • Foundation plans and soils report if new footings are part of the addition and the property is in a platted subdivision
  • Electrical, mechanical, and plumbing permits as applicable for any trade work included in the remodel

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationSelect 'Update/Expansion of Existing Structure' or 'Interior Remodel Only' as the Application Type
  • RequiredSite PlanShows existing structures, proposed addition footprint, and setback dimensions

Fee schedule

Fee typeAmountNotes
Residential Addition/Remodel PermitNo feeChapter 4 Section 1.8.E 'All Other Permits: No fees.'

Electrical Permit

Verified

Required for electrical installation, alteration, and repair work in unincorporated Campbell County. Per the Wyoming State Fire Marshal's 'LOCAL AND STATE JURISDICTIONS' chart, Campbell County holds delegated ELEC INSP/PR = L/L authority — the County's own Building Division issues and inspects electrical permits; it does NOT default to the WSFM statewide electrical program. Governed by NFPA 70 (National Electrical Code), 2026 Edition, per Chapter 4 Section 10.

Verified 2026-07-01 · Source

Requirements

  • Electrical Permit required for all new wiring, service changes, and alterations — required even when the associated Building Permit is exempt (e.g., rural/unplatted dwellings, farm/ranch structures, HUD manufactured homes, exempt accessory structures)
  • Farm/Ranch Operation electrical work: contractor must still obtain an Electrical Permit per W.S. 35-9-123(b) even though the structure itself is exempt from Chapter 4
  • Service disconnecting means must be installed at a readily accessible location within 50 feet, in plain view from outside the building (Chapter 4 § 10.A.1, amending NEC 230.70(A)(1))
  • County Building Division inspectors perform all electrical inspections locally (Chapter 4 § 10.B.5(a))
  • Mobile home electrical hookups follow the county's direct-bury/service-equipment standards (2-pole breaker sized to nameplate ampacity, grounding rods, conduit depth requirements)

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationElectrical work is applied for through the same county application; select 'Electrical Re-Energize' or describe the electrical scope under Type of Work

Fee schedule

Fee typeAmountNotes
Electrical Permit (residential)No fee
Chapter 4 Section 1.8.E 'All Other Permits: No fees.' — Campbell County charges no fee for residential electrical permits, unlike the WSFM's statewide $50 electrical permit fee that applies where the… Show full citation

Chapter 4 Section 1.8.E 'All Other Permits: No fees.' — Campbell County charges no fee for residential electrical permits, unlike the WSFM's statewide $50 electrical permit fee that applies where the state program has jurisdiction. This fee-free treatment applies because Campbell County has delegated BOTH building and electrical authority and elected not to charge for residential trade permits.

Plumbing Permit

Verified

Required for plumbing installation, alteration, and repair work in unincorporated Campbell County. Governed by the 2024 International Plumbing Code (IPC) per Chapter 4 Section 6 — NOTE: Campbell County uses the IPC, not the Uniform Plumbing Code.

Verified 2026-07-01 · Source

Requirements

  • Plumbing Permit required for new fixtures, water/sewer line work, and re-piping — required even where the associated Building Permit is exempt
  • Mobile home water/sewer hookups: minimum 3-inch schedule 40 drainage pipe and fittings, proper slope (1/4 in. per foot), water line protected from freezing and insulated
  • Sewer connections to Small Wastewater Systems must comply with Chapter 4 Appendix 1 (DEQ Water Quality Rules Chapter 25) frost/depth requirements

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationPlumbing work is applied for through the same county application

Fee schedule

Fee typeAmountNotes
Plumbing Permit (residential)No feeChapter 4 Section 1.8.E 'All Other Permits: No fees.'

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, and fuel gas installation work in unincorporated Campbell County. Governed by the 2024 International Mechanical Code (IMC) per Chapter 4 Section 5, and the 2024 International Fuel Gas Code (IFGC) per Chapter 4 Section 7.

Verified 2026-07-01 · Source

Requirements

  • Mechanical Permit required for furnace/AC/heat pump installation, ductwork, and gas piping — required even where the associated Building Permit is exempt
  • Gas systems with a design flow requiring DEQ oversight (non-domestic wastewater or specific commercial cases) may require separate DEQ permitting

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationMechanical work is applied for through the same county application

Fee schedule

Fee typeAmountNotes
Mechanical Permit (residential)No feeChapter 4 Section 1.8.E 'All Other Permits: No fees.'

Roofing Permit (Reroof)

Verified

Roof replacement/reroofing on a residential structure in unincorporated Campbell County falls under the county's general Building Permit framework (2024 IRC, Chapter 4 Section 4). Campbell County has no separate published reroof-specific fee or permit type distinct from the general 'All Other Permits: No fees' rule — reroofing is charged under that same no-fee provision unless it triggers a Commercial Building Permit.

Verified 2026-07-01 · Source

Requirements

  • Reroofing of a dwelling located inside a platted subdivision requires a Building Permit under the general Chapter 4 framework; a rural (unplatted) dwelling's reroof falls under the same rural-dwelling Building Permit exemption (Chapter 4 § 1.4.A.3) as new construction
  • Roof design must meet Chapter 4 Section 1.6 snow load criteria: 35 psf (roofs ≤1:12 pitch) or 30 psf (roofs >1:12 pitch), no reductions, plus required ice barrier underlayment

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationReroofing is applied for through the same county application when a permit is required

Fee schedule

Fee typeAmountNotes
Reroof — no separate flat feeNo feeReroofing has no separately published fee line; it is covered by Chapter 4 Section 1.8.E 'All Other Permits: No fees,' the same general residential no-fee rule that applies to the underlying Building Permit.

Solar PV Permit

Verified

Rooftop or ground-mounted solar photovoltaic system installation in unincorporated Campbell County is permitted under the general Building Permit (structural/racking) and Electrical Permit (interconnection) framework — there is no dedicated 'Solar PV' permit type or fee schedule published separately by Campbell County; the county's general Chapter 4 permit types (Building, Electrical) and no-fee provision apply.

Verified 2026-07-01 · Source

Requirements

  • Structural/racking attachment to a residential roof is reviewed under the Building Permit (2024 IRC) framework where a Building Permit applies (platted subdivision) — Chapter 4 § 1.4.A.3's rural-dwelling exemption logic extends to the structural aspect for rural dwellings, but the interconnection work still requires an Electrical Permit
  • Electrical interconnection, wiring, and disconnects require an Electrical Permit under NFPA 70 (NEC) 2026 Edition, Chapter 4 Section 10
  • Structural design must comply with Chapter 4 Section 1.6 snow load (35/30 psf) and wind speed (100–120 mph by risk category) criteria for the roof-mounted array

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationUsed for the structural/racking component where a Building Permit applies

Fee schedule

Fee typeAmountNotes
Solar PV installation — no dedicated fee lineNo feeCampbell County publishes no separate solar-specific fee; the applicable Building/Electrical Permits fall under Chapter 4 Section 1.8.E 'All Other Permits: No fees.'

EV Charger / EVSE Permit

Verified

Campbell County has no dedicated EV-charger/EVSE permit type or fee. Installing a Level 2 or DC fast EV charger requires a dedicated circuit or service equipment, which is administered under the county's general Electrical Permit (NFPA 70/NEC 2026 Edition, Chapter 4 Section 10) — the same permit used for any other electrical work, issued at no charge per Chapter 4 Section 1.8.E.

Verified 2026-07-20 · Source

Requirements

  • Electrical Permit required for the EV charger's dedicated circuit/service work — required even where the associated Building Permit is exempt (e.g., rural/unplatted dwellings)
  • Service disconnecting means must be installed at a readily accessible location within 50 feet, in plain view from outside the building (Chapter 4 § 10.A.1, amending NEC 230.70(A)(1)) if the install involves new/upgraded service equipment
  • Installation must comply with NFPA 70 (National Electrical Code), 2026 Edition, per Chapter 4 Section 10
  • County Building Division inspectors perform the electrical inspection locally (Chapter 4 § 10.B.5(a))

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationEV charger electrical work is applied for through the same county application; describe the scope (new circuit/EVSE) under Type of Work

Fee schedule

Fee typeAmountNotes
Electrical Permit (EV charger circuit — no distinct EV-charger fee line exists)No fee
Chapter 4 Rules Regulating Construction, Section 1.8.E 'All Other Permits: No fees.' This blanket no-fee provision explicitly covers all Electrical Permits (see the electrical-permit entry in this file); Show full citation

Chapter 4 Rules Regulating Construction, Section 1.8.E 'All Other Permits: No fees.' This blanket no-fee provision explicitly covers all Electrical Permits (see the electrical-permit entry in this file); Campbell County has never published a distinct EV charger/EVSE line item because it charges no fee for residential electrical permits generally. Re-checked the current Chapter 4 PDF (ccgov.net/DocumentCenter/View/211) on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language — none exists; the general no-fee electrical permit provision is the only applicable mechanism.

Accessory Dwelling Unit (ADU) Permit

Verified

Campbell County has a DEDICATED Accessory Dwelling Unit ordinance — Chapter 7 (Zoning Regulations) Section 45.70 — applicable in the R-L, R-R, R-S, R-1, and A-L Zoning Districts. Requires administrative Review Process 1 approval plus compliance with the 2024 IRC for construction.

Verified 2026-07-01 · Source

Requirements

  • Applies only in R-L, R-R, R-S, R-1, and A-L Zoning Districts (Chapter 7 § 45.70(2))
  • One ADU permitted per lot in R-L/R-R/R-S/R-1; one ADU per Primary Dwelling Unit in A-L (multiple allowed in A-L only if each Primary Dwelling meets the 10-acre minimum land area under § 15.10(1))
  • Written verification required that the Homeowners' Association, Improvement & Service District, or recorded Covenants Agreement approves the specific ADU; if none of these entities exist for the subdivision, a Conditional Use Permit (§10.55, $200 fee) is required instead
  • Maximum Building Footprint Living Area: the SMALLER of 60% of the Primary Dwelling Unit's footprint, or 1,100 sq. ft.
  • Maximum height: cannot exceed the height of the Primary Dwelling Unit
  • Detached ADUs may not be located in the front or side yard areas of the Principal Dwelling (except existing buildings under §45.70(6)(e))
  • HUD Manufactured Homes, RVs, and boats are PROHIBITED as ADUs, except Park Model Homes are allowed in A-L/R-L/R-R districts where the Primary Dwelling is itself a manufactured home
  • Attached ADUs must comply with the Two-Family Dwelling provisions of the currently adopted IRC, including Appendix AK sound transmission requirements
  • Detached ADUs (new construction) must comply with the currently adopted IRC; attached garages to the ADU may not exceed the ADU's own allowable footprint
  • Existing detached accessory structures converted to an ADU are not limited by a shop/garage-to-ADU area ratio, but the ADU living area itself cannot exceed the § 45.70(6)(a) size cap
  • Septic/sewer: ADU's small wastewater system may interconnect with the Primary Dwelling's system (not prohibited) but must comply with Chapter 4 Building Regulations

Required documents

  • RequiredZoning Certificate Application (for the ADU land use)Land Use Permit application under Chapter 7 Zoning Regulations, Review Process 1
  • RequiredHOA / Improvement & Service District / Covenants Approval LetterWritten approval of the specific ADU from the applicable entity, or a copy of the recorded Covenants Agreement
  • RequiredBuilding Permit & Zoning Certificate ApplicationRequired for the construction itself (attached or new-construction detached ADU) under the 2024 IRC

Fee schedule

Fee typeAmountNotes
ADU Zoning review (Review Process 1)No feeNot separately listed in the Chapter 7 § 10.25(7) fee table (which lists Zoning Certificate: No Fee); ADU review follows the same administrative Zoning Certificate process.
Conditional Use Permit (only if no HOA/I&S District/Covenants exists for the subdivision)$200.00Chapter 7 Zoning Regulations, Section 10.25(7)(a)(vii) — Conditional Use Permit fee, required per § 45.70(4)(c) when no governing entity exists to approve the ADU directly
Building Permit for ADU constructionNo feeChapter 4 Section 1.8.E 'All Other Permits: No fees.'

Demolition Permit

Verified

Demolition of a structure in unincorporated Campbell County falls under the county's general Chapter 4 Building Permit framework — a 'Change of Use'/demolition action is expressly covered by Chapter 4's scope (Section 1.2), and Campbell County publishes no separate demolition-specific fee.

Verified 2026-07-01 · Source

Requirements

  • Demolition, removal, or Change of Occupancy Classification of a building or structure requires application to the Building Division per Chapter 4 Section 1.3.A
  • Utility disconnects should be verified/arranged prior to demolition

Required documents

  • RequiredBuilding Permit & Zoning Certificate ApplicationDemolition is applied for through the same county application

Fee schedule

Fee typeAmountNotes
Demolition Permit — no separate flat feeNo feeNot separately itemized; covered by Chapter 4 Section 1.8.E 'All Other Permits: No fees.'

Commercial Building Permit / Tenant Improvement

Verified

Required for new commercial/industrial construction and tenant improvements in unincorporated Campbell County. This is the ONE permit type in the county that carries a real fee: a flat $250.00 charge for all new construction requiring a Commercial Building Permit, per Chapter 4 Section 1.8.A. Governed by the 2024 IBC/IMC/IPC/IFGC/IFC/IEBC.

Verified 2026-07-01 · Source

Requirements

  • $250 flat fee applies to all new construction requiring a Commercial Building Permit (Chapter 4 § 1.8.A)
  • Three complete sets of plans signed and sealed by a Wyoming-licensed Professional Engineer or Architect required (Commercial Building Permit Checklist)
  • Complete plan set: geotechnical report, civil plans, cover sheet with code data analysis, architectural plans, structural plans, gas plans, plumbing plans, mechanical plans, electrical plans, fire protection plans
  • Code data analysis on the title sheet must show use group classification, construction type, fire-resistant construction, design approach, height/area calcs, fire protection systems, interior finish, occupant load, means of egress, and accessibility features
  • Electrical plans for new commercial buildings/additions must be signed/sealed by a Wyoming-licensed Professional Electrical Engineer (or a Master Electrician employed by the licensed Electrical Contractor for services 400A or less, signed with WY state license number)
  • Plumbing and Mechanical plans must be signed/sealed by a Wyoming-licensed Professional Mechanical Engineer and show compliance with the 2024 IPC/IMC
  • Certified (stamped) site plans required for all multi-family, commercial, and industrial construction unless waived by the Applicable Director
  • Applications/permits expire 180 days after submittal (no extension request) or 180 days after issuance if work has stopped or not begun, unless a written extension is granted by the Building Official

Required documents

  • RequiredCommercial Building Permit ChecklistCounty's guide to the commercial permitting process, required plan set contents, timelines, and fees
  • RequiredCommercial Site Plan ChecklistDetailed site plan content requirements (parking, utilities, drainage, setbacks, landscaping, lot coverage)
  • RequiredElectrical Plan Submittal Requirements for Commercial BuildingsCounty's electrical plan submittal checklist for commercial projects
  • RequiredPlumbing & Mechanical Plan Submittal Requirements for Commercial BuildingsCounty's plumbing/mechanical plan submittal checklist for commercial projects

Fee schedule

Fee typeAmountNotes
Commercial Building Permit — new construction$250.00Chapter 4 Rules Regulating Construction, Section 1.8.A (flat fee for all new construction requiring a Commercial Building Permit)
Commercial Building Plan Review — additional re-reviews (3rd+)$250.00 per additional re-reviewChapter 4 Section 1.8.B — initial review and the first re-review of amended documents are free; each subsequent re-review is $250
Commercial Building Inspection — re-inspection$60.00 per re-inspectionChapter 4 Section 1.8.C — the first two inspections for each portion of work are free; each additional re-inspection for incorrectly performed work is $60, payable in person before scheduling
Work commenced before obtaining required permit$60.00Chapter 4 Section 1.8.D

Deck Permit

Verified

Deck construction in unincorporated Campbell County is exempt from a Building Permit if small and detached (a Zoning/site-plan review is still required in most instances); larger or attached decks require a full Building/Zoning permit under the currently adopted IRC. The county's dedicated deck guideline still references the 2018 IRC and has not yet been reissued for the 2024 edition — treat its specific span/footing tables as a baseline reference, not a substitute for current 2024 IRC deck provisions.

Verified 2026-07-01 · Source

Requirements

  • EXEMPT from a Building Permit (Zoning permit still required in most instances) if ALL of: not serving the main/front exit door; 200 sq. ft. or less; not more than 30 inches above grade within 36 inches of the deck; not attached to the dwelling
  • Attached or larger decks require a full Building/Zoning permit
  • Footers: minimum 42 inches depth from finish grade to bottom of footing (per the county's guideline, consistent with Chapter 4's 42-inch building frost line depth), 8 inches thick, extending 2 inches beyond post sides
  • Posts: 4x4 (or equivalent) up to 8 ft. height; 5x6 required above 8 ft.; all posts pressure-treated or decay-resistant (redwood/cedar)
  • Guardrails required for decks more than 30 inches above grade; height 34–38 inches; openings must not allow passage of a 6-inch sphere
  • Stairways: minimum 3 ft. clear width, riser 4–7.75 inches, tread depth min. 10 inches nose-to-nose, minimum 3 stringers for a standard 3 ft. wide stairway

Required documents

  • OptionalBuilding Permit & Zoning Certificate ApplicationRequired for decks that do not qualify for the small-deck exemption
  • OptionalResidential Deck GuidelinesCounty's technical guide to deck footings, posts, beams, ledger boards, stairways, and guardrails (references the 2018 IRC — verify against current 2024 IRC deck provisions for any conflicting detail)

Fee schedule

Fee typeAmountNotes
Deck Permit (where required)No feeChapter 4 Section 1.8.E 'All Other Permits: No fees.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-01)Later version (2026-07-22) →View current record →All versions →

Permalink: /wyoming/campbell-county/unincorporated-campbell/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 000d72e

Reproducible from PermitBase’s version-controlled dataset, commit 000d72e.