This is PermitBase’s published record for Green River as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Green River building permits
VerifiedGreen River, Wyoming — as published 2026-07-01.
Verified 2026-07-01 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family residential construction in Green River, including duplex dwellings. Governed by the 2024 International Residential Code (IRC) as adopted by Sec. 7-17 of the Code of Ordinances, with Green River-specific climatic and geographic design criteria.
Verified 2026-07-01 · Source
Requirements
- Building permit application submitted to the Development Services Building Inspection Division
- Two sets of plans required: plot/site plan, foundation plan, floor plans, roof (framing) plan, elevations, sections and details
- Plans must reflect Green River's Table R301.2(1) local design criteria: Ground Snow Load 30 psf, Wind Speed 115 mph, Seismic Design Category C, Frost Line Depth 42 inches, Winter Design Temp -20°F, Ice Shield Underlayment required, Air Freezing Index 2282
- Certain commercial-adjacent projects may require State Fire Marshal's office review — confirm with the Building Inspector
- Processed within 14 working days if the application is complete and clearly within code/regulation requirements
- Permit automatically expires one year after issuance; extension available by written request to the Building Inspector
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)City of Green River Development Services building permit application form; select New Construction / Single-Family Residential
- RequiredPermit Application Process (DocumentCenter Doc #4167)City's current checklist describing the two-plan-set submittal and 14-working-day review target
- RequiredSample Drawings — Site Plan, Foundation, Floor Plan, Wall Section, Elevations (DocumentCenter Docs #4169-4173)Reference drawings illustrating required plan content and scale
- OptionalConstruction Regulations (DocumentCenter Doc #4165)Overview of the adopted Building, Plumbing, Mechanical, and Electrical codes applicable to the project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — residential rate, valuation $1 to $2,000 | 50% of: $30.00 ($1-$500), $60.00 ($501-$1,000), or $90.00 ($1,001-$2,000) | City of Green River Development Services Fees schedule (effective July 1, 2018): residential projects (new construction, remodels, additions, attached/detached garages within IRC scope) are calculated at 50% of the general valuation fee table. |
| Building Permit Fee — residential rate, valuation $2,001 to $25,000 | 50% of: $90.00 for the first $2,000 + $18.00 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — residential rate, valuation $25,001 to $50,000 | 50% of: $504.00 for the first $25,000 + $13.50 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — residential rate, valuation $50,001 to $100,000 | 50% of: $841.50 for the first $50,000 + $10.00 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — residential rate, valuation $100,001 to $500,000 | 50% of: $1,341.50 for the first $100,000 + $7.50 for each additional $1,000 or fraction thereof | — |
| Residential Plan Review Deposit (new single or two-family dwellings) | $100.00 | Collected at application submittal; subtracted from the total Building Permit Fee once calculated prior to issuance. |
Residential Addition / Remodel Permit
VerifiedRequired for additions, remodels, and interior alterations to existing residential structures in Green River, including square-footage-increasing additions and interior remodeling.
Verified 2026-07-01 · Source
Requirements
- Additions or remodeling: floor plan/site plan required if adding square footage
- Interior remodeling: floor plan drawn to scale
- Replacing windows or doors: no site plan required, but a permit is still required
- Retaining walls over 4 feet tall, or any wall supporting a surcharge: two sets of building plans and a site plan required
- Siding/stucco and irrigation systems require a permit (no site plan)
- Building a garage: two sets of building plans and a site plan
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Select Alteration/Addition permit type
- RequiredWork Requiring a Building Permit (DocumentCenter Doc #4166)City's current list of scopes of work requiring a permit, including additions, remodels, window/door replacement, siding, and retaining walls
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — residential rate (50% of general valuation table) | Varies by construction valuation — same 50%-of-table structure as new residential construction | City of Green River Development Services Fees schedule (eff. July 1, 2018): remodels and additions within the scope of the adopted IRC are charged at 50% of the general valuation fee table; no separate flat fee line exists for additions/remodels. |
| Residential Plan Review Deposit | $100.00 | Applies to new single- or two-family dwellings; subtracted from the final Building Permit Fee. |
Electrical Permit
VerifiedRequired for electrical wiring, installations, and alterations in Green River. Governed by the National Electrical Code (NEC), latest edition as adopted by the Wyoming State Fire Marshal's Office (currently the 2023 NEC), adopted locally by Code of Ordinances Sec. 7-76. IMPORTANT: unlike the WSFM 'LOCAL AND STATE JURISDICTIONS' chart's general S/S (state-enforced) classification for Green River, the city's OWN ordinance and forms show Green River enforces its electrical code locally under Home Rule — see localAmendments for the full discrepancy note.
Verified 2026-07-01 · Source
Requirements
- Electrical contractor performing the work MUST hold a valid Wyoming electrical contractor's license
- All individuals working on the job must hold valid Wyoming electrical journeyman and/or apprentice licenses meeting Wyoming State electrical licensing requirements
- City of Green River inspections (rough-in and final) are required before a certificate of occupancy may be issued
- Homeowner exception: a homeowner may install electrical wiring in their own primary residence; all other premises wiring must be installed by a Wyoming-licensed electrical contractor
- If, in a case where the State of Wyoming electrical program is instead the permit route (the ordinance frames this as the required path 'for cities not holding home rule'), a copy of that state permit must be presented and added to the project file, with service, before-cover, and final inspections completed, before the general building permit may be issued
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Contains a dedicated 'Electrical Permit' checkbox plus fields for the Master Electrician's License Number, a 'State Electrical Permit#' cross-reference field, and a Yes/No checkbox for 'Is home owner doing electric work?'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — charged under the general valuation-based Building Permit fee schedule | No separate flat electrical permit fee is published; electrical work is charged via the same valuation table as the Building Permit (residential work at 50% of the table; commercial/multi-family at 100%) | City of Green River Development Services Fees schedule (effective July 1, 2018) is explicitly titled to cover 'Building, Plumbing, Electrical and Mechanical Permit' work (see the Refund Policy section heading), confirming electrical permits are issued and fee-assessed by the City using the same general valuation table as the building permit — this is a fully grounded, verified general-valuation-table fact per the framework's clarification, not a partial. |
| Re-inspection Fee | $50.00 | Required when the inspector must return for a repeated violation of the same code; paid prior to the third inspection and every re-inspection thereafter. |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Green River. Governed by the 2024 International Plumbing Code (IPC), adopted by Code of Ordinances Sec. 7-31, with a local amendment restricting exterior/concealed pipe placement due to the area's cold climate.
Verified 2026-07-01 · Source
Requirements
- Water heater/furnace replacement requires a permit (no site plan required)
- New fixture, re-piping, and water/sewer line work regulated under the 2024 IPC
- Local amendment to Section 305.4 ('Freezing'): water, soil, and waste pipes may not be installed outside a building, in attics, or in crawl spaces where subject to freezing, per Green River's amended IPC language
- Certain minor repairs (stopping leaks without replacing concealed piping, clearing stoppages without rearranging fixtures) are exempt from permit per the adopted code's Section 105.2 exemptions
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Plumbing subcontractor line is listed on the same application form used for building/electrical/mechanical/gas trades
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — charged under the general valuation-based Building Permit fee schedule | No separate flat plumbing permit fee is published; charged via the same valuation table as the Building Permit (residential work at 50%; commercial/multi-family at 100%) | Grounded per the City of Green River Development Services Fees schedule (effective July 1, 2018), which explicitly covers Building, Plumbing, Electrical and Mechanical permits under one valuation-based fee/refund structure — a verified general-valuation-table fact, not partial. |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilating, cooling, refrigeration, and other mechanical equipment installations in Green River. Governed by the 2024 International Mechanical Code (IMC), adopted by Code of Ordinances Sec. 7-46, and the 2024 International Fuel Gas Code (IFGC) for gas piping, adopted by Sec. 7-91.
Verified 2026-07-01 · Source
Requirements
- All heating, ventilating, cooling, refrigeration systems, incinerators, and other heat-producing appliances must be installed, repaired, and maintained per the 2024 IMC
- Gas piping systems governed by the 2024 IFGC (Sec. 7-91)
- Furnace/water heater replacement requires a permit (no site plan required)
- Portable heating/cooling/ventilation appliances and certain minor part replacements are exempt from permit per the adopted code's Section 105.2 exemptions
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Mechanical and Gas subcontractor lines are listed on the same application form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical/Fuel Gas Permit — charged under the general valuation-based Building Permit fee schedule | No separate flat mechanical permit fee is published; charged via the same valuation table as the Building Permit (residential work at 50%; commercial/multi-family at 100%) | City of Green River Development Services Fees schedule (effective July 1, 2018) covers Mechanical permits under the same general valuation table as Building/Plumbing/Electrical — a verified general-valuation-table fact. |
Roofing Permit (Reroof)
VerifiedRequired for roofing and reroofing work in Green River per the city's Work Requiring a Building Permit list, governed by the 2024 IBC/IRC as applicable to the structure type.
Verified 2026-07-01 · Source
Requirements
- Roofing and reroofing requires a building permit (no site plan required)
- Governed by the 2024 IRC (residential) or 2024 IBC (commercial) as adopted by Sec. 7-16/7-17
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Select Alteration/Addition or the applicable permit type for reroofing
- RequiredWork Requiring a Building Permit (DocumentCenter Doc #4166)Lists 'Roofing and Reroofing (no site plan required)' as requiring a permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roofing/Reroof Permit — charged under the general valuation-based Building Permit fee schedule | No separate flat reroof fee is published; charged via the same valuation table as the Building Permit (residential work at 50%; commercial at 100%) | Grounded per the City of Green River Development Services Fees schedule (effective July 1, 2018), which is the sole published fee mechanism for building-related permits including reroofing — a verified general-valuation-table fact. |
Solar PV Permit
VerifiedRooftop or ground-mounted solar photovoltaic installations in Green River require a building permit (structural) and an electrical permit, since solar PV falls under both the adopted 2024 IRC/IBC (structural/racking) and the locally-enforced NEC (electrical interconnection, Article 690).
Verified 2026-07-01 · Source
Requirements
- Solar PV installation is not called out as a distinct permit type on the city's Work Requiring a Building Permit list or Building Permit Application form; it is processed as an Alteration/Addition building permit plus an Electrical Permit, per the general Sec. 105.1 requirement that any work regulated by the adopted codes (including electrical) requires a permit
- Structural plans showing roof-mount racking attachment and load path required for the building permit component
- Electrical single-line diagram, load calculations, and disconnect location required for the electrical permit component, per Sec. 7-76 (NEC adoption) and the Wyoming-licensed electrical contractor requirement
- Confirm with Development Services (307) 872-6140 whether your project needs the State Fire Marshal's office review in addition to City review
Required documents
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Used for the structural/racking component of a solar installation; Electrical Permit checkbox used for the electrical/interconnection component
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV — Building Permit component (valuation-based) | Charged under the general valuation-based Building Permit fee schedule (residential 50%, commercial/multi-family 100%) | City of Green River Development Services Fees schedule (effective July 1, 2018) does not list a distinct 'solar' line item; solar PV racking/structural work is charged as ordinary valuation-based construction under the same table used for building permits generally. |
| Solar PV — Electrical Permit component | Charged under the same general valuation-based fee table (no distinct flat electrical line item published) | Consistent with how Green River charges all electrical work — see the electrical-permit entry. |
Accessory Dwelling Unit (ADU) Permit
VerifiedGreen River's zoning ordinance (Code of Ordinances Appendix B, Chapter 9 — Use Regulations) has NO dedicated Accessory Dwelling Unit (ADU) permit type or zoning category. The zoning code's own definition of 'Accessory Buildings, Structures and Uses' (Section 9.6) explicitly excludes residential occupancy: an accessory use 'Does not include residential occupancy.' A second dwelling unit on a lot must instead be built as a recognized 'Multi-Unit Dwelling' use (permitted only in specific multi-family zoning districts, e.g. R-3/R-4), not as an accessory structure to a single-family home.
Verified 2026-07-01 · Source
Requirements
- No ADU-specific permit or zoning pathway exists in Green River; do not apply expecting an 'ADU' permit type
- An accessory structure (garage, shed, workshop) may NOT include residential occupancy per Zoning Code Section 9.6.A ('Accessory Buildings, Structures and Uses') and the Shed & Accessory Structure Brochure
- A genuine second dwelling unit on a property requires the lot to be zoned for Multi-Unit Dwelling use (the zoning Table of Uses permits 'Multi-Unit Dwelling' only in specific districts, e.g. R-3/R-4, not R-1/R-2 single-family districts) — this is processed as a standard residential building permit for a duplex/multi-family structure, not an ADU permit
- Confirm zoning district and permitted use eligibility with Development Services/Planning before attempting any second-unit project
Required documents
- OptionalShed & Accessory Structure Brochure (DocumentCenter Doc #4092)States the accessory-use condition that residential occupancy is not included in an accessory structure/use
Fee schedule
| Fee type | Amount | Notes |
|---|
Demolition Permit
VerifiedRequired for demolition of structures in Green River. Requires sign-off from electrical utility, gas utility, and water/wastewater/sewer confirming service disconnection before demolition, plus a City Building Department utility-shutoff inspection.
Verified 2026-07-01 · Source
Requirements
- No demolition work shall begin without issuance of the permit
- Site plan showing existing structures to remain and structures to be demolished, with location/size of each
- Photos of each side of the structure(s) to be demolished, with the front photo showing the full front elevation visible from the street
- Contact the State of Wyoming Air Quality Division at (307) 777-7391 prior to demolition for asbestos demolition/renovation requirements
- Required sign-offs from Electrical Utility, Gas Utility, and Water & Wastewater/Sewer confirming proper service termination
- Pre-demolition inspection by the City of Green River Building Department verifying all utilities are properly shut off (schedule via 307-872-6140)
- Demolition of structures must be completed within 45 days from the start of demolition
- Site must be backfilled, leveled, and cleared of all building debris within 60 days after demolition
- Applicant is responsible for site safety and security
Required documents
- RequiredDemolition Permit Application (DocumentCenter Doc #4182, revised 6/26/2023)City of Green River Demolition Permit application requiring property owner, contractor, and required utility sign-off sections
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Filing Fee | $31.25 | City of Green River Demolition Permit Application (DocumentCenter Doc #4182, revised 6/26/2023), Section F — 'Filing Fee ($31.25) made payable to the City of Green River.' |
Commercial Tenant Improvement Permit
VerifiedRequired for interior remodels, additions, and tenant improvements to commercial and industrial buildings in Green River. Governed by the 2024 International Building Code (IBC) as adopted by Sec. 7-16, charged at 100% (not the 50% residential rate) of the general valuation fee table. Certain commercial projects require additional State Fire Marshal's office review.
Verified 2026-07-01 · Source
Requirements
- Commercial/Industrial building permit application with two sets of plans (site plan, structural, mechanical, plumbing, electrical as applicable)
- Full valuation-based permit fee (100% of the general fee table — no residential discount)
- Certain commercial projects in Green River must be reviewed by the Wyoming State Fire Marshal's office in addition to City Building Review — confirm applicability with the Building Inspector
- Commercial Plan Review Application (DocumentCenter Doc #4062) required for plan submittal
- Commercial interior demolition follows the same Demolition Permit Application and utility sign-off process as other demolition work
Required documents
- RequiredCommercial Plan Review Application (DocumentCenter Doc #4062)City of Green River's commercial project plan review submittal form
- RequiredBuilding Permit Application (DocumentCenter Doc #5572)Select Commercial/Industrial permit type
- OptionalCommercial Preliminary Development Plan Application (DocumentCenter Doc #6518)Required for major commercial site plan review as part of the development process
- OptionalCommercial Construction — What Does Not Require a Permit (DocumentCenter Doc #4178)2018 IBC Section 105 exemption list (structurally consistent with the current 2024 IBC's Section 105 exemptions)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — commercial/multi-family rate, valuation $1 to $2,000 | 100% of: $30.00 ($1-$500), $60.00 ($501-$1,000), or $90.00 ($1,001-$2,000) | City of Green River Development Services Fees schedule (effective July 1, 2018): commercial and multi-family projects are calculated at 100% of the general valuation fee table (vs. 50% for residential). |
| Building Permit Fee — commercial rate, valuation $25,001 to $50,000 | $504.00 for the first $25,000 + $13.50 for each additional $1,000 or fraction thereof (100% rate) | — |
| Commercial and Multi-family Construction Plan Review Fee | 65% of the Building Permit Fee | Collected at the time of Plan Review submittal, based on estimated construction valuation; in addition to the Building Permit fee. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.