Version history — Green River, Wyoming
This is PermitBase’s own verified record for Green River, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Green River’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-30Current record
- Green River, Wyoming — Fire Sprinkler & Fire Alarm System Permit (Wyoming State Fire Marshal's Office) fee record updated: $16.03 for $1.00-$499.99, scaling up per the Department of Fire Prevention and Electrical Safety Rules Chapter 2, Section 3 fee table (e.g., $47.22 for the first $2,000 plus $9.55 per additional $1,000 up to $24,999.99; $267.12 for the first $25,000 plus $6.90 per additional $1,000 up to $49,999.99; continuing up the same valuation-based schedule) → Valuation-based plan review fee — $1.00-$499.99: $16.03 | $500.00-$1,999.99: $16.03 for the first $500.00 plus $2.08 per additional $100.00 or fraction | $2,000.00-$24,999.99: $47.22 for the first $2,000.00 plus $9.55 per additional $1,000.00 or fraction | $25,000.00-$49,999.99: $267.12 for the first $25,000.00 plus $6.90 per additional $1,000.00 | $50,000.00-$99,999.99: $438.95 for the first $50,000.00 plus $4.78 per additional $1,000.00 | $100,000.00-$499,999.99: $677.60 for the first $100,000.00 plus $3.82 per additional $1,000.00 | $500,000.00-$999,999.99: $2,204.94 for the first $500,000.00 plus $3.25 per additional $1,000.00 | $1,000,000.00 and up: $3,824.33 for the first $1,000,000.00 plus $2.49 per additional $1,000.00
- 2026-07-22Superseded
- 2026-07-20Superseded
- Green River, Wyoming — EV Charger / Electric Vehicle Charging Station Permit record added
- 2026-07-17Superseded
- Green River, Wyoming — adopted-codes record updated
- 2026-07-01Initial record — coverage of Green River began