Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-08-16.

Page building permits

Verified

Page, Arizona — as published 2026-08-16.

Verified 2026-08-16 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Page runs its own Building Safety Department and independently adopts and administers its own construction codes; it does not defer permitting to Coconino County. Source: City of Page Building and Safety Department page (cityofpage.org/departments/building-and-safety/).2018 International Building Code (IBC), Chapters 1-35, with amendments to Chapter 9 and Appendix Chapters B, H, and I, adopted by the City of Page as its uniform building code. Source: City of Page Building and Safety Department page.2018 International Residential Code (IRC), Chapters 1-44, with Appendix Chapters A, B, C, D, H, and P adopted, governing one- and two-family dwelling construction. Source: City of Page Building and Safety Department page.2018 International Plumbing Code (IPC), Chapters 1-15, with Appendix E adopted. Source: City of Page Building and Safety Department page.2018 International Fuel Gas Code, Chapters 1-8, with Appendix Chapters A, B, and C adopted. Source: City of Page Building and Safety Department page.2018 International Mechanical Code (IMC), Chapters 1-15, with Appendix Chapters A and B adopted. Source: City of Page Building and Safety Department page.2018 International Existing Building Code, Chapters 1-16, with Appendix C adopted. Source: City of Page Building and Safety Department page.2018 International Pool and Spa Code, Chapters 1-11, with Appendix Chapters A, B, C, and D adopted. Source: City of Page Building and Safety Department page.2017 National Electrical Code (NEC), Chapters 1-9, with Annexes A-E adopted (note: the electrical code cycle is one edition behind the 2018 ICC set). Source: City of Page Building and Safety Department page.2012 International Energy Conservation Code (IECC), Chapters 1-6, adopted; governs energy-efficiency requirements for the City of Page. Source: City of Page Building and Safety Department page.2018 International Fire Code (IFC) Chapter 61 adopted specifically for LP Gas regulation, in addition to ANSI Standards 2009 combined with the 2018 IBC. Source: City of Page Building and Safety Department page.ICC A117.1 / ANSI Standards 2009 accessibility provisions apply in conjunction with the 2018 IBC, alongside the federal Americans with Disabilities Act (ADA) standards. Source: City of Page Building and Safety Department page.Local ordinance amendments layered onto the adopted ICC codes: Ordinance 666-19 amending Chapter 92 for automatic fire sprinkler systems; City Code Article 9-5, Sections 9-5-1 through 9-5-17, regulating wood-burning stoves; City Code Article 11-4-1(B) requiring sewer backwater valves; City Code Article 11-5-2 requiring grease interceptors. Source: City of Page Building and Safety Department page.Manufactured homes and factory-built buildings (FBBs) are licensed and permitted through a joint state/City structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues State/IGA installation permits (state fee schedule effective July 1, 2022 - June 30, 2023, per City of Page Consolidated Fee Schedule, Building Department - Manufactured Home Fees, pp. 6-7), while the City of Page Building Safety Department handles local site/foundation/utility compliance. Source: City of Page Consolidated Fee Schedule (Resolution 1296-23, adopted 1-25-2023).A building permit may not be issued prior to receiving verbal approval from Coconino County Health Department (Page office: 928-608-6108 x13; main office: 928-679-8760) — relevant for projects involving onsite wastewater/septic systems. Source: City of Page Building and Safety Department page.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the City of Page. Reviewed against the 2018 IRC as adopted by the City. Applications are submitted via the City of Page Building Permit Application (paper) or the online iWorQ portal, and single-family dwellings are reviewed directly by the Chief Building Official rather than going through the commercial Site Plan Review Committee process.

Verified 2026-08-16 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction within Page city limits
  • Plans must comply with the 2018 IRC as adopted by the City of Page and local design criteria (115 MPH wind, Exposure C; Seismic Zone 2, Site Class D or per geotechnical report; 18-inch frost depth; 20 PSF snow load, no reduction)
  • Site/plot plan required showing property dimensions, distances between existing/proposed structures, distance from building to property lines, utility hook-up locations, street identification, and north arrow
  • House plans required: foundation plan with details, electrical plans with service panel location/size, fully dimensioned floor plan, equipment locations, floor framing (all levels), roof framing, elevation drawings, cross-sections, deck framing details, and livable square footage
  • Two sets of truss calculations from the manufacturer required
  • Two stamped sets of engineering specifications by an Arizona-registered engineer required where applicable
  • A building permit may not be issued prior to receiving verbal approval from Coconino County Health Department
  • Owner/Builder permits are allowed for residential projects only; any hired contractor must be licensed per A.R.S. § 32-1169
  • Wood sill-plates on concrete must be pressure-treated or foundation-grade redwood; footing reinforcing steel cannot be tied to metal grade stakes due to corrosive soil

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form listing property/owner info, contractor/subcontractor licensing, valuation, and required approvals (Fire Dept, Zoning, Public Works, Utilities, PUE, County Health)
  • RequiredSite/Plot PlanProperty dimensions, structure setbacks, utility hook-up locations, street ID and north arrow
  • RequiredHouse Plans (Foundation, Electrical, Floor, Framing, Elevations)Fully dimensioned construction drawings per Building Safety Department residential plan review requirements
  • RequiredTruss Calculations (2 sets)Manufacturer-prepared truss calculation sets
  • OptionalEngineering Specifications (2 stamped sets)Arizona-registered engineer stamped specifications, where required by scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500); $23.50 + $3.05 per additional $100 (or fraction) to $2,000; $69.25 + $14.00 per additional $1,000 (or fraction) to $25,000; $391.25 + $10.10 per additional $1,000 to $50,000; $643.75 + $7.00 per additional $1,000 to $100,000; $993.75 + $5.60 per additional $1,000 to $500,000; $3,233.75 + $4.75 per additional $1,000 to $1,000,000; $5,608.75 + $3.65 per additional $1,000 above $1,000,000City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4
Plan Review Fee65% of the calculated Building Permit Fee
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5 note: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the… Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5 note: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the time of submitting documents for plan review. Said plan review shall be 65 percent of the building permit fee.'

Additional Plan Review (changes/additions/revisions to plans)$47.00 per hourCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.4, Other Inspections and Fees item 4
Re-inspection Fee$47.00 per hour (minimum charge one-half hour for inspections with no specifically indicated fee; $54.00 per hour cited for other inspections/fees under item 6)City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.4, Other Inspections and Fees items 2, 3, and 6
Inspection Outside Normal Business Hours$47.00 per hour, 2-hour minimum chargeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.4, Other Inspections and Fees item 1

Residential Addition / Remodel Permit

Verified

Required for room additions, remodels, and alterations to existing one- and two-family dwellings in Page. Reviewed against the 2018 IRC as adopted by the City, billed on the same Table 1-A valuation basis as new construction.

Verified 2026-08-16 · Source

Requirements

  • Building permit required for room additions, remodels, and alterations affecting structural or life-safety elements
  • Detached accessory structures for storage that are one-story and under 120 sq ft do not require a permit, but zoning setback rules may still apply
  • Interior finish work alone (painting, papering, tiling, carpeting, cabinets, countertops) is exempt from a permit
  • Plans must comply with City of Page local design criteria (115 MPH wind, Exposure C; Seismic Zone 2; 18-inch frost depth; 20 PSF snow load)
  • Site/plot plan showing existing structure, addition footprint, and setbacks required
  • Owner/Builder permits allowed for residential projects only; hired contractors must be licensed per A.R.S. § 32-1169

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form
  • RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
  • RequiredConstruction DrawingsFoundation, framing, electrical, and elevation drawings for the addition/remodel scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 (same Table 1-A schedule as new construction)City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4
Plan Review Fee65% of the calculated Building Permit FeeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Page, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Uses a dedicated fee formula separate from the general Table 1-A valuation schedule.

Verified 2026-08-16 · Source

Requirements

  • Electrical permit required for electrical installation, alteration, or repair work
  • Governed by the 2017 NEC (Chapters 1-9, Annexes A-E) as adopted by the City of Page
  • Electrical contractor information (name, address, contact, phone, license #) required on the Building Permit Application
  • Apply via paper Building Permit Application or the online iWorQ Building Permit Application Portal

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form listing contractor licensing information for the electrical subcontractor

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee — Based on Valuation of Construction Costs$27.00 for the first $500.00 of valuation; plus $3.75 for each additional $1,000.00 of valuation of construction costsCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, 'Other Inspections and Fees' table item 5, printed p.4
Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Page, governed by the 2018 International Plumbing Code (IPC) as adopted by the City, including local backwater-valve and grease-interceptor amendments.

Verified 2026-08-16 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems and fixtures
  • Governed by the 2018 IPC (Chapters 1-15, with Appendix E) as adopted by the City of Page
  • Backwater valves required on all sewer lines per City Code Section 11-4-1(B); grease interceptors required per City Code Section 11-5-2
  • A building permit (including plumbing scope) may not be issued prior to receiving verbal approval from Coconino County Health Department where onsite wastewater is involved

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form listing plumbing subcontractor licensing information

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized plumbing-only fee line was found; plumbing work is billed on the same general valuation schedule as other Building Department permits.

Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in Page, governed by the 2018 International Mechanical Code (IMC) as adopted by the City.

Verified 2026-08-16 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
  • Governed by the 2018 IMC (Chapters 1-15, with Appendix Chapters A and B) as adopted by the City of Page
  • 2018 International Fuel Gas Code (Chapters 1-8, Appendix A, B, C) governs associated gas-fired equipment and piping

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form listing mechanical subcontractor licensing information

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized mechanical/HVAC-only fee line (e.g., a flat AC-replacement fee) was found; mechanical work is billed on the same general valuation schedule as other Building Department permits.

Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in Page. Governed by the 2018 IBC/IRC roofing provisions, with roof drain sizing based on the City's local 3-inch-per-hour rainfall design criterion for flat roofs.

Verified 2026-08-16 · Source

Requirements

  • Building permit required for re-roofing (no published permit-exempt re-roofing scope was found on the City's Building Safety Department page, unlike the exemptions published for accessory structures, fences, and interior finish work)
  • Roof drain sizing for flat roofs must be calculated using the City's local 3 inch per hour rainfall design criterion
  • Plans/material listing showing existing framing, proposed material, and drainage slope required for plan review where applicable

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form
  • RequiredRoof Plan / Material ListingExisting framing, proposed roofing material, and drainage slope calculations (3 in/hr rainfall design for flat roofs)

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized re-roofing-only fee line was found; re-roofing is billed on the general valuation schedule.
Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop residential solar photovoltaic systems in Page. No dedicated streamlined PV procedure or PV-specific fee schedule was found published by the City; systems are subject to the state-law baseline (A.R.S. § 9-468) and the City's standard Building/Electrical Permit process under the 2018 IBC/IRC and 2017 NEC.

Verified 2026-08-16 · Source

Requirements

  • Residential PV systems must meet the minimum standards set by Arizona Revised Statutes § 9-468 (Solar construction permits; standards; definition), which all Arizona municipalities must follow at minimum for residential solar permit review
  • Construction plans showing PV system location, roof plan and elevation views, panel mounting/racking details, and a one-line or three-line electrical diagram are required per the state-law baseline
  • Electrical work must comply with the 2017 NEC as adopted by the City of Page
  • No City of Page-specific streamlined review procedure, dedicated PV checklist, or PV-specific fee schedule (comparable to some other Arizona cities' dedicated residential PV procedures) was found published on the City's Building and Safety Department page or in the Consolidated Fee Schedule as of July 2026

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form, submitted with construction/electrical plans for the PV system
  • RequiredPV Construction Plans (roof plan, elevation, racking/mounting details, electrical diagram)Minimum plan content required under A.R.S. § 9-468 for residential solar permit review

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation) and/or Electrical Permit Fee (valuation-based)Building Permit Fee per Table 1-A ($23.50 for valuation $1-$500 up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000) and/or Electrical Permit Fee ($27.00 for the first $500 + $3.75 per additional $1,000 of valuation)
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No dedicated 'Photovoltaic System' fee line was found in the published fee schedule; a residential PV system is billed under the general Building Permit Fee and/or the Electrical Permit Fee formula depending on how the City classifies the work at intake.

Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in the City of Page, processed through the standard Building Permit Application. No demolition-specific published fee line was found; demolition is billed on the same Table 1-A valuation basis as other Building Department permits.

Verified 2026-08-16 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Page city limits (application 'Class of Work' includes a 'Remove' option on the standard Building Permit Application)
  • Property owner and general contractor information required on the Building Permit Application
  • Coordination with utility providers (Water/Sewer: 928-645-4214; Electrical/PEU: 928-645-2419; Propane/SemStream: 928-645-2391) for service termination is expected as part of standard demolition practice, though no City of Page-published demolition-specific checklist was found
  • Call Arizona Blue Stake (1-800-STAKE-IT / 811) before any excavation, per the notice printed on the City of Page Building Permit Application

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form; select 'Remove' under Class of Work

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized demolition-only fee line was found; demolition is billed on the general valuation schedule based on the value/scope of the demolition work.

EV Charger / EVSE Permit

Verified

The City of Page does not publish a dedicated EV charger/EVSE permit. Installation of a Level 2 EV charging circuit is permitted as electrical work under the City's standard Electrical Permit, governed by the 2017 National Electrical Code as adopted by the City. The City's Consolidated Fee Schedule (Resolution 1296-23) uses a dedicated valuation-based formula for all electrical permits — there is no separate EV-specific line item.

Verified 2026-08-16 · Source

Requirements

  • Electrical permit required for the EV charging circuit installation, alteration, or repair work
  • Governed by the 2017 NEC (Chapters 1-9, Annexes A-E) as adopted by the City of Page
  • Electrical contractor information (name, address, contact, phone, license #) required on the Building Permit Application
  • Apply via paper Building Permit Application or the online iWorQ Building Permit Application Portal

Required documents

  • RequiredCity of Page Building Permit ApplicationOfficial application form listing contractor licensing information for the electrical subcontractor

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee — Based on Valuation of Construction Costs$27.00 for the first $500.00 of valuation; plus $3.75 for each additional $1,000.00 of valuation of construction costsCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, 'Other Inspections and Fees' table item 5, printed p.4 — the same formula applied to EV charger circuit installation; no separate EV-specific line item exists
Plan Review Fee (where plan review is required)65% of the calculated permit feeCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5

Commercial Building Permit

Verified

Required for new commercial building construction and for exterior remodeling/expansion of commercial uses in the City of Page, reviewed against the 2018 IBC and City amendments. Unlike residential construction, most commercial development must first pass Site Plan Review Committee (SPRC) approval — required by Zoning Code § 152.095(B) before any building permit can even be submitted — before the same generic City of Page Building Permit Application and Table 1-A valuation fee schedule used for every other permit type in this record is used to pull the actual building permit. Tenant improvement (interior remodeling of an existing commercial building) is not a separate permit type or fee schedule: it uses the identical Building Permit Application and Table 1-A fees as new commercial construction, and Zoning Code § 152.095(A)(1)(b) explicitly exempts 'interior remodeling only of commercial and multi-family structures' from the SPRC gate entirely (as does an exterior addition/modification under 500 sq ft or 10% of gross floor area, whichever is less, per § 152.095(A)(1)(c)).

Verified 2026-08-16 · Source

Requirements

  • Building permit required for all new commercial building construction and for exterior remodeling/expansion of commercial uses, reviewed against the 2018 IBC (Chapters 1-35, with City of Page amendments) and ICC A117.1 (2009) accessibility standards as adopted by the City of Page
  • 'Commercial development' is defined by Zoning Code § 152.095(B) as 'any residential development larger than a single-family detached residence on a single lot, and any commercial or industrial building or development'
  • Per § 152.095(A)(1) and (B): commercial developments (new construction, major subdivisions, and exterior remodeling/expansion of commercial uses) require Site Plan Review Committee (SPRC) review and approval before any building permit can be submitted for review. Exempt from SPRC (but not from the underlying building permit): interior remodeling only of commercial structures (§ 152.095(A)(1)(b)); exterior modifications/additions that do not increase gross floor area by more than 500 sq ft or 10%, whichever is less (§ 152.095(A)(1)(c))
  • Complete SPRC site plan package required per § 152.095(B)(1)-(2): a completed City of Page application for construction plan submittal; one electronic PDF of the complete site plan; two bound sets on 24"x36" white-background paper; supporting documentation/studies/reports; and, if the development requires fire sprinklers or fire protection, a third complete paper set for the Fire Marshal's review and approval. Partial or incomplete submittals, or submittals split across entities, are rejected and returned to the applicant at their expense
  • SPRC review covers: compliance with the Zoning Code, Maricopa Association of Governments (MAG SPEC) design standards, ADA specifications, and the adopted IBC (SPRC as a whole); street plans, drainage, and floodplain (Public Works Director); water/sewer and electric utilities (Page Utility Enterprises); easement work (Western Area Power Authority); rights-of-way/intersection design where the site abuts a state highway (ADOT); and Fire, Police, and Ambulance Departments as appropriate
  • Per § 152.095(B)(3), city staff schedule a formal SPRC meeting to be held within 14 days of determining the site plan application complete, held on the closest Thursday or another day the SPRC deems appropriate; the applicant or their civil engineer must attend in person or via videoconference to answer committee questions
  • Once SPRC (and the Fire Marshal and any other required outside agency) approve the site plan, the applicant works with the City's Chief Building Official (CBO) to pull the building permit(s) required for construction, submitted on the same generic City of Page Building Permit Application used for every other permit type in this record, with 'NEW' (or 'ADDITION'/'ALTERATION' for remodel/TI scope) selected under Class of Work
  • Per § 152.095(D): a site plan approval becomes void if a building permit has not been issued within one year of approval; a one-time three-month extension may be granted by the Director if requested before the one-year deadline, and additional extensions require Planning and Zoning Commission approval
  • Per § 152.095(G): the CBO may issue a Temporary Certificate of Occupancy (30, 60, or 90 days, at the CBO's discretion) or a final Certificate of Occupancy; no occupancy of any structure is allowed until all required improvements are complete and CBO-approved
  • Automatic fire sprinkler systems are required in any building (commercial included) exceeding 4,000 sq ft, per City Ordinances 548-09, 566-10, and 666-19 (City Code Chapter 92) — a threshold many hotel/hospitality and larger retail projects in Page will exceed
  • Hotel/Motel-specific zoning standards apply during site plan/SPRC review (Zoning Code Table 4.2 series): off-street parking is calculated as 1 space per guest room, plus 1 space per 4 persons of the banquet room's maximum capacity (if a banquet room is present), plus 2 spaces per 3 employees, plus 1 RV/boat/bus space per 6 guest rooms (3-space minimum); hotel/motel parking stalls are allowed a reduced 9-foot width; and 4 passenger loading/unloading spaces are required for a Hotel or Motel use (Table 4.2-4). 'HOTEL or MOTEL' is defined in the Zoning Code as 'a facility with continuous on-site management with nine or more sleeping rooms that are intended to be occupied by guests for a fee'
  • Owner/Builder permits are allowed for residential projects only (per the localAmendments); commercial project work must be performed by licensed contractors per A.R.S. § 32-1169

Required documents

  • RequiredCity of Page Building Permit ApplicationSame generic application form used for every permit type in this record; select 'NEW', 'ADDITION', or 'ALTERATION' under Class of Work as applicable to the commercial scope
  • OptionalCity of Page Application for Construction Plan Submittal (SPRC Site Plan Package)Required only where SPRC review applies (new commercial construction or exterior remodel/expansion exceeding the 500 sq ft / 10% GFA exemption threshold) — one electronic PDF plus two bound 24"x36" sets of the complete site plan, per § 152.095(B)(1)
  • RequiredSite PlanMust show, at minimum, all buildings/structures/utilities, rights-of-way/easements/open space, sidewalks and travel ways, parking/driveways/loading areas, ADA parking and routes, landscaping, drainage/retention, signage, property boundaries, and topographic/geologic issues, per § 152.095(B)(2)
  • RequiredConstruction / Building PlansFull construction drawing set meeting the most current adopted IBC, IRC, Fire, Electrical, and Plumbing Codes, MAG SPECS, and City Zoning/Subdivision Codes, per § 152.095(F)(2)
  • OptionalFire Marshal Plan Set (3rd paper set)Required only if the development requires fire sprinklers or fire protection, per § 152.095(B)(1)(e) and (F)(1)(e)

Fee schedule

Fee typeAmountNotes
Commercial Building Permit Fee — Table 1-A (Total Valuation)$23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 — identical schedule to residential
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separate commercial-only valuation chart was found; commercial building permits (new construction and tenant improvement/remodel alike) are billed on the same Table 1-A schedule used for every other permit type in this record.

Plan Review Fee65% of the calculated Building Permit Fee
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5 note: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the… Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.5 note: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the time of submitting documents for plan review. Said plan review shall be 65 percent of the building permit fee.'

Site Plan Review Fee (Commercial/Subdivision Plat/Conditional Use Permit)$500.00
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Planning and Zoning Code Fees, printed p.13. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Planning and Zoning Code Fees, printed p.13. This is a distinct, commercial-specific fee not charged on residential (single-family) permits — it funds the SPRC review required by Zoning Code § 152.095(B) before a commercial building permit can be submitted; not charged for SPRC-exempt interior tenant-improvement-only work

Site Plan Revision Fee (Subsequent Site Plan Reviews Required)$250.00City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Planning and Zoning Code Fees, printed p.13
Commercial Application Fee — Conditional Use Permit (CUP)$300.00
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Planning and Zoning Code Fees, printed p.13. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Planning and Zoning Code Fees, printed p.13. Applicable only where the proposed commercial use requires a Conditional Use Permit in the applicable zoning district (not every commercial use or zone requires a CUP)

Additional Plan Review / Re-inspection / After-Hours Inspection Fees$47.00 per hour (2-hour minimum for after-hours inspections; one-half hour minimum for re-inspections with no specifically indicated fee)City of Page Consolidated Fee Schedule, Building Inspection and Permit Fees, Table 1-A, printed p.4, Other Inspections and Fees items 1-4 — same schedule applied to every permit type in this record

Sign Permit

Verified

Required to erect, re-erect, construct, alter, expand or move all permanent sign types within the City of Page. A separate permit is required for each sign or group of signs on a single supporting structure. In addition to the sign permit, an electrical permit must be obtained before erecting, re-erecting, constructing, altering or moving electric signs. Applications for signage permits are made through the City's Chief Building Official. General sign maintenance — cleaning, painting, or changing a sign's content or a face of the same size that does not alter or change the sign's structure — does not require a permit.

Verified 2026-08-15 · Source

Requirements

  • A permit is required to erect, re-erect, construct, alter, expand, or move all permanent sign types within the city limits (Page Code of Ordinances § 152.058(A)(9))
  • A separate permit is required for each sign or group of signs on a single supporting structure (§ 152.058(A)(9))
  • In addition to a sign permit, an electrical permit must be obtained before erecting, re-erecting, constructing, altering, or moving electric signs (§ 152.058(A)(9))
  • Applications for signage permits are made through the City's Chief Building Official (§ 152.095(F))
  • All signage must be designed, constructed, and installed by a licensed contractor in accordance with the sign regulations and applicable building codes (§ 152.058(B)(1))
  • All sign materials and components must be of the quality and grade needed to withstand specified wind and seismic hazard conditions in Northern Arizona, and all signs regardless of materials must be securely anchored to withstand those hazards as approved by the Chief Building Official (§ 152.058(B)(1)(e) and (g))
  • Signs must maintain a minimum of six feet horizontal clearance and 12 feet overhead clearance from electrical conductors and communications equipment or lines, and clearance from all surface and underground water, drainage and utilities; the owner is required to verify Western Area Power Administration (WAPA) utility requirements (§ 152.058(B)(1)(d))
  • No sign or sign structure may be erected or placed so as to obscure visibility or sit in the sight-triangle at street intersections, or where it may interfere with, obstruct the view of, or be confused with any authorized sign, traffic signal or device (§ 152.058(B)(1)(c))
  • Combustible materials other than approved plastics may not be used in the construction of any electronic signs (§ 152.058(B)(1)(f))
  • Illuminated signs must comply with the outdoor lighting provisions of § 152.059 unless otherwise specified in the sign regulations (§ 152.058(B)(2))
  • For commercial developments, signage must be shown on the site plan submitted to the Site Plan Review Committee — all site signage, whether for directional or advertisement purposes, with specifications (§ 152.095(B)(2)(h)) — and building permits for signage may then be pulled as approved by the Director, Chief Building Official and Fire Marshall (§ 152.095(B)(6))
  • Prohibited signs may not be permitted, including billboards (static or digital) and any other off-premises signage; roof signs and signs projecting above a wall, parapet or roofline; mechanically moving signs, pennant strings, streamers, spinners, propellers and search lights; strobing or flashing signs and signs with a change rate or dwell time of less than four seconds; inflatable signs; abandoned signs including sign frames, cabinets and other sign structures; signs at the airport approach and departure slope of the Page Municipal Airport; and signs that imitate or interfere with official traffic control devices (§ 152.058(A)(8))

Required documents

  • RequiredCity of Page Building Permit ApplicationSign permits are pulled through the Chief Building Official on the City's Building Permit Application (§ 152.095(F)). The form captures property and owner information, contractor licensing, valuation, class of work, and the required approvals (Fire Dept, Zoning, Public Works, Utilities, P.U.E., County Health).
  • RequiredSign drawings and specificationsDesign, materials, dimensions, placement and anchoring details sufficient to show compliance with § 152.058(B)(1), including the wind and seismic anchoring the Chief Building Official must approve. For commercial developments, all site signage with specifications must also appear on the approved site plan per § 152.095(B)(2)(h).
  • OptionalSeparate electrical permit applicationRequired in addition to the sign permit before erecting, re-erecting, constructing, altering or moving an electric sign (§ 152.058(A)(9)).

Fee schedule

Fee typeAmountNotes
Sign Permit FeeBased on value like Building Permits
City of Page 2026 Consolidated Fee Schedule (adopted by Resolution 1345-26 on June 10, 2026), 'Planning and Zoning Code Fees' section, 'Subdivisions and Other Fees' table, printed page 13 — line item 'Sign permit'. Show full citation

City of Page 2026 Consolidated Fee Schedule (adopted by Resolution 1345-26 on June 10, 2026), 'Planning and Zoning Code Fees' section, 'Subdivisions and Other Fees' table, printed page 13 — line item 'Sign permit'. Read this figure from the page as published rather than from a copy-paste: a copy-paste of that two-column table silently shifts the rows by one, pairing 'Sign permit' with the $50.00 that actually belongs to the 'Zoning Letter Fee' line immediately below it. The published sign permit fee is valuation-based, not a $50.00 flat fee. The valuation basis is the Building Permit Fee table (Table 1-A) reproduced in the same fee schedule's 'Building Inspection and Permit Fees' section, printed page 4, and codified at Page Code of Ordinances § 150.04.

Building Permit Fee basis — Table 1-A (Total Valuation)$23.50 (valuation $1.00 to $500.00); $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof to and including $2,000.00; $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof to and including $25,000.00; $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 to and including $50,000.00; $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 to and including $100,000.00; $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00 to and including $500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00 to and including $1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00 or fraction thereof
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), 'Building Inspection and Permit Fees' section, Valuation/Fee table, printed page 4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), 'Building Inspection and Permit Fees' section, Valuation/Fee table, printed page 4. and cross-checked against the codified table at Page Code of Ordinances § 150.04(A) Table 1-A (1976 Code § 7-1-3; Ord. 543-09, passed 1-22-2009); the two agree. This is the valuation basis the fee schedule's sign permit line refers to.

Plan Review Fee65 percent of the building permit fee
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), printed page 5: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at… Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), printed page 5: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the time of submitting documents for plan review. Said plan review shall be 65 percent of the building permit fee.' Also codified at Page Code of Ordinances § 150.04(B). Applies where submittal documents are required.

Electrical Permit Fee (electric signs)$27.00 for the first $500.00; plus $3.75 for each additional $1,000.00 of valuation of construction costs
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), 'Building Inspection and Permit Fees' section, 'Other Inspections and Fees' table, item 5 'Electrical Permit', printed page 4. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), 'Building Inspection and Permit Fees' section, 'Other Inspections and Fees' table, item 5 'Electrical Permit', printed page 4. Relevant because § 152.058(A)(9) requires a separate electrical permit in addition to the sign permit for electric signs.

Fire Sprinkler / Fire Alarm Permit

Verified

The City of Page adopted the 2018 International Fire Code, with local amendments requiring an automatic sprinkler system throughout all buildings of 4,000 square feet or greater. Fire system permits are issued on a valuation basis using the 'Valuation of Fire System' table in the City's Consolidated Fee Schedule. Where a development requires fire sprinklers or fire protection, a third complete set of paper plans must be submitted for the Fire Marshall's review and approval, and the Building Permit Application carries a Fire Dept approval box and a sprinklers entry that must be completed.

Verified 2026-08-15 · Source

Requirements

  • The 2018 International Fire Code, together with Appendices A, B, C, D, E, F, H and I, is adopted as the City Fire Code (Page Code of Ordinances § 92.02; Ord. 548-09, passed 6-11-2009; Ord. 666-19, passed 12-11-2019)
  • The 2017 edition of the National Fire Protection Association Standards is adopted (§ 92.03)
  • An automatic sprinkler system must be installed throughout all buildings 4,000 square feet or greater in total area; fire resistant walls and barriers do not define separate buildings for this purpose (§ 92.04(A))
  • An addition to any existing non-sprinklered building or structure which expands the total area to 4,000 square feet or greater must contain an automatic sprinkler system (§ 92.04(B))
  • With the exception of special hazard areas as approved by the Fire Chief, if any fire area in a building or structure is provided with fire sprinklers — whether required or not — all fire areas in the building or structure must be provided with fire sprinklers (§ 92.04(C))
  • All buildings requiring an exterior lock box for fire department access must install a KNOX BOX in an approved location or locations; existing buildings have up to five years to comply upon approval of the Fire Chief (§ 92.04(D))
  • Where the development requires fire sprinklers or fire protection due to code requirements, a third complete set of paper plans must be submitted for the Fire Marshall's review and approval, in addition to the electronic PDF set and the two bound paper sets (§ 152.095(B)(1)(e) and § 152.095(F)(1)(e))
  • Building permit application packets must include everything required by the most current adopted editions of the International Building Codes, the International Residential Codes, and the Fire, Electrical and Plumbing Codes, the MAG SPECS, and the City Zoning and Subdivision Codes, as amended and adopted by City Council from time to time (§ 152.095(F)(2))
  • For commercial developments, the site plan must be approved by the Site Plan Review Committee — which includes the Fire, Police and Ambulance Departments as appropriate — and by the Fire Marshall where required, before building permits can be pulled (§ 152.095(B)(4)(h) and (B)(5))
  • The City of Page Building Permit Application requires the FIRE DEPT approval box to be marked required and received, and carries a SPRINKLERS entry alongside the OCCUPANCY and valuation entries
  • Fire permit fees are established periodically by the City Council by separate resolution (§ 92.05)

Required documents

  • RequiredCity of Page Building Permit ApplicationThe Building Safety Department form used to pull the permit. Carries the FIRE DEPT approval box (required/received), the SPRINKLERS entry, valuation, type of construction, occupancy, and permit/plan review/total fee entries. Submit to P.O. Box 1180 / 697 Vista Avenue, Page, AZ 86040, or through the City's iWorQ online portal.
  • RequiredFire sprinkler / fire protection plans — third complete paper set for the Fire MarshallWhere the development requires fire sprinklers or fire protection due to code requirements, a third complete set of paper plans (24 inch by 36 inch, white background) must be submitted for the Fire Marshall's review and approval, in addition to the one electronic PDF version and the two bound paper sets required of every submittal (§ 152.095(B)(1)(e) and § 152.095(F)(1)(e)).
  • RequiredOne electronic version of the plans and specifications in PDF formatRequired for distribution and City records on every building construction submittal (§ 152.095(F)(1)(b)).
  • RequiredTwo bound sets of the complete plans on 24 inch by 36 inch paper with a white backgroundRequired on every building construction submittal (§ 152.095(F)(1)(c)). The City will not make paper copies for the applicant to complete the package.
  • OptionalSupporting documentation, studies or reports in PDF formatSubmitted in PDF format only unless paper copies are requested (§ 152.095(F)(1)(d)).

Fee schedule

Fee typeAmountNotes
Fire System Permit Fee — Valuation of Fire System$23.50 (valuation $1.00 to $500.00); $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof to and including $2,000.00; $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof to and including $25,000.00; $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof to and including $50,000.00; $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof to and including $100,000.00; $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00 or fraction thereof to and including $500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00 or fraction thereof to and including $1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00 or fraction thereof
City of Page 2026 Consolidated Fee Schedule (Adopted by Resolution 1345-26 on June 10, 2026), 'Valuation of Fire System / Fee' table, printed page 5 (the Fire Permit and Inspection Fees page… Show full citation

City of Page 2026 Consolidated Fee Schedule (Adopted by Resolution 1345-26 on June 10, 2026), 'Valuation of Fire System / Fee' table, printed page 5 (the Fire Permit and Inspection Fees page immediately following the Building Inspection and Permit Fees page). Read the row pairings from the page as published rather than from a copy-paste. The bands and amounts are identical to the Building Permit Fee Table 1-A bands, but applied to the valuation of the fire system rather than total construction valuation. Authorised by Page Code of Ordinances § 92.05, under which the City Council periodically establishes fire permit fees by separate resolution.

Fire Plan Review Fee65 percent of the building permit fee
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), printed page 5, note at the foot of the fire fee table: 'Plan Review Fees: When submittal documents are… Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), printed page 5, note at the foot of the fire fee table: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the time of submitting documents for plan review. Said plan review shall be 65 percent of the building permit fee.'

Annual fire renewable permit$47.00 per categoryCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and Fees: Hourly Charge' table, item 5, printed page 5.
Fire Activity Report$47.00 per permitCity of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and Fees: Hourly Charge' table, item 6, printed page 5 — excludes non-commercial burn permits.
Fire re-inspection / after-hours / unlisted inspection / additional plan review$47.00 per hour
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and Fees: Hourly Charge' table, items 1 through 4, printed page 5. Show full citation

City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and Fees: Hourly Charge' table, items 1 through 4, printed page 5. Inspections outside normal business hours carry a two-hour minimum charge; inspections for which no fee is specifically indicated carry a one-half hour minimum. The published note reads: 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits for the employees involved.' Use of outside consultants for plan checking or inspections, or both, is charged at actual costs, including administrative and overhead costs.

Sources & verification

Verified against official sources. Last reviewed 2026-08-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-01)View current record →All versions →

Permalink: /arizona/coconino-county/page/as-of/2026-08-16/

Snapshot date: 2026-08-16

Commit: b441a33

Reproducible from PermitBase’s version-controlled dataset, commit b441a33.