This is PermitBase’s published record for Unincorporated La Paz County as of 2026-08-15. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated La Paz County building permits

Verified

Unincorporated La Paz County, Arizona — as published 2026-08-15.

Verified 2026-08-15 · Source

Codes adopted

2018 International Building Code (IBC), including Appendix C, H, I, and J — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(1), effective October 17, 20242018 International Residential Code (IRC), including Appendix A, B, G, H, P, and Q — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(9)2018 International Existing Buildings Code (IEBC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(3)2018 International Mechanical Code (IMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(4)2018 International Plumbing Code (IPC), including Appendix C and E — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(5)2018 International Fuel Gas Code (IFGC), including Appendix A, B, and C — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(6)2018 International Property Maintenance Code (IPMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(7)2018 International Swimming Pool and Spa Code (ISPSC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(8)2018 International Fire Code (IFC), including Appendix B, C, D, E, F, and I — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(10)2020 National Electrical Code (NEC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(2)

Permit types & fees

Residential Building Permit (New Construction, Addition, Accessory Structure)

Verified

Required for new single-family dwellings, residential additions, garages/workshops, and other residential construction in the unincorporated areas of La Paz County. The La Paz County Community Development Department (Building and Safety Division) administers the 2018 IRC/IBC for unincorporated areas outside Parker and Quartzsite. Fees are valuation-based per Table M-1 of the county's fee schedule.

Verified 2026-08-15 · Source

Requirements

  • Required for new single-family dwellings, additions, and structural alterations in unincorporated La Paz County exceeding $1,000 in value (A.R.S. §11-321)
  • Apply online through the County's iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or submit in person/by mail at 1112 Joshua Ave., Ste. 202, Parker, AZ 85344
  • Know your Assessor's Parcel Number (APN) before applying — search at http://publicrecords.lapazassessor.com/assessor/web/ (County staff cannot look this up for applicants)
  • Submit a site plan (title block, scale, north indicator, location map, property lines, structure locations/dimensions, setbacks to septic/wells) and complete building plans
  • Must use an Arizona-licensed contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption (A.R.S. §32-1121.A.5) for an owner-occupied, non-rental structure
  • Permits are void 180 days after submittal if incomplete (extensions available: 1st free, 2nd $40, 3rd+ $60); issued permits expire if work does not commence within 180 days (same extension fee structure)

Required documents

  • RequiredSite PlanMust show title block (project name, APN, address), engineer scale (e.g. 1:50), north indicator, location map with easements/roads/rights-of-way, all property lines with dimensions, and location/distance of new and existing structures relative to property lines, septic, and wells. Required per the County's online portal Building Permit Application Requirements.
  • RequiredBuilding PlansComplete construction plan set for the proposed work, submitted through the iworq Citizen Portal or in person
  • OptionalSpecial Power of Attorney (Agent or Lessee)Required if a property owner is appointing an agent, or leasing land to someone authorized to build/develop; forms available via the iworq Citizen Portal

Fee schedule

Fee typeAmountNotes
Building permit fee — valuation-based (Table M-1)$1–$500: $50.00; $501–$2,000: $50.00 for first $500 plus $4.00 per additional $100 (or fraction) to $2,000; $2,001–$25,000: $110.00 for first $2,000 plus $16.00 per additional $1,000 (or fraction) to $25,000; $25,001–$50,000: $478.00 for first $25,000 plus $12.00 per additional $1,000 to $50,000; $50,001–$100,000: $780.00 for first $50,000 plus $8.00 per additional $1,000 to $100,000; $100,001–$500,000: $1,180.00 for first $100,000 plus $6.00 per additional $1,000 to $500,000; $500,001–$1,000,000: $3,580.00 for first $500,000 plus $6.00 per additional $1,000 to $1,000,000; $1,000,001+: $6,580.00 for first $1,000,000 plus $2.70 per additional $1,000 (or fraction thereof), Maximum Permit Fee: $250,000
Resolution No. 2026-11, Exhibit A (Schedule of Building Permit Fees), implementation date August 6, 2026 — Resolution No. Show full citation

Resolution No. 2026-11, Exhibit A (Schedule of Building Permit Fees), implementation date August 6, 2026 — Resolution No. 2026-11 superseded Resolution No. 2025-05 in its entirety as of that date (recorded 2026-02714, page 2 of 14: 'Resolution No 2025-05 be superseded in its entirety by Resolution 2026-11, including Exhibits thereto'). Valuation based on ICC Building Valuation Data published Feb. 27, 2026, updated annually without further Board action (Resolution No. 2026-11, page 11 of 13, 'Valuation Data Determination and Update to Resolution').

Plan review fee65% of the calculated building permit fee
Ordinance No. 2024-02, Section 104(C); Resolution No. Show full citation

Ordinance No. 2024-02, Section 104(C); Resolution No. 2026-11, Exhibit D 'Plan Review Fees' table, category A (Commercial/Residential), page 11 of 13. Paid at time of submittal. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Utilities (mechanical/plumbing/electrical) — per trade, if not folded into new construction sq.-ft. feeUp to $5,000 valuation: $50.00 flat per trade; $5,001+: building permit fee per Table M-1Resolution No. 2026-11, Exhibit D, 'Utilities' table, page 9 of 13. Re-verified unchanged.
Investigation fee (work started without a permit)Equal to the permit fee (total due = double the permit fee); $100 minimum
Ordinance No. 2024-02, Section 104(G); Resolution No. Show full citation

Ordinance No. 2024-02, Section 104(G); Resolution No. 2026-11, Exhibit D, page 6 of 13 ('ALL WORK STARTED WITHOUT AN APPROVED PERMIT SHALL BE ASSESSED AN INVESTIGATION FEE EQUAL AND IN ADDITION TO THE REQUIRED PERMIT FEE...THE MINIMUM AMOUNT MAY NOT BE LESS THAN $100.00'). Re-verified unchanged.

Reinspection fee$60.00 per inspectionResolution No. 2026-11, Exhibit D 'Inspection Fees' table, page 11 of 13 ('A. REINSPECTION FEE — $60.00 PER INSPECTION'). Re-verified unchanged from Resolution No. 2025-05.

Commercial Building Permit (New Construction, Tenant Improvement, Shell Building)

Verified

Required for new commercial construction, tenant improvements, and shell buildings in the unincorporated areas of La Paz County. Fees are valuation-based per Table M-1, with tenant improvement and shell-building categories subject to per-square-foot rates published in the county fee schedule.

Verified 2026-08-15 · Source

Requirements

  • Required for all new commercial construction, tenant improvements, remodels, and shell buildings in unincorporated La Paz County
  • Apply through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • Submit site plan and complete construction plans; commercial cost-per-square-foot valuation follows the ICC Building Valuation Data table (Exhibit C of the fee schedule) by occupancy group and construction type
  • Must use an Arizona-licensed contractor (A.R.S. §32-1151)

Required documents

  • RequiredSite Plan and Construction PlansComplete commercial plan set including occupancy classification and construction type, submitted through the iworq Citizen Portal

Fee schedule

Fee typeAmountNotes
Building permit fee — valuation-based (Table M-1)Same schedule as residential: $1–$500: $50.00; scaling up to $6,580.00 for the first $1,000,000 plus $2.70 per additional $1,000 (or fraction thereof) for valuations over $1,000,000, Maximum Permit Fee: $250,000
Resolution No. 2026-11, Exhibit A (Schedule of Building Permit Fees), implementation date August 6, 2026 — supersedes Resolution No. Show full citation

Resolution No. 2026-11, Exhibit A (Schedule of Building Permit Fees), implementation date August 6, 2026 — supersedes Resolution No. 2025-05 in its entirety. Valuation for commercial buildings is calculated using ICC Building Valuation Data cost-per-square-foot by occupancy group and construction type (Exhibit C of Resolution No. 2026-11, published by ICC 2/27/2026).

Tenant improvement — first-time build-out$50.00 per sq. ft. (or actual construction cost estimate as determined by the Building Official)Resolution No. 2026-11, Exhibit D 'Tenant Improvements' table, page 9 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.
Tenant improvement — remodel space$35.00 per sq. ft. (or actual construction cost estimate as determined by the Building Official)Resolution No. 2026-11, Exhibit D 'Tenant Improvements' table, page 9 of 13. Re-verified unchanged.
Shell building — wood$50.00 per sq. ft.Resolution No. 2026-11, Exhibit D 'Shell Building' table, page 8 of 13. Shell buildings are defined as buildings with no interior trades installed and no specific use/tenant noted. Re-verified unchanged.
Shell building — concrete/masonry$65.00 per sq. ft.Resolution No. 2026-11, Exhibit D 'Shell Building' table, page 8 of 13. Re-verified unchanged.
Plan review fee65% of the calculated building permit feeOrdinance No. 2024-02, Section 104(C); Resolution No. 2026-11, Exhibit D 'Plan Review Fees' table, category A, page 11 of 13. Re-verified unchanged.

Manufactured Home / Park Model / Factory-Built Building Placement Permit

Required for placement of any manufactured home, park model trailer, container, or factory-built building on privately owned parcels in unincorporated La Paz County. Homes manufactured before June 15, 1976 cannot be placed anywhere in the county. Fees for manufactured home placement and plan review follow the Arizona Department of Housing (state) fee schedule rather than the county's own valuation table; park model placement is a county flat fee.

Reviewed 2026-08-15 · Source

Requirements

  • Manufactured homes, park models, containers, and RVs placed on privately owned parcels all require a placement permit prior to placement/use
  • Homes manufactured before June 15, 1976 CANNOT be placed anywhere in La Paz County (A.R.S. §41-4048(C) rehabilitation certificate requirement)
  • A HUD label certifying the home was inspected/constructed to HUD requirements in effect at time of manufacture constitutes proof of compliance, provided manufacture date is not before June 15, 1976
  • Installation must be performed by an installer licensed by the Arizona Department of Housing, even when the county issues the permit to the property owner
  • Manufactured homes/park models may not be occupied until the placement permit is approved AND a final inspection is performed and approved
  • Manufactured homes converted to storage buildings must be accessory to an established residential use, cannot be larger than or attached to the residence, cannot be used as a dwelling/guest house, cannot be connected to water/sewer/gas, and must have kitchen/bathroom fixtures removed

Required documents

  • RequiredHUD Compliance Label / CertificationLabel certifying the manufactured home was inspected and constructed to HUD requirements in effect at time of manufacture; required proof the home was manufactured on/after June 15, 1976
  • OptionalLa Paz County Assessor's Affidavit of AffixtureRequired when converting a manufactured home to an accessory/storage use per Ordinance No. 2024-02 Section 103(N)(5)(i)
  • RequiredArizona Department of Housing Installer LicenseVerification that the installer performing the manufactured home installation holds a current ADOH installer license; search at https://housing.az.gov/general-public/manufactured-housing/licensing/license-search

Fee schedule

Fee typeAmountNotes
Manufactured home placementPer State Schedule (Arizona Department of Housing statute)Resolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item A. Set by state statute, not the county's own valuation table.
Plan review for manufactured homesPer State Schedule (Arizona Department of Housing statute)Resolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item B.
Placement of park models$650.00 flat feeResolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item C ('PLACEMENT OF EACH PARK MODEL** — $650.00 FLAT FEE'). Re-verified unchanged.
Placement of each recreational vehicle$400.00 flat feeResolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item D ('PLACEMENT OF EACH RECREATIONAL VEHICLE — $400.00 FLAT FEE').
Factory-built buildings (FBB) — residential or commercialPer State Schedule (Arizona Department of Housing statute)Resolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, items E (residential) and F (commercial).
Container placement$200.00 flat feeResolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item H. Re-verified unchanged.
Reinspection$60.00Resolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item G. Re-verified unchanged.
Six (6) month extension on permit (mobile/manufactured home and FBB)Per State Schedule (Arizona Department of Housing statute)Resolution No. 2026-11, Exhibit D 'Placement' table, page 8 of 13, item I.

Mechanical / Plumbing / Electrical Permit

Verified

Required for standalone mechanical, plumbing, or electrical work not part of a new-construction building permit in unincorporated La Paz County, under the 2018 IMC/IPC/IFGC and 2020 NEC. Small-valuation trade work is billed a flat per-trade fee; larger work is billed under the standard building-permit valuation table.

Verified 2026-08-15 · Source

Requirements

  • Required for mechanical, plumbing, or electrical installations and repairs not covered under an active building permit
  • Apply through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • New construction/addition mechanical, electrical, and plumbing trade fees are billed per square foot IN ADDITION TO the building permit square-footage fee
  • Combined permits are available for single equipment installations covering two trades at once (e.g., electrical + mechanical for A/C units; electrical + plumbing for water heaters)

Required documents

  • RequiredOnline Permit Center ApplicationAll mechanical/plumbing/electrical permits are applied for through the iworq Citizen Portal

Fee schedule

Fee typeAmountNotes
Single permit — mechanical, plumbing, or electrical (each trade), up to $5,000 valuation$50.00 flat per tradeResolution No. 2026-11, Exhibit D 'Utilities' table, page 9 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.
Single permit — mechanical, plumbing, or electrical (each trade), $5,001+ valuationBuilding permit fee per Table M-1Resolution No. 2026-11, Exhibit D 'Utilities' table, page 9 of 13. Re-verified unchanged.
Combined permit for single equipment installation, up to $5,000 valuation$75.00 flat feeResolution No. 2026-11, Exhibit D 'Combined Permit for Single Equipment Installations' table, page 9 of 13. Example: electrical + mechanical for A/C units; electrical + plumbing for water heaters. Re-verified unchanged.
Combined permit for single equipment installation, $5,001+ valuationBuilding permit fee only, per valuation (Table M-1)Resolution No. 2026-11, Exhibit D 'Combined Permit for Single Equipment Installations' table, page 9 of 13. Re-verified unchanged.
New construction or addition — mechanical$1.50 per sq. ft. (in addition to building permit sq.-ft. fees)Resolution No. 2026-11, Exhibit D 'For New Construction or Addition' table, page 10 of 13. Re-verified unchanged.
New construction or addition — electrical$2.50 per sq. ft. (in addition to building permit sq.-ft. fees)Resolution No. 2026-11, Exhibit D 'For New Construction or Addition' table, page 10 of 13. Re-verified unchanged.
New construction or addition — plumbing$3.50 per sq. ft. (in addition to building permit sq.-ft. fees)Resolution No. 2026-11, Exhibit D 'For New Construction or Addition' table, page 10 of 13. Re-verified unchanged.
RV/mobile home park — electrical/plumbing per space$82.50 each trade flat fee; or $50.00 flat for first space plus $10.00 per additional space inspected at the same timeResolution No. 2026-11, Exhibit D 'RV/Mobile Home Parks' table, page 10 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Swimming Pool / Spa / Jacuzzi Permit

Verified

Required for swimming pools, spas, hot tubs, and whirlpools in unincorporated La Paz County under the 2018 International Swimming Pool and Spa Code. Pool fees are based on surface area; spas/jacuzzis are a flat fee.

Verified 2026-08-15 · Source

Requirements

  • Permit required for swimming pools, spas, jacuzzis, and whirlpools in unincorporated La Paz County
  • Apply through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit)
  • Comply with the 2018 International Swimming Pool and Spa Code as adopted by Ordinance No. 2024-02, Section 101.1(A)(8)

Required documents

  • RequiredSite Plan showing pool/spa locationSite plan showing pool or spa location, setbacks, and surface area calculation

Fee schedule

Fee typeAmountNotes
Swimming pool — per square foot of surface area$25.00 per sq. ft.Resolution No. 2026-11, Exhibit D 'Swimming Pool' table, page 9 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.
Spa / Jacuzzi / Whirlpool$200.00 flat fee eachResolution No. 2026-11, Exhibit D 'Spa / Jacuzzi / Whirlpool' table, page 9 of 13. Re-verified unchanged.
Plan review fee65% of the calculated building permit feeResolution No. 2026-11, Exhibit D 'Plan Review Fees' table, category A (Commercial/Residential), page 11 of 13. Re-verified unchanged.

Grading Permit

Verified

Required for grading work in unincorporated La Paz County per 2018 International Building Code Appendix J, except as exempted. Fees scale with cubic yardage of cut or fill; larger projects and those in mapped FEMA flood zones require an engineered grading and drainage plan.

Verified 2026-08-15 · Source

Requirements

  • Required per 2018 IBC J103.1 except as exempted in Section J103.2 — no grading shall be performed without first obtaining a permit from the Building Official
  • A grading permit does NOT include construction of retaining walls or other structures — those require separate permits
  • Grading projects under 100 cu. yds. of cut/fill that may adversely affect drainage may be required to submit an engineered grading and drainage plan
  • Grading projects exceeding 100 cu. yds. of cut or fill SHALL have an engineered grading and drainage plan
  • Grading or fill projects located in a mapped FEMA flood zone shall have an engineered grading and drainage plan suitable for submittal to ADWR and FEMA

Required documents

  • OptionalEngineered Grading and Drainage PlanRequired for projects exceeding 100 cu. yds. of cut/fill, or any project in a mapped FEMA flood zone (suitable for ADWR/FEMA submittal)

Fee schedule

Fee typeAmountNotes
0 to 50 cu. yds.$50.00 flat feeResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.
51 to 100 cu. yds.$75.00 flat feeResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.
101 to 1,000 cu. yds.$75.00 for the first 100 cu. yds. plus $15.00 for each additional 100 cu. yds. or fraction thereofResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13, implementation date August 6, 2026 — supersedes Resolution No. 2025-05.
1,001 to 10,000 cu. yds.$210.00 for the first 1,000 cu. yds. plus $15.00 for each additional 1,000 cu. yds. or fraction thereofResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13, implementation date August 6, 2026 — supersedes Resolution No. 2025-05.
10,001 to 100,000 cu. yds.$345.00 for the first 10,000 cu. yds. plus $25.00 for each additional 10,000 cu. yds. or fraction thereofResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13, implementation date August 6, 2026 — supersedes Resolution No. 2025-05.
100,001 cu. yds. and above$570.00 for the first 100,000 cu. yds. plus $25.00 for each additional 100,000 cu. yds. or fraction thereofResolution No. 2026-11, Exhibit D 'Grading' table, page 7 of 13, implementation date August 6, 2026 — supersedes Resolution No. 2025-05.
Grading plan review above 10,000 cu. yds.Actual cost of County Engineer (consultant) review feeResolution No. 2026-11, Exhibit D 'Grading' table, note 4, page 7 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Demolition Permit

Verified

Required prior to any demolition in unincorporated La Paz County. Billed per Assessor's Parcel Number (APN), covering all structures on that parcel.

Verified 2026-08-15 · Source

Requirements

  • Demolition permit required prior to ANY demolition (Applications & Checklists page: 'DEMOLITION PERMIT: required prior to any demo')
  • Apply through the iworq Citizen Portal or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • Contact Arizona 811 (call 811 or az811.com) before demolition to locate underground utilities

Required documents

  • RequiredOnline Permit Center ApplicationDemolition permits are applied for through the iworq Citizen Portal

Fee schedule

Fee typeAmountNotes
Demolition — structure(s)$40.00 per Assessor's Parcel Number (APN) — all structures on that parcel includedResolution No. 2026-11, Exhibit D 'Demolition' table, page 6 of 13. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Solar Installation Permit

Verified

La Paz County publishes a distinct 'Solar Installation' fee line item, separate from its general building-permit fee table, for rooftop and ground-mounted residential/commercial PV installations in unincorporated La Paz County. It also charges a discounted 50% plan-review rate for solar (vs. the standard 65% rate for commercial/residential building permits), confirmed by direct visual review of Resolution No. 2026-11, Exhibit D (Fee Schedule, implementation date August 6, 2026, superseding Resolution No. 2025-05 in its entirety), pages 10-11. Electrical interconnection is billed additionally under the county's standard electrical utility fee, per the fee schedule's note that solar fees are 'plus the value of any utilities installed.'

Verified 2026-08-15 · Source

Requirements

  • Solar Installation Permit required for PV system installation in unincorporated La Paz County, applied through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • Site plan showing panel/array location, and complete plans for the installation, per the county's standard building-permit submittal requirements
  • Must use an Arizona-licensed contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption
  • Electrical interconnection work is billed additionally under the county's Utilities fee schedule (a separate Electrical trade permit) — the Solar Installation fee line is explicitly 'PLUS THE VALUE OF ANY UTILITIES INSTALLED' per the fee schedule
  • Per statewide A.R.S. § 11-323 (Solar construction permits; standards), the county's required plan content is limited to system location/roof plan/elevation, panel mounting details, and a one-line/three-line electrical diagram (waived if a qualified online automated permitting platform is used), and the county may not require a professional engineer's stamp absent a written justification

Required documents

  • RequiredSite Plan and Building Plans (iworq Citizen Portal)Site plan showing panel/array location and complete installation plans, submitted through the same portal used for other county building permits

Fee schedule

Fee typeAmountNotes
Solar Installation — up to $5,000 valuation$150.00 flat fee
Resolution No. 2026-11, Exhibit D (implementation date August 6, 2026), 'Solar Installation' table, page 10 of 13 — directly confirmed by visual review of the county's recorded fee-schedule PDF. Show full citation

Resolution No. 2026-11, Exhibit D (implementation date August 6, 2026), 'Solar Installation' table, page 10 of 13 — directly confirmed by visual review of the county's recorded fee-schedule PDF. Fee is 'PLUS THE VALUE OF ANY UTILITIES INSTALLED' (i.e., the separate electrical trade fee). Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Solar Installation — $5,001 or more valuationBuilding Permit Fee, per Table M-1 valuation schedule
Resolution No. 2026-11, Exhibit D, 'Solar Installation' table, page 10 of 13. Show full citation

Resolution No. 2026-11, Exhibit D, 'Solar Installation' table, page 10 of 13. Most residential rooftop PV systems (typically well above $5,000 in installed cost) will fall in this tier and be billed the same valuation-based fee as the general Residential Building Permit (note the top valuation tier of that schedule changed in Resolution No. 2026-11 — see the Residential Building Permit entry).

Plan Review Fee — Solar Systems50% of Building Permit Fee
Resolution No. 2026-11, Exhibit D, 'Plan Review Fees' table, item D, page 11 of 13 — a discounted rate compared to the standard 65% Commercial/Residential plan review fee, confirmed by direct visual review. Show full citation

Resolution No. 2026-11, Exhibit D, 'Plan Review Fees' table, item D, page 11 of 13 — a discounted rate compared to the standard 65% Commercial/Residential plan review fee, confirmed by direct visual review. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Electrical utility fee (interconnection, billed separately from the Solar Installation fee)Up to $5,000 valuation: $50.00 flat; $5,001+: Building Permit Fee per Table M-1Resolution No. 2026-11, Exhibit D, 'Utilities' table, page 9 of 13 — the same electrical-trade fee documented in this jurisdiction's Mechanical/Plumbing/Electrical Permit entry. Re-verified unchanged.

EV Charger / EVSE Permit

Verified

La Paz County does not publish a distinct fee line item for electric vehicle charging equipment (EVSE) in its Fee Schedule (Resolution No. 2026-11, Exhibit D, which supersedes Resolution No. 2025-05 in its entirety effective 8/6/2026). Installation of a Level 2 EV charger or similar equipment requires a standard Electrical Permit, billed under the same "Utilities" (electrical trade) fee table used for all other electrical work, under the adopted 2020 NEC (which includes Article 625, Electric Vehicle Power Transfer System). No EVSE-specific expedited process, flat fee, or SolarAPP+-style instant permitting platform was found for La Paz County.

Verified 2026-08-15 · Source

Requirements

  • Electrical Permit required for EV charger/EVSE installation in unincorporated La Paz County, applied through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • Installation must comply with the adopted 2020 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System)
  • Must use an Arizona-licensed electrical contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption
  • No distinct EV charger/EVSE fee line, expedited timeline, or online instant-permitting platform was found published by the county as of this review

Required documents

  • RequiredOnline Permit Center Application (iworq Citizen Portal)Electrical permit application for EV charger/EVSE circuit and equipment installation

Fee schedule

Fee typeAmountNotes
Electrical Permit (EV charger/EVSE circuit) — up to $5,000 valuation$50.00 flat fee
Resolution No. 2026-11 (adopted 7/6/2026, implementation date 8/6/2026), Exhibit D, "UTILITIES" table, page 9 of 13 of the recorded resolution (2026-02714) — directly re-chased and confirmed by… Show full citation

Resolution No. 2026-11 (adopted 7/6/2026, implementation date 8/6/2026), Exhibit D, "UTILITIES" table, page 9 of 13 of the recorded resolution (2026-02714) — directly re-chased and confirmed by rendering the full recorded PDF at lapaz.gov/DocumentCenter/View/9777 to page images. The same flat electrical-trade fee is billed for all standalone electrical permits; La Paz County does not publish a distinct EV charger/EVSE fee line. Re-verified unchanged from Resolution No. 2025-05, which Resolution No. 2026-11 supersedes effective 8/6/2026.

Electrical Permit (EV charger/EVSE circuit) — $5,001+ valuationBuilding Permit Fee per Exhibit B Valuation and Fee Schedule (e.g. $780.00 for the first $50,000 plus $8.00 per additional $1,000 in the $50,001-$100,000 tier)
Resolution No. 2026-11, Exhibit D "UTILITIES" table (references Exhibit A/B's Valuation and Fee Schedule for the $5,001+ tier) — directly re-chased and confirmed. Show full citation

Resolution No. 2026-11, Exhibit D "UTILITIES" table (references Exhibit A/B's Valuation and Fee Schedule for the $5,001+ tier) — directly re-chased and confirmed. The $50,001-$100,000 example tier quoted here is unchanged from Resolution No. 2025-05; note that the top tier of this same valuation schedule (over $1,000,000) did change in Resolution No. 2026-11 — see the Residential Building Permit entry for that figure.

Sources & verification

Verified against official sources. Last reviewed 2026-08-15.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated La Paz County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-08-16) →View current record →All versions →

Permalink: /arizona/la-paz-county/unincorporated-la-paz/as-of/2026-08-15/

Snapshot date: 2026-08-15

Commit: 6a7ceb3

Reproducible from PermitBase’s version-controlled dataset, commit 6a7ceb3.