Skip to main content
PermitBase

Unincorporated La Paz County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated La Paz County, Arizona.

Last verified 2026-07-07 · Source · Embed this page’s badge · Version history

Building department

Address
1112 Joshua Avenue, Suite 202, Parker, AZ 85344
Phone
928-669-6138
Office hours
Permit paper applications normally accepted Monday–Thursday (excluding holidays), 7:00 AM – 6:00 PM, at La Paz County Community Development, 1112 Joshua Ave., Ste. 202, Parker, AZ 85344. Source: La Paz County Building Code Ordinance No. 2024-02, Section 103.A. General county line: 928-669-6115.

Inspection guide

See how inspections work in Unincorporated La Paz County — sequence, scheduling & re-inspection fees.

Codes adopted

Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), including Appendix C, H, I, and J — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(1), effective October 17, 2024
  • 2018 International Residential Code (IRC), including Appendix A, B, G, H, P, and Q — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(9)
  • 2018 International Existing Buildings Code (IEBC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(3)
  • 2018 International Mechanical Code (IMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(4)
  • 2018 International Plumbing Code (IPC), including Appendix C and E — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(5)
  • 2018 International Fuel Gas Code (IFGC), including Appendix A, B, and C — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(6)
  • 2018 International Property Maintenance Code (IPMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(7)
  • 2018 International Swimming Pool and Spa Code (ISPSC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(8)
  • 2018 International Fire Code (IFC), including Appendix B, C, D, E, F, and I — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(10)
  • 2020 National Electrical Code (NEC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(2)

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
5units

5 buildings · $804,893 valuation

Trailing 12 months
70units

12 of 12 months reported · #46 in Arizona coverage by units

Year to date (2026 YTD through 2026-05)
33units

33 buildings · $5.2M valuation

Full year 2025
62units

62 buildings · $10.1M valuation

County-wide figures: Verified against the Census Bureau's 2020 AZ county reference file (www2.census.gov/geo/docs/reference/codes2020/cou/st04_az_cou2020.txt): AZ|04|012|00043540|La Paz County. BPS reports county-wide totals; jurisdiction is the unincorporated remainder outside Parker and Quartzsite, which are separately incorporated and filed elsewhere in this KB (parker-az.json, quartzsite.json).

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity

Tips & gotchas

  • Apply for permits through the County's iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit), or in person/by mail at 1112 Joshua Ave., Ste. 202, Parker, AZ 85344. Paper applications are accepted Monday–Thursday, 7:00 AM–6:00 PM (closed Fridays and holidays).
  • Know your Assessor's Parcel Number (APN) before applying — the County will not search it for you. Look it up at http://publicrecords.lapazassessor.com/assessor/web/.
  • Only Arizona-licensed contractors may pull permits for construction work (A.R.S. §32-1151); verify any contractor at https://roc.az.gov/search/node/roc%20contractorsearch before hiring. An owner-builder exemption applies only for owner-occupied, non-rental, non-public-facing structures the owner builds personally.
  • Manufactured homes built before June 15, 1976 CANNOT be placed anywhere in unincorporated La Paz County (A.R.S. §41-4048(C)).
  • Permit applications are void 180 days after submittal if incomplete; issued building permits expire if work has not commenced within 180 days. Extensions: 1st free, 2nd $40, 3rd+ $60 (max 180 additional days per extension).
  • Starting work without an approved permit triggers an Investigation Fee equal to the permit fee — total amount due becomes DOUBLE the normal permit fee, with a $100 minimum.
  • The County publishes a two-phase review-timeline document under A.R.S. §11-1605: Administrative Completeness review (up to ~40 working days across 3 rounds) followed by Substantive Review (up to 105 working days, extendable to 165 working days for technically complex projects). See https://www.lapaz.gov/DocumentCenter/View/9418.
  • Plan review fee is 65% of the calculated building permit fee for most permit types (50% for solar and tower permits per the fee schedule's Plan Review Fees table); paid at time of submittal.
  • This file covers the Building and Safety Division's construction-permitting program only. La Paz County's Community Development Department also separately administers Planning & Zoning (rezone, variance, conditional use), Wastewater/Septic (Environmental Quality Review), and Code Compliance — see https://www.lapaz.gov/346/Community-Development---GIS for those programs.
  • This file covers ONLY the unincorporated areas of La Paz County (excluding Indian Reservations). The incorporated Town of Parker (parker-az.json) and City of Quartzsite (quartzsite.json) each administer and enforce their own, separate building codes and are not covered by this file.
  • Temporary Certificate of Occupancy costs $500 (residential or commercial), valid 30 days, and must be renewed at $500 every 30 days until the permanent Certificate of Occupancy is issued.
  • Building valuation is based on the most current ICC Building Valuation Data and is updated annually without further Board of Supervisors action, per Resolution No. 2025-05.

Related guides

Comparable nearby cities

Parker
Both in La Paz County5 shared permit types
Compare fees →
Quartzsite
Both in La Paz County5 shared permit types
Compare fees →