EV Charger / EVSE Permit in Unincorporated La Paz County, Arizona
La Paz County does not publish a distinct fee line item for electric vehicle charging equipment (EVSE) in its Fee Schedule (Resolution No. 2025-05, Exhibit D). Installation of a Level 2 EV charger or similar equipment requires a standard Electrical Permit, billed under the same "Utilities" (electrical trade) fee table used for all other electrical work, under the adopted 2020 NEC (which includes Article 625, Electric Vehicle Power Transfer System). No EVSE-specific expedited process, flat fee, or SolarAPP+-style instant permitting platform was found for La Paz County.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for EV charger/EVSE installation in unincorporated La Paz County, applied through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
- Installation must comply with the adopted 2020 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System)
- Must use an Arizona-licensed electrical contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption Owner-builder
- No distinct EV charger/EVSE fee line, expedited timeline, or online instant-permitting platform was found published by the county as of this review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Electrical
EVSE circuit, breaker, disconnect, and equipment mounting inspected for compliance with adopted 2020 NEC Article 625
See the full Unincorporated La Paz County inspection guide — scheduling & re-inspection fees →
Tips
- La Paz County has no distinct EV charger/EVSE fee — budget for the standard $50 flat Electrical Permit (Utilities table) for a typical residential installation under $5,000 in valuation.
- Confirm directly with La Paz County Community Development (928-669-6138) whether any SolarAPP+-style automated permitting option has since been added for EVSE, since none was found published as of this review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated La Paz County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated La Paz County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →