EV Charger / EVSE Permit in Unincorporated La Paz County, Arizona

La Paz County does not publish a distinct fee line item for electric vehicle charging equipment (EVSE) in its Fee Schedule (Resolution No. 2025-05, Exhibit D). Installation of a Level 2 EV charger or similar equipment requires a standard Electrical Permit, billed under the same "Utilities" (electrical trade) fee table used for all other electrical work, under the adopted 2020 NEC (which includes Article 625, Electric Vehicle Power Transfer System). No EVSE-specific expedited process, flat fee, or SolarAPP+-style instant permitting platform was found for La Paz County.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit required for EV charger/EVSE installation in unincorporated La Paz County, applied through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ
  • Installation must comply with the adopted 2020 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System)
  • Must use an Arizona-licensed electrical contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption Owner-builder
  • No distinct EV charger/EVSE fee line, expedited timeline, or online instant-permitting platform was found published by the county as of this review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit (EV charger/EVSE circuit) — up to $5,000 valuationResolution No. 2025-05 (adopted 7/7/2025, effective 8/6/2025), Exhibit D, "UTILITIES" table, page 9 of the recorded resolution (2025-02417) — directly re-chased and confirmed by reading the full recorded PDF at lapaz.gov/DocumentCenter/View/9685. The same flat electrical-trade fee is billed for all standalone electrical permits; La Paz County does not publish a distinct EV charger/EVSE fee line.
$50.00 flat fee
Electrical Permit (EV charger/EVSE circuit) — $5,001+ valuationResolution No. 2025-05, Exhibit D "UTILITIES" table (references Exhibit B's Valuation and Fee Schedule for the $5,001+ tier) — directly re-chased and confirmed; corrects a prior reference to a non-existent "Table M-1" — the county's actual valuation table is Exhibit B of this same Resolution.
Building Permit Fee per Exhibit B Valuation and Fee Schedule (e.g. $780.00 for the first $50,000 plus $8.00 per additional $1,000 in the $50,001-$100,000 tier)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated La Paz County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Electrical

    EVSE circuit, breaker, disconnect, and equipment mounting inspected for compliance with adopted 2020 NEC Article 625

See the full Unincorporated La Paz County inspection guide — scheduling & re-inspection fees →

Tips

  • La Paz County has no distinct EV charger/EVSE fee — budget for the standard $50 flat Electrical Permit (Utilities table) for a typical residential installation under $5,000 in valuation.
  • Confirm directly with La Paz County Community Development (928-669-6138) whether any SolarAPP+-style automated permitting option has since been added for EVSE, since none was found published as of this review.

Frequently asked questions

Unincorporated La Paz County requires an ev charger / evse permit for: Electrical Permit required for EV charger/EVSE installation in unincorporated La Paz County, applied through the iworq Citizen Portal (https://lapazcountyapplypermit.portal.iworq.net/portalhome/lapazcountyapplypermit) or in person at 1112 Joshua Ave., Ste. 202, Parker, AZ; Installation must comply with the adopted 2020 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System); Must use an Arizona-licensed electrical contractor (A.R.S. §32-1151), unless qualifying for the owner-builder exemption; No distinct EV charger/EVSE fee line, expedited timeline, or online instant-permitting platform was found published by the county as of this review. If your project isn't listed, confirm with La Paz County Community Development Department — Building and Safety Division at 928-669-6138 before starting work.

No distinct EV charger/EVSE fee line item is published. Installation is billed under the standard Electrical Permit ("Utilities" fee table): $50 flat for work valued up to $5,000, or the standard Table M-1 building-permit valuation fee above that. Source: Resolution No. 2025-05, Exhibit D (https://www.lapaz.gov/DocumentCenter/View/9292).

Unincorporated La Paz County does not publish a plan-review timeline for this permit. Contact La Paz County Community Development Department — Building and Safety Division at 928-669-6138 for current turnaround.

You'll need: Online Permit Center Application (iworq Citizen Portal). See the required-documents checklist on this page for details on each.

Unincorporated La Paz County requires 1 inspection(s) for an ev charger / evse permit, in order: Final Electrical. Schedule each through La Paz County Community Development Department — Building and Safety Division (928-669-6138).

Apply through La Paz County Community Development Department — Building and Safety Division at 1112 Joshua Avenue, Suite 202, Parker, AZ 85344. Phone: 928-669-6138, email: Comdev@lapaz.gov. Office hours: Permit paper applications normally accepted Monday–Thursday (excluding holidays), 7:00 AM – 6:00 PM, at La Paz County Community Development, 1112 Joshua Ave., Ste. 202, Parker, AZ 85344. Source: La Paz County Building Code Ordinance No. 2024-02, Section 103.A. General county line: 928-669-6115.. Official information: https://www.lapaz.gov/589/BUILDING-SAFETY-PERMITS.

Unincorporated La Paz County, Arizona has adopted: 2018 International Building Code (IBC), including Appendix C, H, I, and J — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(1), effective October 17, 2024; 2018 International Residential Code (IRC), including Appendix A, B, G, H, P, and Q — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(9); 2018 International Existing Buildings Code (IEBC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(3); 2018 International Mechanical Code (IMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(4); 2018 International Plumbing Code (IPC), including Appendix C and E — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(5); 2018 International Fuel Gas Code (IFGC), including Appendix A, B, and C — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(6); 2018 International Property Maintenance Code (IPMC), including Appendix A — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(7); 2018 International Swimming Pool and Spa Code (ISPSC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(8); 2018 International Fire Code (IFC), including Appendix B, C, D, E, F, and I — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(10); 2020 National Electrical Code (NEC) — adopted by reference, Building Code Ordinance No. 2024-02, Section 101.1(A)(2). Local amendments apply — see the Unincorporated La Paz County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated La Paz County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.