Unincorporated La Paz County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated La Paz County, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
1112 Joshua Avenue, Suite 202, Parker, AZ 85344
Phone
928-669-6138
Office hours
Permit paper applications normally accepted Monday–Thursday (excluding holidays), 7:00 AM – 6:00 PM, at La Paz County Community Development, 1112 Joshua Ave., Ste. 202, Parker, AZ 85344. Source: La Paz County Building Code Ordinance No. 2024-02, Section 103.A. General county line: 928-669-6115.

Inspection sequence

Applies to: Commercial Building Permit (New Construction, Tenant Improvement, Shell Building)

  1. 1

    Footing/Foundation

    Before concrete pour, per 2018 IBC

  2. 2

    Framing / Structural

    After structural framing complete, before wall cover

  3. 3

    Final

    All work complete per approved plans; Certificate of Occupancy issued (included in permit fee; Temporary C of O is a separate $500 fee, renewable every 30 days)

Applies to: Residential Building Permit (New Construction, Addition, Accessory Structure)

  1. 1

    Footing/Foundation

    Before concrete pour — verify footing depth, dimensions, and reinforcement per 2018 IRC/IBC

  2. 2

    Framing

    After framing, sheathing, and rough-in trades complete — before insulation or wall cover

  3. 3

    Final

    All work complete per approved plans; schedule via the iworq Citizen Portal or call 928-669-6138

Applies to: Manufactured Home / Park Model / Factory-Built Building Placement Permit

  1. 1

    Placement / Installation Inspection

    Verify installation per Arizona Department of Housing installation guidelines for manufactured homes

  2. 2

    Final

    Required before occupancy — home may not be occupied until the placement permit is approved and final inspection performed and approved

Applies to: Mechanical / Plumbing / Electrical Permit

  1. 1

    Rough-In

    Wiring, piping, or ductwork installed and inspected before wall cover or concealment

  2. 2

    Final

    All trade work complete and operational per adopted 2018 IMC/IPC/IFGC and 2020 NEC

Applies to: Solar Installation Permit

  1. 1

    Rough Electrical

    Wiring, combiners, and disconnects inspected before concealment, per adopted 2020 NEC

  2. 2

    Final

    Array mounting, bonding/grounding, and point of interconnection complete and operational

Applies to: Swimming Pool / Spa / Jacuzzi Permit

  1. 1

    Pre-Gunite / Steel

    Verify rebar, rough plumbing, and pool shell before gunite or shotcrete application per 2018 ISPSC/IRC

  2. 2

    Final

    All work complete; pool filled; equipment operational

Re-inspection fees

Residential Building Permit (New Construction, Addition, Accessory Structure)Reinspection fee · Fee Schedule (2025), Exhibit D 'Inspection Fees' table.
$60.00 per inspection
Manufactured Home / Park Model / Factory-Built Building Placement PermitReinspection · Fee Schedule (2025), Exhibit D 'Placement' table.
$60.00

Unincorporated La Paz County building permits

Get alerts for Unincorporated La Paz County

We'll email you when Unincorporated La Paz County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.