Skip to main content
PermitBase

This is PermitBase’s published record for Avondale as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Avondale building permits

Verified

Avondale, Arizona — as published 2026-07-20.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Avondale independently adopts and administers its own construction codes through its Development Services Department / Building Services Division; it does not defer permitting to Maricopa County. Source: City of Avondale Building Services Division page (avondaleaz.gov/government/departments/development-services/building-division/).2024 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Avondale amendments. Effective January 1, 2026 (per the City's 'Current Adopted Building Codes (effective January 1, 2026)' list). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document ('Building-Code-Adoption-Final.pdf').2024 International Residential Code (IRC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.2024 International Existing Building Code (IEBC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Avondale amendments (note: electrical code cycle is one edition behind the 2024 ICC set), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2023 National Electrical Code).2024 International Mechanical Code (IMC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.2024 International Plumbing Code (IPC), adopted by reference with City of Avondale amendments, effective January 1, 2026, including a burial-depth amendment to G2415.12/IFGC 404.12 and added stub-out/push-to-connect-valve provisions (P2605.1.1, P2605.1.2). Source: City of Avondale Building Code Adoption ordinance document.2024 International Fuel Gas Code (IFGC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.2024 International Energy Conservation Code (IECC), adopted by reference with City of Avondale amendments, effective January 1, 2026 (Manual J design criteria: elevation 1,101 ft, latitude 34°, outdoor summer design dry-bulb 108°F, outdoor winter design dry-bulb 33°F). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.2024 International Property Maintenance Code (IPMC), adopted by reference, effective January 1, 2026. Source: City of Avondale Building Services Division page.2024 International Swimming Pool and Spa Code (ISPSC), adopted by reference with City of Avondale amendments (including an amended barrier-height provision requiring a minimum 60-inch/5-foot barrier height, up from the model code's 48 inches), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2024 ISPSC, Section 305.2.1); City of Avondale Swimming Pool Requirements handout (rev. 10.26.2023).All work must be performed by a contractor licensed with the Arizona Registrar of Contractors (ROC), unless the property owner qualifies as an owner-builder under A.R.S. § 32-1121 (Building Permit Application, Standard Conditions and Applicant Certification, rev. 05.06.2026). Source: City of Avondale Building Permit Application.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the City of Avondale. Reviewed against the 2024 IRC and City of Avondale amendments (effective January 1, 2026). Applications are submitted electronically via the Avondale Citizen Portal (Accela Citizen Access).

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family and two-family (and, where not preempted by Arizona Revised Statutes, triplex/fourplex) dwelling construction within Avondale city limits
  • Plans must comply with the 2024 IRC and City of Avondale amendments, including Climatic and Geographic Design Criteria (105 mph wind, Exposure B; Seismic Design Category B; 0 ground snow load; moderate-to-heavy termite potential)
  • Required heating/cooling capable of maintaining a minimum 68°F and maximum 82°F (AC) or 88°F (evaporative cooling) at 3 ft above floor (IBC 1203.1)
  • Complete electronic submittal required per the Residential Submittal Checklist (rev. 12.31.2025): foundation/roof/framing plans, site plan, floor plan, elevations, energy compliance report (2024 IECC), electrical one-line diagram, load calculations, panel schedule, mechanical Manual J/D/S calculations, plumbing fixture/isometric calculations, structural calculations for engineered plans, soils/geotechnical report (new build and ADU)
  • Fire sprinkler plan required for residential submittals with 5,000 livable sq ft or greater (may be a deferred submittal); sprinklers are otherwise optional, not mandatory, under Avondale's amended IRC R309
  • Submittal via the Avondale Citizen Portal (Accela Citizen Access)
  • All work must be performed by an Arizona ROC-licensed contractor unless the owner qualifies as an owner-builder under A.R.S. § 32-1121

Required documents

  • RequiredBuilding Permit ApplicationCity of Avondale Building Permit Application (rev. 05.06.2026), including Standard Conditions acknowledgment and, where applicable, the A.R.S. § 32-1121 Owner-Builder disclosure and Property Owner's Authorization for Permitting form; submitted via the Avondale Citizen Portal
  • RequiredResidential Submittal ChecklistCity of Avondale Residential Submittal Checklist (rev. 12.31.2025) covering General, Structural, Architectural, Electrical, Mechanical, Plumbing, and Additional Documents submittal requirements
  • RequiredResidential Plan Review ChecklistCity of Avondale Residential Plan Review Checklist (2024 edition)
  • RequiredSite Plan / Foundation / Roof / Framing PlansLot coverage, setback dimensions, floor plan with labeled rooms, building thermal envelope depiction, and elevations (all sides) showing material/color and grade dimensions
  • RequiredSoils/Geotechnical ReportRequired for new-build residential construction and for ADUs, per the Residential Submittal Checklist

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (Tiers A–H)Tier A ($1–$500): $50; Tier B ($501–$2,000): $50 for the first $500 plus $5.00 per additional $100 (or fraction) to $2,000; Tier C ($2,001–$25,000): $125 for the first $2,000 plus $14.00 per additional $1,000 (or fraction) to $25,000; Tier D ($25,001–$50,000): $447 for the first $25,000 plus $14.00 per additional $1,000 to $50,000; Tier E ($50,001–$100,000): $797 for the first $50,000 plus $9.00 per additional $1,000 to $100,000; Tier F ($100,001–$500,000): $1,247 for the first $100,000 plus $8.00 per additional $1,000 to $500,000; Tier G ($500,001–$1,000,000): $4,477 for the first $500,000 plus $7.00 per additional $1,000 to $1,000,000; Tier H ($1,000,000+): $7,947 for the first $1,000,000 plus $5.00 per additional $1,000City of Avondale FY2026 Rates and Fees Schedule (effective 9/1/2025), Building Permit Fees, Resolution 3050-612 (7/18/2012 base tiers, dollar figures current per the FY2026 schedule)
Building Plan Review Fee (Building Review Fee)65% of the Building Permit FeeCity of Avondale FY2026 Rates and Fees Schedule, Building Plan Review Fees, Resolution 3050-612
Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725, effective 9/1/2025
Certificate of Occupancy$158.00City of Avondale FY2026 Rates and Fees Schedule, Certificate of Occupancy Fees, Resolution 1045-0725
4th Plan Review50% of First Review FeeCity of Avondale FY2026 Rates and Fees Schedule, Resolution 3203-614 (7/16/2014)

Residential Addition / Remodel / ADU Permit

Verified

Required for room additions, remodels, alterations, and Accessory Dwelling Units (ADUs) on existing single-family residential property in Avondale. Reviewed against the 2024 IRC as adopted and amended by the City, plus Zoning Ordinance Section 28-33(a) for ADUs specifically.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for room additions, interior alterations/remodels, and detached accessory structures over the 200-sq-ft permit-exempt threshold
  • ADUs additionally require zoning compliance review under Zoning Ordinance Section 28-33(a), performed as an integral part of the building plan submittal review
  • Alterations/Modifications/Remodels (AMR) valuations are calculated using the formula: Project Square Footage × BVD Base Rate × Alteration Multiplier, per the most recent February-published ICC Building Valuation Data Table
  • Detached one-story accessory structures (other than storm shelters) up to 200 sq ft, decks up to 200 sq ft under 30 inches above grade not attached to the dwelling, fences up to 7 ft, and retaining walls up to 4 ft do not require a permit (IRC R105.2 amendment)
  • Soils/geotechnical report required for ADU submittals per the Residential Submittal Checklist
  • Application type 'Accessory Dwelling Unit' is selectable directly on the Accela Citizen Access (ACA) portal building permit application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Avondale Citizen Portal; select Application Type 'Residential' and Purpose of Work 'Addition (Attached)', 'Alteration/Remodel (Interior)', or 'Accessory (Detached)' as applicable
  • RequiredResidential Submittal ChecklistCity of Avondale Residential Submittal Checklist (rev. 12.31.2025)
  • RequiredSite/Plot PlanShowing existing structure, addition/ADU footprint, lot coverage, and setback dimensions

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (Tiers A–H, using AMR valuation formula for alterations)Same Tier A–H schedule as new construction (see Residential Building Permit); AMR valuation = Project SF × BVD Base Rate × Alteration MultiplierCity of Avondale FY2026 Rates and Fees Schedule; City of Avondale Building Code Adoption ordinance, IRC/IBC Section 109.3.1 (AMR valuation formula)
Building Plan Review Fee65% of the Building Permit FeeCity of Avondale FY2026 Rates and Fees Schedule, Resolution 3050-612
Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Resolution 1045-0725

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Avondale, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the City of Avondale.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for panel work, service entrance changes, wiring, and other hard-wired electrical work not covered by the code's minor-repair exemptions
  • Governed by the 2023 NEC as adopted by the City of Avondale, including a temporary (through 9/1/2026) exception to GFCI protection for listed HVAC equipment under Section 210.8(F)
  • Exempt work includes: listed cord-and-plug temporary decorative lighting, reinstallation of attachment plug receptacles, replacement of branch-circuit overcurrent devices of the required capacity in the same location, low-voltage (<25V, <50W) wiring, and minor repairs/lamp replacement
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Electric'

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via the Avondale Citizen Portal
  • OptionalLoad Calculations / Panel Schedule / One-Line DiagramRequired per the Residential Submittal Checklist's Electrical section for service upgrades and new electrical service

Fee schedule

Fee typeAmountNotes
Electrical Permit$112.00City of Avondale FY2026 Rates and Fees Schedule, Mechanical/Plumbing/Electrical (MPE), Resolution 1045-0725, effective 9/1/2025
Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Avondale, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the City of Avondale, including a stricter gas-piping minimum burial depth and added push-to-connect-valve restrictions.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not covered by the code's minor-repair exemptions
  • Governed by the 2024 IPC as adopted by the City of Avondale
  • Gas piping minimum burial depth: 12 inches for metal piping, 18 inches for plastic piping (Avondale-amended G2415.12/IFGC 404.12)
  • Push-to-connect plastic valves are prohibited for use as shutoff, stub-out, or fixture supply valves (P2605.1.2, Added); non-metallic water distribution piping penetrating a wall/floor must use a rigid metal stub-out (P2605.1.1, Added)
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Plumbing'

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted via the Avondale Citizen Portal
  • RequiredFixture calculations, isometric (waste/vent, water, gas), water supply system planPer the Residential Submittal Checklist's Plumbing section

Fee schedule

Fee typeAmountNotes
Plumbing Permit$96.00City of Avondale FY2026 Rates and Fees Schedule, Mechanical/Plumbing/Electrical (MPE), Resolution 1045-0725, effective 9/1/2025
Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in Avondale, governed by the 2024 International Mechanical Code (IMC) as adopted and amended by the City of Avondale, and subject to the City's required minimum/maximum indoor temperature standard (IBC 1203.1).

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems not covered by the code's portable-appliance exemptions
  • Governed by the 2024 IMC as adopted by the City of Avondale
  • Interior occupied spaces must be capable of maintaining minimum 68°F and maximum 82°F (AC) or 88°F (evaporative cooling) at 3 ft above the floor (IBC 1203.1, Amended)
  • Manual J, D, and S calculations and duct layout (size, insulation R-value, register sizes, CFM) required per the Residential Submittal Checklist's Mechanical section
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Mechanical'

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted via the Avondale Citizen Portal
  • RequiredManual J/D/S Calculations and Duct LayoutPer the Residential Submittal Checklist's Mechanical section, referencing IRC Chapters 11 and 15

Fee schedule

Fee typeAmountNotes
Mechanical Permit$90.00City of Avondale FY2026 Rates and Fees Schedule, Mechanical/Plumbing/Electrical (MPE), Resolution 1045-0725, effective 9/1/2025
Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing/roof replacement in Avondale. Unlike some neighboring Maricopa County cities, Avondale's adopted 2024 IBC/IRC amendments do not include a same-material/single-layer re-roofing permit exemption — a building permit is required for reroofing work, billed under the standard Building Permit valuation tiers.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for re-roofing/roof replacement; Avondale's IRC R105.2/IBC 105.2 permit-exempt work lists do not include a re-roofing carve-out (the only roofing-related exception found in the adopted code amendments is an IECC energy-code compliance exception for 'roof recover' and certain roof replacements, which affects ENERGY compliance obligations only, not whether a building permit is required)
  • Governed by the 2024 IRC/IBC roofing provisions as adopted and amended by the City of Avondale
  • Roof plan showing existing framing, proposed material, and roof slope classification required as part of the standard Residential or Commercial Submittal Checklist
  • Valuation-based Building Permit Fee (Tiers A-H) applies, as with any other building-permit-requiring scope of work

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Avondale Citizen Portal, Application Type 'Residential' or 'Commercial'
  • RequiredResidential Submittal Checklist / Commercial Submittal ChecklistCity of Avondale submittal checklists; Roof Plan is a required Structural submittal item

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (Tiers A–H)Same valuation-tier schedule as new construction (see Residential Building Permit fee tiers)City of Avondale FY2026 Rates and Fees Schedule, Building Permit Fees, Resolution 3050-612 — no dedicated flat re-roofing fee line is published; re-roofing is billed under the general valuation-based Building Permit Fee tiers like any other building-permit scope
Building Plan Review Fee65% of the Building Permit FeeCity of Avondale FY2026 Rates and Fees Schedule, Resolution 3050-612

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop residential solar photovoltaic systems in Avondale. Governed by the City's dedicated Solar Plan Review Checklist (rev. 12/23/25), A.R.S. § 9-468 (solar construction permit standards), and the 2023 NEC as adopted and amended by the City of Avondale. Applications are submitted via the Avondale Citizen Portal under Application Type 'Solar'.

Verified 2026-07-06 · Source

Requirements

  • Plans must list the current adopted codes in force (2024 IRC/IBC/IFC and 2023 NEC) and indicate scale/north direction on the site plan
  • Photovoltaic installation location must be shown on construction plans, including the roof plan and elevations, with skylight locations and access indicated, per A.R.S. § 9-468
  • Mounting/racking details, structural calculations, and manufacturer cut sheets must accompany plans; a structural engineer's design may still be required
  • Electrical diagrams must include one-line or three-line diagrams; inverter cut sheets/listings required for DC-to-AC conversions
  • A 3-foot wide clear pathway must be maintained around the array for residential installations (6 feet for commercial)
  • A licensed structural engineer's approval is required when the building is more than 30 years old, or when the combined additional roof weight exceeds 5 lbs per square foot
  • Fences and retaining walls associated with a solar installation require a separate permit — not covered under the solar permit

Required documents

  • RequiredSolar Plan Review ChecklistCity of Avondale Solar Plan Review Checklist (rev. 12/23/25), listing IRC/IBC section citations and A.R.S. § 9-468 references for structural calcs, PV mounting details, one-line/three-line diagrams, and inverter cut sheets
  • RequiredBuilding Permit ApplicationSubmitted via the Avondale Citizen Portal, Application Type 'Solar'; Solar Derate and Solar Battery checkboxes indicate scope

Fee schedule

Fee typeAmountNotes
Residential Solar Photovoltaic Power Systems — New Installation$230.00City of Avondale FY2026 Rates and Fees Schedule, Solar category, Resolution 1045-0725, effective 9/1/2025
Residential Solar Photovoltaic Power Systems — Modification$185.00City of Avondale FY2026 Rates and Fees Schedule, Solar category, Resolution 1045-0725
Commercial Solar Photovoltaic Power Systems (New Installation or Modification)Per Permit — Based on total project valuation (labor & materials), calculated using Building Permit Tiers A-HCity of Avondale FY2026 Rates and Fees Schedule, Solar category, Resolution 1045-0725

EV Charger / EVSE Installation Permit

Verified

Avondale has no separate permit type, fee line, or application category for electric vehicle charging station (EVSE) installation. Installing a Level 2 (240V) home or commercial EV charger requires a standard Electrical Permit, governed by the 2023 NEC as adopted and amended by the City of Avondale, the same as any other new dedicated circuit or panel work.

Verified 2026-07-20 · Source

Requirements

  • A City of Avondale Electrical Permit is required to install a new dedicated circuit, receptacle, or hardwired connection for an EV charging station (Level 2/240V or commercial Level 3 equipment); this is the same permit type used for any new electrical circuit, not a distinct 'EV charger permit'
  • Governed by the 2023 NEC as adopted by the City of Avondale (no EVSE-specific local amendment was found in the City's Building Code Adoption ordinance document)
  • Per neighboring Maricopa County jurisdictions' common practice (e.g., Pima County), a permit is generally NOT required only where an existing 120V receptacle is used with a UL-listed cord-and-plug charger; new circuits or 240V hardwired installations require a permit — Avondale's own code adoption document does not publish an EVSE-specific exemption, so this should be confirmed with Avondale Building Services Division on a per-project basis
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Electric'
  • Load calculations may be required by the Building Services Division for service-panel capacity review where the added EV circuit affects total service load

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via the Avondale Citizen Portal; no separate EV-specific application form is published by the City

Fee schedule

Fee typeAmountNotes
Electrical Permit (covers EV charger/EVSE circuit installation — no distinct EV/EVSE fee line published)$112.00 flat
City of Avondale FY2026 Rates and Fees Schedule (effective 9/1/2025), Mechanical/Plumbing/Electrical (MPE) category, Resolution 1045-0725. Show full citation

City of Avondale FY2026 Rates and Fees Schedule (effective 9/1/2025), Mechanical/Plumbing/Electrical (MPE) category, Resolution 1045-0725. The published fee schedule was checked directly and contains no separate 'EV charger', 'EVSE', or 'electric vehicle charging station' line item; EV charging circuit work falls under the general flat Electrical Permit fee.

Application Processing Fee$102.00City of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in Avondale. Requires coordination with Maricopa County Air Quality Department (MCAQD) NESHAP asbestos notification at least 10 business days before demolition begins.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Avondale city limits
  • An asbestos NESHAP notification must be submitted through the MCAQD AQD Online Portal at least 10 business days prior to the start of any regulated renovation or demolition project (per the Building Permit Application Standard Conditions, citing maricopa.gov/1701/Asbestos)
  • Required safeguards during demolition (means of egress, fire protection, sanitary facilities) must be maintained at all times per IBC Chapter 33
  • Major Demolition (whole-structure) is billed as a percentage of total valuation using the Building Permit Tiers A-H; Minor Demolition (partial/accessory) is a flat fee
  • Project is not legally complete until an approved final inspection has occurred

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Avondale Citizen Portal, Purpose of Work 'Demo'
  • RequiredMCAQD Asbestos NESHAP NotificationFiled through the Maricopa County Air Quality Department's AQD Online Portal at least 10 business days before demolition/regulated renovation begins

Fee schedule

Fee typeAmountNotes
Major DemolitionPercentage of total valuation, based on Building Permit Tiers A-HCity of Avondale FY2026 Rates and Fees Schedule, Demolition category, Resolution 1045-0725, effective 9/1/2025
Minor Demolition$91.00City of Avondale FY2026 Rates and Fees Schedule, Demolition category, Resolution 3050-612 (7/18/2012)
Demolition Administrative Fee25% of actual costCity of Avondale FY2026 Rates and Fees Schedule, Resolution 1045-0725

Swimming Pool / Spa Permit

Verified

Required for in-ground and non-exempt above-ground swimming pools and spas in Avondale, governed by the 2024 International Swimming Pool and Spa Code (ISPSC) as adopted and amended by the City, with a stricter barrier-height requirement than the model code.

Verified 2026-07-06 · Source

Requirements

  • Site plan required showing pool and equipment placement, water depths, and distances to property lines/buildings from all sides of the pool; provide engineering plans or pool standards if not already on file
  • Waterline to rear/side property line minimum 3 feet; waterline to pool equipment minimum 5 feet; pool walls/bond beam may not be located within a recorded easement without written, recorded approval of the easement holder
  • Front-yard pools are not allowed; side-yard pools are allowed; decking and equipment are allowed within easements
  • Grounding required for any metal within 5 feet of the waterline
  • Gas pool heaters must be at least 5 feet from any window (0 feet from the property line is permitted)
  • Pool walls must be engineered to resist all imposed loads, including adjacent foundations
  • Barrier (fence) minimum height 5 feet (60 inches, per the City's ISPSC Section 305.2.1 amendment); single gates must be self-closing/self-latching and swing outward from the yard/pool area; double gates must be padlocked; additional requirements per A.R.S. § 36-1681
  • Prefabricated above-ground pools under 18 inches deep and 5,000 gallons or less are exempt from a permit (IRC/IBC 105.2 amendment); all other pools require a permit

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Avondale Citizen Portal, Application Type 'Pool/Spa'; 'Pool Standard Plan: Yes/No' checkbox on the application
  • RequiredSite Plan / Engineering Plans or Pool StandardsPer the City's Swimming Pool Requirements handout (rev. 10.26.2023): showing pool/equipment placement, water depths, and distances to property lines

Fee schedule

Fee typeAmountNotes
Swimming Pools/Spas — Above Ground$110.00City of Avondale FY2026 Rates and Fees Schedule, Pool category, Resolution 1045-0725, effective 9/1/2025
Swimming Pools/Spas — Standard (Standard Plan on file)$653.00City of Avondale FY2026 Rates and Fees Schedule, Pool category, Resolution 1045-0725
Swimming Pools/Spas — Non-Standard$785.00City of Avondale FY2026 Rates and Fees Schedule, Pool category, Resolution 1045-0725

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)Later version (2026-07-23) →View current record →All versions →

Permalink: /arizona/maricopa-county/avondale/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: c22d865

Reproducible from PermitBase’s version-controlled dataset, commit c22d865.