This is PermitBase’s published record for Guadalupe as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Guadalupe building permits
VerifiedGuadalupe, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired prior to constructing any new single-family residential structure, or an improvement involving more than 25% of an existing structure, in the Town of Guadalupe. Reviewed against the 2012 Uniform Building Code (UBC) as adopted and amended by the Town. Applications are submitted with three (3) sets of plans in person at Town Hall or by email to the Building Inspector.
Verified 2026-07-06 · Source
Requirements
- Building permit required prior to any new construction or any improvement involving more than 25% of an existing structure (Town Code § 150.20)
- Plans reviewed against the 2012 Uniform Building Code (UBC 2012) as adopted by the Town, with Town-specific Dwelling Unit Standards (§ 150.21): minimum 24-ft livable width, minimum 3:12 roof pitch or equivalent parapet/mansard treatment, permitted exterior facade materials, permanent concrete/masonry foundation
- Completed Permit Application plus three (3) sets of construction plans must be submitted (site plan with setbacks and existing/proposed structures, demolition plans if applicable, landscape details, foundation plan, floor plans, structural details)
- Project is first reviewed for zoning compliance before proceeding to plan review (plan check)
- Must also conform to the Town's zoning ordinance in addition to Chapter 150 (Town Code § 150.02)
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Fillable Town of Guadalupe Building Permit Application; return completed application with three (3) sets of plans to the Building Safety Department at Town Hall or email to binspector@guadalupeaz.org
- RequiredSite PlanShowing setbacks and all existing and proposed structures, including items to remain or be removed
- RequiredFoundation Plan, Floor Plans, and Structural DetailsComplete construction drawing set; an electronic copy is preferred
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | $50 (valuation $1-$500); $50 + $5 per additional $100 to $2,000; $150 + $21 per additional $1,000 to $25,000; $850 + $19 per additional $1,000 to $50,000; $1,450 + $10 per additional $1,000 to $100,000; $2,150 + $8 per additional $1,000 to $500,000; $6,000 + $6 per additional $1,000 to $1,000,000; $9,700 + $4 per additional $1,000 above $1,000,000 | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020.' A parallel republication of this same fee table in the Town Code of Ordinances § 150.01(B), hosted by American Legal Publishing, shows slightly different marginal per-$1,000 rates in several brackets (see localAmendments note on this discrepancy) — this dataset uses the Town's own attached Fee Schedule PDF as authoritative. |
| Inspections outside normal business hours (minimum 2 hours) | $50 per hour | Or the total hourly cost to the Town, whichever is greater, per Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020) |
| Reinspection fee | $50 per hour | Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020) |
| Inspection with no fee specifically indicated (minimum 1 hour) | $120 per hour | Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020) |
| Additional plan review required by changes, additions, or revisions to plans | $120 per hour | Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020) |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, garage conversions, patio covers/porches, balconies/decks, and other alterations to existing dwellings in the Town of Guadalupe when the work is new construction or affects more than 25% of the existing structure. Reviewed against the 2012 UBC as adopted by the Town; the Town's own Building Permit Application form has dedicated line items for Room Addition, Tenant Improvement, Patio Cover/Porch, Balcony/Deck, and Garage Conversion.
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, remodels, tenant improvements, patio covers/porches, balconies/decks, and garage conversions that constitute new construction or affect more than 25% of the existing structure (Town Code § 150.20)
- Town of Guadalupe Building Permit Application has dedicated fields for Room Addition (sq ft), Tenant Improvement (sq ft), Patio Cover/Porch (sq ft), Balcony/Deck (sq ft), and Garage Conversion (sq ft)
- Site plan required showing setbacks and all existing and proposed structures, including items to remain or be removed
- Must also conform to the Town's zoning ordinance, including setback requirements (Town Code § 150.02)
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted with three (3) sets of plans in person at Town Hall or by email to binspector@guadalupeaz.org
- RequiredSite PlanShowing existing structure, addition/remodel footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction) | $50 (valuation $1-$500) up to $9,700 + $4 per additional $1,000 above $1,000,000 (full bracket table under residential-building-permit) | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — the Town does not publish a separate valuation table for additions/remodels distinct from new construction; both are billed from the same Building Permit Fee table |
| Additional plan review required by changes, additions, or revisions to plans | $120 per hour | Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020) |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in the Town of Guadalupe, governed by the 2011 National Electrical Code (NEC) as adopted by the Town. The Town's Building Permit Application has dedicated fields for new electrical service, sub-panels, outlets/switches, and motors/transformers/generators.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for new service, sub-panels, outlets/switches, and motor/transformer/generator installation, governed by the 2011 NEC as adopted by the Town (Town Code § 150.15)
- Town of Guadalupe Building Permit Application has dedicated fields for: New service (amps), Sub panels (# and amps), # of Outlets/Switches, and Motor/Transformer/Generator (# and HP)
- Temporary Power Pole permits (including number of sub-poles) are a distinct line item on the same application
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; includes Contractor's License # and Class Code fields
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction; electrical work valuation reviewed under the same Building Permit Fee table) | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — the Town does not publish a separate flat-fee electrical fee schedule; electrical permit fees are computed from contract valuation using the same Building Permit Fee table as all other permit types |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in the Town of Guadalupe, governed by the 2012 Uniform Plumbing Code (UPC) as adopted by the Town. The Town's Building Permit Application itemizes water closets, lavatories, bathtubs/showers, kitchen sinks, water heaters, gas outlets, sewer connections, and private sewage systems.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation/alteration/repair of fixtures, water heaters, and gas piping, governed by the 2012 UPC as adopted by the Town (Town Code § 150.17)
- Town of Guadalupe Building Permit Application itemizes: Water Closets, Lavatories, Bathtubs/Showers, Floor Drains, Kitchen Sinks, Laundry Trays, Clothes Washers, Water Heaters, # of Gas Outlets, Sewer Connections, Private Sewage System, and On-Site Sewer/Water
- Manufactured home installations require a dedicated $750 sewer connection fee in addition to the standard building permit fee
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction) | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat per-fixture plumbing fee schedule is published; fees are computed from contract valuation |
| Sewer Connection Fee (manufactured home installations) | $750 | Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020) — applies specifically to manufactured home building permits, not general plumbing work |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in the Town of Guadalupe, governed by the 2012 Uniform Mechanical Code (UMC) as adopted by the Town. The Town's Building Permit Application itemizes FAU (forced air units), boilers/compressors, air handlers, floor/wall/suspended heaters, spray booths/exhaust hoods, ventilation fans, and ductwork.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ventilation systems, governed by the 2012 UMC as adopted by the Town (Town Code § 150.16)
- Town of Guadalupe Building Permit Application itemizes: FAU up to/over 100,000 BTU, Boilers/Compressors (Max 3 HP/100,000 Btu and Max 15 HP/100,000 Btu tiers), Air Handler (up to/over 10,000 cfm), Floor/Wall/Suspended Heater, Spray Booth/Exhaust Hood, Ventilation (Bath) Fan, and Ductwork
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction) | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat mechanical/HVAC fee schedule (e.g., no flat AC-replacement fee) is published; fees are computed from contract valuation |
Re-Roofing Permit
VerifiedRequired for re-roofing (re-roof and/or tear-off) in the Town of Guadalupe. The Town's Building Permit Application has dedicated fields for Re-Roof (square footage of material) and Tear-Off, reviewed under the 2012 UBC as adopted by the Town.
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing; the Town's Building Permit Application has dedicated 'Re-Roof' (sq. ft. of material) and 'Tear-Off' (yes/no) fields
- Reviewed against the 2012 UBC as adopted by the Town (Town Code § 150.01)
- Must conform to the Town's Dwelling Unit Standards roof-pitch/roofline requirements where applicable to the structure (Town Code § 150.21(D))
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; indicate Re-Roof square footage of material and whether a Tear-Off is included
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction) | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat re-roofing fee is published; fees are computed from contract valuation |
Demolition Permit
VerifiedRequired for demolition of any structure in the Town of Guadalupe. The Town's Building Permit Application has a dedicated Demolition section (# of Structures, Sewer cap off).
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a structure within Town limits; the Town's Building Permit Application has a dedicated Demolition section with '# of Structures' and 'Sewer cap off' fields
- Demolition plans, where applicable, are part of the plan submittal requirements described on the Town's Plan Review / Inspections page
- Governed generally by the 2012 UBC and the Uniform Code for the Abatement of Dangerous Buildings, most current edition, as adopted by the Town (Town Code § 150.01, § 150.18)
Required documents
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; indicate number of structures and whether sewer cap-off is required
- OptionalDemolition PlansRequired if applicable, per the Town's Plan Review / Inspections submittal requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (same table as new construction) | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat demolition fee is published; fees are computed from contract valuation |
Manufactured Home Installation Permit
VerifiedRequired for placement of a manufactured home in the Town of Guadalupe, a two-step process: first a Conditional Use Permit from the Town Council, then a building permit from the Building Safety Department. Governed by Town Code § 150.21 (Dwelling Unit Standards) and the Town's dedicated Manufactured Home Requirements document (rev. 02/07/2020).
Verified 2026-07-06 · Source
Requirements
- Property owner or representative must first obtain a Conditional Use Permit (CUP) to locate a manufactured home on a lot; this includes a public hearing before the Guadalupe Town Council
- After CUP approval, a building permit must be obtained from the Town of Guadalupe; building permit fees are based on the value of the manufactured home and include a $750 sewer connection fee
- Manufactured homes may not be placed on any lot with frontage on Avenida del Yaqui or Guadalupe Road, and must be owner-occupied (Resolution 95-19)
- Must be ground-set on a permanent foundation per the Town's detail packet or an engineer-stamped foundation plan
- Installation instructions meeting HUD Title 24 Subpart A-3285.2 must be submitted with the building permit
- Electrical panels must be inspected by both the Town of Guadalupe and Salt River Project (SRP)
- Must meet all minimum yard setbacks within the zoning district, including patios and carports
- Must have an affixed decal certifying HUD-compliant inspection and construction
- A Certificate of Occupancy must be issued by the Town before the manufactured home may be occupied
- Modifications to manufactured homes are prohibited; repairs/modifications exceeding 50% of the unit's floor/wall/roof area are prohibited and grounds for removal
Required documents
- RequiredConditional Use Permit ApplicationRequired before a building permit can be sought; includes a public hearing before Town Council (approx. 60-day processing time)
- RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted after CUP approval; submitted in person at Town Hall or by email to binspector@guadalupeaz.org
- RequiredEngineer-Stamped Foundation Plan (or Town-provided foundation detail)Required for ground-set permanent foundation installation
- RequiredHUD Title 24 Subpart A-3285.2 Installation InstructionsManufacturer's installation instructions from the Office of Manufactured Housing, submitted with the building permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Conditional Use Permit Application Fee | $50 | Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020) |
| Public Hearing Continuance Fee (if requested) | $25 per occurrence | Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020) |
| Building Permit Fee — Based on Valuation of the manufactured home | $50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee table | Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' |
| Sewer Connection Fee | $750 | Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020) |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Guadalupe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.